Taratala metro station

From Wikipedia, the free encyclopedia

LocationDiamond Harbour Rd, Naskarpur
Kolkata, West Bengal 700034
India
Coordinates22°30′31″N 88°19′14″E / 22.50863°N 88.32049°E / 22.50863; 88.32049
Taratala

তারাতলা
General information
LocationDiamond Harbour Rd, Naskarpur
Kolkata, West Bengal 700034
India
Coordinates22°30′31″N 88°19′14″E / 22.50863°N 88.32049°E / 22.50863; 88.32049
SystemKolkata Metro
Operated byMetro Railway, Kolkata
Line Purple Line 
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
ParkingNo
AccessibleYes Disabled access
Other information
StatusOperational
Station codeKTRT
History
Opened30 December 2022; 3 years ago (2022-12-30)
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
Majerhat
Terminus
Purple Line Behala Bazar
towards Joka
Location

Taratala is the elevated northern metro station on the Purple Line of Kolkata Metro which is located in the Taratala area of southern Kolkata, West Bengal, India. This station is named after the locality in which the station is located. The station is elevated above Diamond Harbour Road.[1][2]

This station is located in Taratala area. The geographical location of the station is 22.4987215°N 88.3146276°E. The previous station of the station is Behala Bazar metro station at a distance of 1.03 km and the next station is Majerhat metro station at a distance of 1.25 km.[3][4]

History

Purple Line was approved in the railway budget for the financial year 2010-2011 and Rs 2,6519 crore was allocated for the construction work. In October 2011, NVRL won the tender for the construction of the Metro Corridor from Joka to Esplanade along with the Thakurpukur metro station.[5]

Trial runs on the 6.5-km Joka-Taratla stretch of Kolkata Metro's Purple Line began in mid-September 2022, and it received mandatory Commissioner of Railway Safety (CRS) clearance in November.[6]

The Joka–Taratala stretch was inaugurated by Prime Minister Narendra Modi on 30 December 2022 in the presence of West Bengal Chief Minister Mamata Banerjee and Railway Minister Ashwini Vaishnaw. Some students from schools like St Thomas Boys School were granted the rare opportunity to be the first ones to ride in this Joka–Taratala stretch after the inauguration.[6][7]

After lot of hardships and developmental work, the Taratala-Majerhat section of Purple Line was inaugurated on 7 March 2024.[8]

Station layout

Metro arriving at Taratala Metro Station during the 1st run on the opening day Taratala Metro Station, which belongs to Purple Line of Kolkata Metro, is structurally an elevated metro station. The station has total 3 levels. Station entrances and exits begin or end at the first level or ground level. Second level or L1 or intermediate level houses station fare control, station agents, metro card vending machines, crossovers etc. The third level or L2 or the final level houses the platforms and rail tracks. The station is 200 meters long and 25 meters wide.

The station is being built with state-of-the-art technology. The station has 4 entrances and exits for entry and exit. The second level of the station has ticket collection center, ticket validator for ticket examination. The station will have escalators for the convenience of passengers. It is equipped with several modern amenities, such as escalators, lifts, CCTV cameras, and public address systems, to ensure the safety and convenience of passengers. Besides, the station will have drinking water and toilet facilities.[9]

L2 Side platform, Doors will open on the left Disabled access
Platform 2 Towards Joka (Behala Bazar)
Platform 1 ← Towards Majerhat (terminus)
Side platform, Doors will open on the left Disabled access
L1 Concourse Fare control, station agent, Metro QR ticket vending machines, crossover
G Street level Exit/Entrance

Electricity and signal systems

Like the other stations and lines of the Kolkata Metro, this station will use 750 volts DC power supply by the third railway to operate the trains.

Train movement will be conducted at this station and on the railway by communication-based train control signal system. This signal system can operate a 5 second interval train. Currently this automatic signalling system is not activated and only one metro track is operational.[10]

Finance

Indian Railways has spent Rs 2,477.25 crore to construct six stations and metro rail system on the 6.5 km long Joka-Taratla route including Taratala metro station.[6]

Connections

Bus

Ajanta Cinema Bus Stop is 170 m (560 ft) to 800 m (2,600 ft) away from the metro Station respectively.[3][11]

Rail

Majerhat is 1.4 km (0.87 mi) away from the metro station via NH 12.[3][12]

Air

Behala Airport is 4.4 km (2.7 mi) via Behala Flying Club Road and Taratala Road.[3][13]

See also

References

Related Articles

Wikiwand AI