World Trade Center Chennai

Skyscraper office buildings in Chennai From Wikipedia, the free encyclopedia

The World Trade Center, Chennai is a 28-storeyed commercial and residential centre in Chennai, India. Located at Perungudi, it was made operational in March 2020. The centre consists of 170,000 square metres (1,800,000 sq ft) of office space. The complex also includes a conference/exhibition centre. The towers are IGBC LEED Platinum and USGBC LEED Gold certified. The centre is a member of the World Trade Centers Association (WTCA).[7] Tower A of the WTC complex is the tallest commercial establishment in the city.[8] The development is part of the larger expansion of the Old Mahabalipuram Road (OMR) corridor as a major IT and commercial hub in Chennai.[9]

StatusCompleted
TypeOffice
LocationPerungudi, Chennai, India, 110 Old Mahabalipuram Road, Perungudi, Chennai 600096
Coordinates12°57′42″N 80°14′43″E
Quick facts General information, Status ...
World Trade Center Chennai
Towers A (front) and B (back) of World Trade Centre, Chennai in March 2020
Interactive map of the World Trade Center Chennai area
General information
StatusCompleted
TypeOffice
LocationPerungudi, Chennai, India, 110 Old Mahabalipuram Road, Perungudi, Chennai 600096
Coordinates12°57′42″N 80°14′43″E
Construction started2013
Completed2020
OwnerBrigade Group, GIC
Height
Antenna spire122 m (400 ft) (Tower 1)[1]
88 m (289 ft) (Tower 2)[2]
Roof106 m (348 ft) (Tower 1)[3]
81 m (266 ft) (Tower 2)[4]
Top floor27 (Tower A)
19 (Tower B)
Technical details
Floor count28 (Tower A)
20 (Tower B)
Floor area170,000 m2 (1,800,000 sq ft)
Tower 1: 110,000 m2 or 1,200,000 sq ft
Tower 2: 56,000 m2 or 600,000 sq ft
Design and construction
ArchitectsHOK, New York
DeveloperBrigade Group (India) and GIC (Singapore)
References
Tower 1[5]
Tower 2[6]
Close

History

In 2016, India's Brigade Group and Singapore's GIC, a sovereign wealth fund, jointly acquired a 6.5-hectare (16-acre) land parcel at Perungudi, purchased from Kansai Nerolac Paints for 5,378.6 million (equivalent to 7.7 billion or US$82 million in 2023). The land acquisition was facilitated by Perungudi Real Estates, a special purpose vehicle formed by Brigade Enterprises and GIC, with the help of real estate firm Jones Lang LaSalle (JLL). Construction of a world trade centre (WTC) and residential units, entailing an investment of more than 10 billion (equivalent to 14 billion or US$150 million in 2023) was planned on the land.[8][10] The foundation stone was laid on 9 June 2017. Initially expected to be operational by March 2020, the centre became functional officially in September 2021.[11] The project’s phased construction was aligned with Chennai’s growing commercial real estate requirements, with the WTC designed to serve both multinational tenants and emerging Indian technology firms.[12][13]

The complex

North Tower (Tower B) as in June 2024
South Tower (Tower A) as in June 2024

The complex consists of five towers, including two office towers, a hotel tower and two residential towers (the latter three are currently under construction). Built on a 6.1-hectare (15-acre) plot and developed as a Grade A++ commercial development, all the towers have three basements. The first office tower (Tower A) has 28 floors (ground and 27 floors) above the street, the second office tower (Tower B) 20 floors (ground and 19 floors), the third tower (hotel) 8 floors, and the fourth (restaurant) and the fifth (cafeteria and utility) towers 5 floors each. The total floor space of the construction would be 230,000 square metres (2,500,000 sq ft).[14] The 28-storied Tower A has a total floor space of 0.11 million square metres (1.2 million square feet), with a typical floor area of 4,600 square metres (50,000 sq ft). Tower B has a typical floor area of 4,100 square metres (44,000 sq ft). The complex has three levels of combined basement and includes development of more than 0.17 million square metres (1.8 million square feet) of premium office space spread across two towers. The campus includes landscaped open areas, multi-level parking, and centralized amenities, consistent with WTCA’s standards for mixed-use business districts.[15] Upon completion, Tower A will be the tallest commercial structure in Chennai. It consists of premium retail and hotel within the campus.[16] The complex has a frontage of 350 metres (1,150 ft) on the Old Mahabalipuram Road. Once fully operational, the WTC can house 20,000 to 25,000 employees.[8] 298-unit high-end residential apartments will also be constructed.[8] The apartment block consists of 27-storeyed (G+26) twin towers to be built on 2.0 hectares (5 acres) of land. Besides, there will be another tower with 80 Marriott Exclusive apartments. These towers are to be completed by October 2024. A public park has also been constructed along with a basketball court.

The development will be led by the WTCA. The WTC has become an important landmark of Chennai city.[17]

The total development potential of the complex is 0.24 million square metres (2.6 million square feet).[8]

Operations

Night view of WTC Tower B

The WTC officially become functional in September 2021 with its first occupant, Kissflow Inc., a software-as-a-service (SaaS) company, moving its 350 employees into its WTC office.[11][18] In March 2022, Amazon opened its office at the WTC, occupying 18 floors across 77,000 square metres (830,000 sq ft) to accommodate 6,000 employees.[19][20] In November 2023, Hapag-Lloyd Technology Center began its operations at the WTC.[21]

As of June 2024, the WTC is over 90% leased and houses marquee tenants.[22][23]