Tamil Nadu Green Energy Corporation Limited

From Wikipedia, the free encyclopedia

Tamil Nadu Green Energy Corporation Limited
Company typeState-owned enterprise
IndustryElectric power generation
PredecessorTamil Nadu Generation and Distribution Corporation
Tamil Nadu Energy Development Agency
Founded2024
HeadquartersChennai, Tamil Nadu, India
Area served
Tamil Nadu
Key people
  • Dr. J Radhakrishnan IAS Chairman
  • Dr. Aneesh Sekhar IAS MD
ProductsElectricity
ServicesPower generation (renewable), hydro generation, solar, wind, energy storage
RevenueIncrease1,607.11 crore (US$190 million) (2024–25)[1]
Increase588.22 crore (US$70 million) (2024–25)[1]
Increase242.27 crore (US$29 million) (2024–25)[1]
Total assetsIncrease81,526.69 crore (US$9.6 billion) (2024–25)[1]
Total equityIncrease−1,125.31 crore (US$−130 million) (2024–25)[1]
ParentTNEB Limited
Websitewww.tngecl.org

Tamil Nadu Green Energy Corporation Limited (TNGECL) is a state-owned renewable energy company of the Government of Tamil Nadu. It was established in 2024 following the restructuring of Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) to focus exclusively on renewable energy development including hydro, solar, wind and energy storage projects.[2]

The company was formed by transferring the renewable energy activities of TANGEDCO and merging the Tamil Nadu Energy Development Agency (TEDA) into the new corporation.[2][3][4]

TNGECL operates as a subsidiary of Tamil Nadu Electricity Board (TNEB) and is responsible for expanding renewable energy capacity as part of Tamil Nadu's clean energy transition.[5]

Electricity generation in Tamil Nadu was historically managed by the Tamil Nadu Electricity Board. In 2010, the board was reorganised into TNEB Limited with operational subsidiaries.[6] In January 2024, the Government of Tamil Nadu approved further restructuring of TANGEDCO into separate generation, distribution and renewable energy companies to improve operational efficiency and accelerate renewable energy adoption.[2] As part of this reform Renewable energy activities were transferred to TNGECL[7] TNGECL also absorbed the functions of TEDA, which had previously served as the nodal renewable energy promotion agency of the state.[8]

Operations

TNGECL is responsible for development and management of renewable energy projects including hydroelectric stations, solar parks, wind farms and storage systems.[9] The company also implements decentralised solar programmes and supports renewable energy procurement initiatives.[10]

Renewable Energy Installed Capacity

As of 2024, Renewable Energy Installed Capacity is 25,269.35 MW

Renewable energy installed capacity[11]
SourceInstalled capacity (MW)
Wind11,398.31
Solar10,655.95
Biomass206.79
Co-generation (Bagasse)684.40
Hydro2,323.90
Total renewable energy 25,269.35

Hydroelectric power stations

As of 2024, Tamil Nadu Green Energy Corporation Limited operates 47 hydroelectric power stations with a total installed capacity of 2,321.90 MW.[12]

