Wikiwand AI

Tavistock MRT station

Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia

Tavistock MRT station is a future underground Mass Rapid Transit station on the Cross Island Line located in Serangoon planning area, Singapore.

Coordinates01°22′12″N 103°51′48″E
SystemFuture Mass Rapid Transit (MRT) station
Quick facts General information, Coordinates ...
Tavistock
 CR10 
达维士笃
தெவிஸ்தொக்
Tavistock MRT station site
General information
Coordinates01°22′12″N 103°51′48″E
SystemFuture Mass Rapid Transit (MRT) station
OwnerLand Transport Authority
Line
Platforms2 (1 island platform)
Tracks2
ConnectionsBus, Taxi
Construction
Structure type
Underground
AccessibleYes
Other information
Station codeTVK
History
Opening2030; 4 years' time (2030)
Services
Preceding station Mass Rapid Transit Following station
Serangoon North Cross Island Line
Future service
Ang Mo Kio
towards Bright Hill
Location
Tavistock is located in Singapore Rail
Tavistock
Tavistock
Location within Singapore Rail
Close

It will be located underneath Ang Mo Kio Avenue 3, at the junction of Tavistock Avenue and Ang Mo Kio Industrial Park 2 as well as being in the vicinity of industries at Ang Mo Kio Industrial Park 2, residential developments around Tavistock, and community amenities such as Chen Su Lan Methodist Children's Home, Ling Kwang Home, Cheshire Home, Serangoon Gardens Food Centre and the French School of Singapore (Lycée Français de Singapour).

History

On 25 January 2019, the Land Transport Authority (LTA) announced that Tavistock station would be part of the proposed Cross Island Line (CRL). The station will be constructed as part of Phase 1, which will consist of 12 stations from the Aviation Park to Bright Hill stations. It was expected to be completed in 2029.[1][2][3] However, the restrictions imposed on construction works due to the COVID-19 pandemic led to delays and the CRL1 completion date was pushed by one year to 2030.[4] A second stage from Bright Hill to Jurong Lake District stations is targeted to open in 2032.

On 13 January 2022, the LTA awarded Contract CR115 to Sato Kogyo (S) at S$407 million (US$298.3 million).[5] The contract involves the design and construction of the station and associated tunnels.[6] Construction works for the station and tunnels are scheduled to begin in the first quarter of 2022, and expected to be completed by 2030. Due to the station's location in a built-up area, the launch shaft for the tunnel boring machine will be at a distance from the station site. Tunnelling through old alluvium soil, the boring machine has to be closely monitored for wear and tear.[5][7][8]

References

Related Articles

Timelines

Top Qs

Fact Checks