Wikiwand AI

Yelachenahalli metro station

Namma Metro's Green Line metro station From Wikipedia, the free encyclopedia

Yelachenahalli (formerly known as Puttenahalli) is an elevated metro station on the north–south corridor of the Green Line of Namma Metro located on Kanakapura Road between Yelechenahalli and Konanakunte suburbs in Bengaluru, India. It was opened to the public on 18 June 2017.[3]

OthernamesPuttenahalli
LocationKanakapura Road, Harsha Layout, Kumaraswamy Layout, Bengaluru, Karnataka 560078
Coordinates12.895983°N 77.570159°E / 12.895983; 77.570159
System
Namma Metro station
Quick facts General information, Other names ...
Yelachenahalli
General information
Other namesPuttenahalli
LocationKanakapura Road, Harsha Layout, Kumaraswamy Layout, Bengaluru, Karnataka 560078
Coordinates12.895983°N 77.570159°E / 12.895983; 77.570159
System
Namma Metro station
OwnerBangalore Metro Rail Corporation Ltd (BMRCL)
OperatorNamma Metro
LineGreen Line
PlatformsSide platform
Platform-1 → Peenya Industry / Madavara
Platform-2 → Silk Institute
(Operational to Peenya Industry during peak hours)
Tracks2
Construction
Structure type
Elevated, Double track
Platform levels
2
ParkingPaid parking[1][2]
AccessibleYes Disabled access
ArchitectJMC Projects
Other information
StatusStaffed
Station codePUTH
History
Opened18 June 2017; 9 years ago (2017-06-18)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jaya Prakash Nagar
towards Madavara
Green Line Konanakunte Cross
Location
Close

Next to the Yelachenahalli Metro station, stands the electrical switch yard for the metro line. This area was earlier occupied by Shravanthi Kalyana Mantapa. The land was acquired by Namma Metro to build the Yelachenahalli Metro Station. The station also serves the residents of Reserve Bank Layout, Kumaraswamy Layout and adjoining areas.

History

This station was constructed by JMC Projects, part of Reach 4A of Phase 1. The station being closer to Yelachenahalli than Puttenahalli, was renamed to Yelachenahalli metro station in July 2016.[4] This change came after public pressure, which resulted in an expert committee reviewing the issue and concluding the name-change would be appropriate.

The station was the southern terminus of the Green Line until January 2021, when the section Reach 4B of Phase 2 completed construction.[5] This extended the line to the Silk Institute metro station.

Station layout

Yelachenahalli track layout
P1
P2
Station with two tracks and two side platforms
** Approved
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Konanakunte Cross
Platform 1
Northbound
Towards ← Peenya Industry / Nagasandra / Madavara
Next Station: Jaya Prakash Nagar
Change at the next station for Orange Line **
Side platform | Doors will open on the left Disabled access
L2 Note: (Towards Peenya Industry/Nagasandra - Operational during peak hours)

Entry/Exits

There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Kanakapura Road side
  • Entry/Exit point B: Towards Kanakapura Road side (Konanakunte Cross)
  • Entry/Exit point C: Towards Jyothi Kendriya Vidyalaya side

See also

References

Related Articles

Timelines

Top Qs

Fact Checks