Sungei Kadut MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Sungei Kadut MRT station is a future Mass Rapid Transit interchange station on the North–South (NSL) and Downtown (DTL) lines, located in Sungei Kadut, Singapore. The station was first announced as a provisional station on the NSL Woodlands Extension in the 1990s. In 2019, the Land Transport Authority (LTA) confirmed plans for its construction as part of the Land Transport Master Plan (LTMP) 2040. The station is expected to be completed in 2035.

Coordinates1°24′48″N 103°44′56″E
SystemFuture Mass Rapid Transit (MRT) interchange and terminus
OperatorSBS Transit (Downtown Line)
SMRT Trains (North–South Line)
Quick facts General information, Coordinates ...
Sungei Kadut
 NS6  DE2 
双溪加株
சுங்கை காடூட்
Sungei Kadut MRT station site
General information
Coordinates1°24′48″N 103°44′56″E
SystemFuture Mass Rapid Transit (MRT) interchange and terminus
OwnerLand Transport Authority
OperatorSBS Transit (Downtown Line)
SMRT Trains (North–South Line)
Line
PlatformsSide (North–South Line)
Construction
Structure type
Underground (Downtown Line)
Elevated (North–South Line)
Platform levels
2
AccessibleYes
History
Opening2035; 9 years' time (2035)
Former namesKadut
Services
Preceding station Mass Rapid Transit Following station
Yew Tee
towards Jurong East
North–South Line
Future service
Kranji
Terminus Downtown Line
Future service
DE1
towards Sungei Bedok
Location
Sungei Kadut is located in Singapore Rail
Sungei Kadut
Sungei Kadut
Location within Singapore Rail
Close

History

The future station will be built where the train is.

Planning

When the NSL Woodlands Extension was announced in the 1990s, Sungei Kadut (then named Kadut under station code N19) was unveiled as a provisional station as part of the extension. The station was planned to only be built in conjunction with the redevelopment of the Sungei Kadut Industrial Estate.[1][2]

In LTMP 2040, LTA announced that Sungei Kadut station will be built as an infill station between Kranji and Yew Tee stations, serving upcoming industrial developments in the area by JTC Corporation and the 18 hectares (0.18 km2) Agri-Food Innovation Park. In addition, the station will interchange with the DTL, serving as the line's new western terminus after it is extended from Bukit Panjang station.[3][4] Sungei Kadut will be the third purpose-built station connecting both elevated and underground rail services, after Sengkang and Punggol.[5]

Construction

On 15 January 2026, the contract for the tunnelling works between DE1 and Sungei Kadut stations was awarded to a joint venture between Woh Hup Engineering Pte Ltd and Underground Technology Engineering Construction Pte Ltd for S$326 million (US$243.97 million).[6] The contract for the design and construction of the station was awarded to a joint venture between Samwoh Corporation and China Communications Construction Company the following month, at a sum of S$450 million (US$336.77 million).[7] Originally scheduled to begin by end-2025,[8] construction of the station will start in Q2 2026 with completion in 2035. Additionally, LTA is studying a 1.5 kilometres (0.93 mi) viaduct to connect the NSL to Gali Batu Depot which currently serves the DTL only.[9]