The first batch of six engines was constructed in 1911. These engines, entered into service with WAGR in 1912, were only the third Garratt design to be produced and represented a significant step in the development of the type. The second batch, which consisted of seven units, was built in 1913/14 and designated as the Ms class due to the use of superheated steam. One of the engines from the first batch was retrofitted with a superheater and given a Ms classification.[3]
All of the M/Ms class locomotives were utilized to haul trains on the WAGR's light lines. They were withdrawn from service between 1947 and 1955, and all were scrapped.