Wanda–Zhonghe–Shulin line

Under construction MRT route in Taipei From Wikipedia, the free encyclopedia

The Wanda–Zhonghe–Shulin line (Chinese: 萬大—中和—樹林線; also known as Light Green line) is a metro line under construction in Taipei. It is managed by the Taipei City Government Department of Rapid Transit Systems and scheduled to be complete in 2027.[3] Following the Taipei Metro's color coding scheme, the Wanda-Zhonghe-Shulin line will be light green, coding the line as LG. When Phase I is completed, the line is expected to carry 270,000 riders per day, and passengers will be able to travel between the terminus at Zhonghe Senior High School and Taipei Main Station in 25 minutes.[4]

Native name萬大—中和—樹林線
Owner
LocaleTaipei and New Taipei, Taiwan
Termini
Quick facts Overview, Native name ...
Wanda–Zhonghe–Shulin line
Overview
Native name萬大—中和—樹林線
Owner
LocaleTaipei and New Taipei, Taiwan
Termini
Stations22
Color on mapLight green
Service
TypeRapid transit
SystemTaipei Metro
Route numberLG
Operator(s)Taipei Rapid Transit Corporation
Depot(s)Jincheng
Rolling stockAlstom Metropolis[1][2] built in Taubaté
History
Planned opening
  • LG01 - LG09: June 2027
  • LG10 - LG21: June 2031
Technical
Line length22.1 km (13.7 mi)
CharacterUnderground, Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map

(Left arrow  Right arrow)
(Left arrow  Right arrow)
LG01
Chiang Kai-shek Memorial Hall
LG02
Taipei Botanical Garden
LG03
Xiaan
LG04
Kalah
LG05
Yonghe Yongping Elementary School
(Left arrow  Right arrow)
LG06
Zhonghe
LG07
Liancheng Jinhe
LG08
Zhonghe Senior High School
LG08A
Juguang
Juguang Branch Line
Jincheng Depot
LG09
Tingliao
LG10
Qingshui
(Left arrow )
LG11
Tucheng
LG12
Pitang
Yongning
( Right arrow)
LG13
Chenglin Bridge
LG14
Xizhou
LG15
Pengfu
LG16
Beinei
LG17
Shulin
LG18
Tandi
LG19
Taipei Motor Vehicles Office
LG20
Sanjiaopu
LG21
Huilong
(Down arrow )
Note: those in italics are only possible names and might change.
Close

Routes

Wanda–Zhonghe–Shulin line is the medium-capacity route and consists of Phase I and Phase II. Phase I was approved by the Executive Yuan on 12 February 2010.[5] It is split into two phases. Phase I consists of nine underground stations and a depot in Jincheng Road. The 9.5 km long line (Phase I) will connect to the Songshan–Xindian line at Chiang Kai-shek Memorial Hall (LG01), one of its termini. Also, this line goes under the Xindian River between LG04 and LG05.[6] Jincheng Road (LG08) is where the other terminus is located, and will be named as Zhonghe Senior High School Station.[7] A branch line consists of only Zhonghe Senior High School and Juguang stations.

Phase II is approved for construction, too.[8] Its termini are located at Huilong (LG21) and Tingliao (LG09). Stations LG01 to LG10 are underground, while stations LG11 to LG21 are elevated.[9] The Taipei City Government is the local authority. The funds will be borne by the Central Government and the New Taipei City Government. The total project funding is about 55.881 billion NTD. The current plan has been submitted to Ministry of Transportation and Communications on 26 January 2017. The ministry deliberated, and the high-speed railway engineering bureau of the ministry is conducting a written review operation in conjunction with relevant units. The second phase of the route is located within New Taipei City. At present, changes to urban planning and bidding for basic designs have begun. After the Taipei and New Taipei City conferences are held to reach a consensus, the plan will be submitted to the central government for further review. On 2 May 2018, the Ministry of Transportation and Communications merged the project into the second phase of the project of Forward-Looking Infrastructure.

Stations

More information Code, Station name ...
Code[a] Station name Station type City, District Sta. distance (km) Opened date Transfer
Structure Platform Previous Total
Wanda–Zhonghe–Shulin line
(Main route)
LG01 Chiang Kai-shek Memorial Hall
中正紀念堂
Underground Island Taipei Zhongzheng N/a 0.000 Est. June 2027 Tamsui–Xinyi line
Songshan–Xindian line
LG02 Taipei Botanical Garden
植物園
0.700 0.700 N/a
LG03 Xiaan
廈安
0.900 1.600
LG04 Kalah
加蚋
Wanhua 1.000 2.600
LG05 Yonghe Yongping Elementary School
永和永平國小
New Taipei Yonghe 2.000 4.600
LG06 Zhonghe
中和
Split Zhonghe 1.400 6.000 Circular line
LG07 Liancheng Jinhe
連城錦和
Island 0.800 6.800 N/a
LG08 Zhonghe Senior High School
中和高中
1.000 7.800 Juguang branch line
LG09 Unreleased Tucheng 1.800 9.600 N/a
LG10 1.000 10.600 Est. June 2031
LG11 Tucheng
土城
Elevated Side 1.600 12.200 Bannan line
LG12 Unreleased 0.700 12.900 Bannan line (BL02)
LG13 0.800 13.700 N/a
LG14 Split Banqiao 1.700 15.400
Shulin
LG15 0.900 16.300
LG16 Side 0.600 16.900
LG17 1.000 17.900
LG18 Island 1.000 18.900
LG19 Side 1.100 20.000
LG20 0.900 20.900
LG21 Huilong
迴龍
Island Xinzhuang 1.000 21.900 Zhonghe–Xinlu line
Brown line
Wanda–Zhonghe–Shulin line
(Juguang branch line)
LG08 Zhonghe Senior High School
中和高中
Underground Island New Taipei Zhonghe N/a 0.000 Est. June 2027 Main route
LG08A Juguang
莒光
1.600 1.600 Taishan-Banqiao LRT
Close

Dates

  • October 2014: Groundbreaking ceremony held in New Taipei City
  • 8 November 2014: Groundbreaking ceremony held in Taipei City[10]

Notes

  1. Italic for constructing or planning stations

References