Hydroelectric power stations operated by TNGECL
Sl. No Power station District Type Units Unit configuration Installed capacity (MW) Status
1Mettur Dam PHSalemIrrigation hydro44×12.5 MW50Operational
2Mettur Tunnel PHSalemIrrigation hydro44×50 MW200Operational
3Lower Mettur Barrage PH-ISalemIrrigation hydro22×15 MW30Operational
4Lower Mettur Barrage PH-IIErodeIrrigation hydro22×15 MW30Operational
5Lower Mettur Barrage PH-IIIErodeIrrigation hydro22×15 MW30Operational
6Lower Mettur Barrage PH-IVErodeIrrigation hydro22×15 MW30Operational
7Lower Bhavani Micro Hydel PHErodeIrrigation hydro44×2 MW8Operational
8Lower Bhavani Right Bank Canal PHErodeIrrigation hydro22×4 MW8Operational
9Bhavani Kattalai Barrage PH-INamakkalIrrigation hydro22×15 MW30Operational
10Bhavani Kattalai Barrage PH-IIErodeIrrigation hydro22×15 MW30Operational
11Bhavani Kattalai Barrage PH-IIINamakkalIrrigation hydro22×15 MW30Operational
12Sathanur Dam PHTiruvannamalaiIrrigation hydro11×7.5 MW7.5Operational
13Bhavani Barrage PH-ICoimbatoreIrrigation hydro22×5 MW10Operational
14Bhavani Barrage PH-IICoimbatoreIrrigation hydro22×5 MW10Operational
15Sarkarpathy PHCoimbatoreIrrigation hydro11×30 MW30Operational
16Sholayar PH-ICoimbatoreIrrigation hydro22×42 MW84Operational
17Sholayar PH-IICoimbatoreIrrigation hydro11×25 MW25Operational
18Kadamparai Pumped Storage PHCoimbatorePumped storage hydro44×100 MW400Operational
19Aliyar Mini PHCoimbatoreIrrigation hydro22×1.25 MW2.5Operational
20Aliyar PHCoimbatoreNon-irrigation hydro11×60 MW60Operational
21Thirumurthy Mini PHTiruppurIrrigation hydro33×0.65 MW1.95Operational
22Amaravathi PHTiruppurIrrigation hydro22×2 MW4Operational
23Poonachi Mini PHCoimbatoreNon-irrigation hydro22×1 MW2Operational
24Periyar PHTheniIrrigation hydro44×42 MW168Operational
25Papanasam PHTirunelveliIrrigation hydro44×8 MW32Operational
26Servalar PHTirunelveliIrrigation hydro11×20 MW20Operational
27Vaigai Small PHTheniIrrigation hydro22×3 MW6Operational
28Periyar-Vaigai Mini PH-ITheniIrrigation hydro22×2 MW4Operational
29Periyar-Vaigai Mini PH-IITheniIrrigation hydro22×1.25 MW2.5Operational
30Periyar-Vaigai Mini PH-IIITheniIrrigation hydro22×2 MW4Operational
31Periyar-Vaigai Mini PH-IVTheniIrrigation hydro22×1.25 MW2.5Operational
32Suruliyar PHTheniNon-irrigation hydro11×35 MW35Operational
33Kundah PH-INilgirisNon-irrigation hydro33×20 MW60Operational
34Kundah PH-IINilgirisNon-irrigation hydro55×35 MW175Operational
35Kundah PH-IIICoimbatoreNon-irrigation hydro33×60 MW180Operational
36Kundah PH-IVCoimbatoreNon-irrigation hydro22×50 MW100Operational
37Kundah PH-VNilgirisNon-irrigation hydro22×20 MW40Operational
38Kundah PH-VINilgirisNon-irrigation hydro11×30 MW30Operational
39Pykara PHNilgirisNon-irrigation hydro63x7 MW 1x11 MW 2x13.6 MW59.2Operational
40PUSHEPNilgirisNon-irrigation hydro33×50 MW150Operational
41Moyar PHNilgirisNon-irrigation hydro33×12 MW36Operational
42Mukurthy Mini PHNilgirisNon-irrigation hydro22×0.35 MW0.7Operational
43Pykara Micro PHNilgirisNon-irrigation hydro11×2 MW2Operational
44Maravakandy Mini PHNilgirisNon-irrigation hydro11×0.75 MW0.75Operational
45Perunchani PHKanyakumariIrrigation hydro22×0.65 MW1.3Operational
46Kodayar PH-IKanyakumariNon-irrigation hydro11×60 MW60Operational
47Kodayar PH-IIKanyakumariNon-irrigation hydro11×40 MW40Operational

Upcoming hydroelectric projects

Upcoming hydroelectric and pumped storage projects of Tamil Nadu Green Energy Corporation Limited
Sl. No Project District Type Unit configuration Installed capacity (MW) Estimated cost (₹ crore) Development mode Status Expected commissioning
1 Kollimalai Hydroelectric Project Namakkal Conventional hydro 1 × 20 MW 20 591.20 State sector Under construction (67% progress) 2025–26
2 Kundah Pumped Storage Project Nilgiris Pumped storage hydro 4 × 125 MW 500 3,523.37 State sector Under construction 2025–26
3 Upper Bhavani Pumped Storage Project Nilgiris Pumped storage hydro 4 × 250 MW 1000 3,905 Joint venture (NTECL) Planned TBA
4 Sandy Nalla Pumped Storage Project Nilgiris Pumped storage hydro 4 × 300 MW 1200 PPP mode Proposed TBA
5 Sigur Pumped Storage Project Nilgiris Pumped storage hydro 4 × 200 MW 800 PPP mode Proposed TBA
6 Vellimalai Pumped Storage Project Kanyakumari Pumped storage hydro 4 × 275 MW 1100 PPP mode Proposed TBA
7 Kodayar Pumped Storage Project Kanyakumari Pumped storage hydro 6 × 250 MW 1500 10,838 PPP mode DPR preparation TBA
8 Manalar Pumped Storage Project Theni Pumped storage hydro 6 × 200 MW 1200 9,887 PPP mode DPR preparation TBA
9 Aliyar Pumped Storage Project Coimbatore Pumped storage hydro 4 × 175 MW 700 2,504 PPP mode DPR preparation TBA
10 Palar–Porathalar Pumped Storage Project Dindigul Pumped storage hydro 4 × 275 MW 1100 4,254 PPP mode DPR preparation TBA
11 Manjalar Pumped Storage Project Theni Pumped storage hydro 2 × 250 MW 500 2,464 PPP mode DPR preparation TBA
12 Sillahalla Stage-II Pumped Storage Project Nilgiris Pumped storage hydro 4 × 250 MW 1000 4,918 PPP mode DPR preparation TBA
13 Chattar Pumped Storage Project Kanyakumari Pumped storage hydro 4 × 275 MW 1100 4,707 PPP mode DPR preparation TBA
14 Karaiyar Pumped Storage Project Tirunelveli Pumped storage hydro 4 × 250 MW 1000 4,589 PPP mode DPR preparation TBA
15 Mettur Pumped Storage Project Salem Pumped storage hydro 4 × 250 MW 1000 4,434 PPP mode DPR preparation TBA
16 Athur Pumped Storage Project Dindigul Pumped storage hydro 2 × 150 MW 300 1,718 PPP mode DPR preparation TBA
17 Sillahalla Stage-I Pumped Storage Project Nilgiris Pumped storage hydro 4 × 250 MW 1000 4,952 State sector DPR preparation TBA