University of Alaska Fairbanks Combined Heat and Power Plant

Coal-fired cogeneration plant in Alaska From Wikipedia, the free encyclopedia

The University of Alaska Fairbanks Combined Heat and Power Plant is a coal-fired cogeneration plant at the University of Alaska Fairbanks (UAF) in College, Alaska, near Fairbanks. The plant provides electricity and steam heat to the university's main campus and has a generating capacity of 17 megawatts (MW).[1] It is the newest coal-fired power plant in the United States.[2][3][4]

CountryUnited States
Coordinates64.85392°N 147.81925°W / 64.85392; -147.81925
StatusOperational
Quick facts Country, Location ...
University of Alaska Fairbanks Combined Heat and Power Plant
The older Ben J. Atkinson Power Plant (left) and the Combined Heat and Power Plant (right) in 2024
CountryUnited States
LocationUniversity of Alaska Fairbanks, College, Alaska, Fairbanks North Star Borough
Coordinates64.85392°N 147.81925°W / 64.85392; -147.81925
StatusOperational
Construction began2015
Commission dateFebruary 2020
OwnerUniversity of Alaska Fairbanks
OperatorUniversity of Alaska Fairbanks
Thermal power station
Primary fuelSub-bituminous coal
Turbine technologySteam turbine
Cogeneration?Yes
Power generation
Units operational1 × 17 MW
Nameplate capacity17 MW
Close

History

The plant replaced the coal-fired boilers at the adjacent Ben J. Atkinson Power Plant, which had supplied the campus with heat and electricity since 1964. Concerns about the aging plant increased after a boiler failure in December 1998 caused a prolonged loss of heat and power. UAF subsequently examined at least 14 fuel and energy alternatives before selecting a new coal-fired plant.[5]

Coal was retained in part because of the availability of locally mined sub-bituminous coal from the Usibelli Coal Mine near Healy, about 100 miles (160 km) south of the campus. Fairbanks lacked a natural-gas pipeline, and university officials estimated that imported liquefied natural gas would cost at least four times as much as locally mined coal.[6]

A groundbreaking ceremony was held in August 2014, and construction began the following year.[1][7] Construction was completed in 2018, followed by an extended commissioning period. The plant began supplying all heat and electricity to the campus in February 2020. The project ultimately cost approximately $255 million.[1][6]

Design

The plant uses a circulating fluidized bed boiler capable of producing 240,000 lb/h (30 kg/s) of steam and designed to burn Alaskan coal with the ability to co-fire up to 15 percent biomass. Air-pollution controls include limestone and dry-sorbent injection, a multiclone dust collector and a pulse-jet fabric filter.[8]