Darlington railway station

Railway station in County Durham, England From Wikipedia, the free encyclopedia

Darlington railway station serves the town of Darlington, in County Durham, England. It is a principal stop on the East Coast Main Line, 232 miles 50 chains (232.63 miles; 374.37 kilometres) north of London King's Cross; it lies between Northallerton to the south and Durham to the north. It is also the interchange for services to Bishop Auckland, Middlesbrough and Saltburn. The station is managed by London North Eastern Railway, which operates services along with CrossCountry, Northern Trains and TransPennine Express.

LocationDarlington, County Durham,
England
Coordinates54°31′15″N 1°32′48″W
Owned byNetwork Rail
Quick facts General information, Location ...
Darlington
National Rail
Station concourse and platforms (2021)
General information
LocationDarlington, County Durham,
England
Coordinates54°31′15″N 1°32′48″W
Grid referenceNZ294140
Owned byNetwork Rail
Managed byLondon North Eastern Railway
Platforms6
Other information
Station codeDAR
ClassificationDfT category B
History
Original companyGreat North of England Railway
Pre-groupingNorth Eastern Railway
Post-grouping
Key dates
31 March 1841Opened as Darlington
1 October 1868Renamed Darlington Bank Top
1 July 1887Resited
1 September 1934Renamed Darlington
17 May 2026Platforms 5 and 6 opened
Passengers
2020/21Decrease 0.538 million
 Interchange Decrease 86,795
2021/22Increase 2.075 million
 Interchange Increase 0.361 million
2022/23Increase 2.220 million
 Interchange Increase 0.472 million
2023/24Increase 2.350 million
 Interchange Increase 0.486 million
2024/25Increase 2.827 million
 Interchange Increase 0.613 million
Listed Building – Grade II*
FeatureOriginal North Eastern Railway station building
Designated6 September 1977
Reference no.1310079[1]
Location
Notes
Passenger statistics from the Office of Rail and Road
Close

Darlington is the location of the first commercial steam railway, the Stockton and Darlington Railway. The station building is a Grade II* listed[1] Victorian structure and winner of the Large Station of the Year award in 2005.[2] The station was enlarged with two new platforms opening beside the freight by-pass lines in May 2026.

History

60129 Guy Mannering entering the station, 1961

The first railway to pass through the area now occupied by the station was built by the Stockton and Darlington Railway (S&D), which opened its mineral branch from Albert Hill Junction on the main line to Croft-on-Tees on 27 October 1829. A decade later, that branch line was purchased by the Great North of England Railway to incorporate into its new main line from York, which reached the town on 30 March 1841.

A separate company, the Newcastle & Darlington Junction Railway continued the new main line northwards towards Ferryhill and Newcastle, opening its route three years later on 19 June 1844.[3] It crossed the S&D at Parkgate Junction by means of a flat crossing which, in future years, became something of an operational headache for the North Eastern Railway (NER) and London and North Eastern Railway.

The original Bank Top station, where the two routes met, was a modest affair. It was rebuilt in 1860 to accommodate the expanding levels of traffic on the main line. By the mid-1880s, even that replacement structure was deemed inadequate and the NER embarked on a major upgrade to facilities in the area. This included an ornate new station with an impressive three-span overall roof on the Bank Top site, new sidings and goods lines alongside it; there was also a new connecting line from the south end of the station, at Polam Junction, to meet the original S&D line towards Middlesbrough at Oak Tree Junction near Dinsdale. Those improvements were completed on 1 July 1887 and the old route west of Oak Tree was closed to passengers, although it remained in use for freight until 1967.

The new station, with its broad island platform, was designed by T.E. Harrison, chief engineer, and William Bell, the architect of the NER.[4] It cost £81,000 (equivalent to £9,210,000 in 2025)[5] to construct.[6] It soon became a busy interchange on the main East Coast route, thanks to its rail links to Richmond (opened in 1846), Barnard Castle and Penrith (1862/5), and the Tees Valley Line to Bishop Auckland (1842) and Saltburn (1861).

A down freight passing the station (1961)

The lines to Penrith (closed in 1962), Barnard Castle (1964)[7] and Richmond (1969) have now gone; the bays at the northern end of the station are now used for car parking. The main line, which was electrified in 1991, remains busy, as does the Tees Valley route. It is still possible to travel to Scotch Corner and Richmond by means of the Arriva North East-operated X26 and X27 buses.[8] The same company also operated the Sky Express bus service to Durham Tees Valley Airport from the station, but that was withdrawn in January 2009 due to declining demand.[9]

HS2 trains were originally planned to stop at Darlington as part of the eastern leg, but Phase 2b was cancelled as part of the Integrated Rail Plan; the whole second phase of HS2 was cancelled in 2023.[10]

On 28 September 2025, a replica of Locomotion No. 1 visited the station as part of Railway 200.[11]

Tees Valley Metro

A transit diagram, showcasing all discussed or mentioned ideas for the Tees Valley Metro

Starting in 2006, Darlington was mentioned within the Tees Valley Metro scheme. This was a plan to upgrade the Tees Valley line, and sections of the Esk Valley line and Durham Coast Line, to provide a faster and more frequent service across the North East of England. In the initial phases, the services would have been heavy rail mostly along existing alignments, with new additional infrastructure and rolling stock. The later phase would have introduced tram-trains, to allow street running and further heavy rail extensions;[12][13][14] there were suggestions to have the metro extended west to Bishop Auckland from Darlington.[15]

Darlington was a major part of the scheme and so had some of the largest proposed improvements. To reduce the need for local services to cross the East Coast Main Line (ECML), two new eastern platforms would have been created.[16] The new platforms would be connected to the main building by a new footbridge and lifts; the existing car parking places that would have been lost with the new platforms would be replaced at a similar distance from the station. A new entrance, including pick-up/drop-off facilities, was considered on the eastern side.[12] Furthermore, release of track capacity on the ECML to allow more trains to run from Darlington to York and Newcastle, with an improved service to Saltburn;[a] new rolling stock was also proposed.[12] While unclear and never having concrete plans, street-running trams to Darlington town centre were also proposed in a future phase of the Metro.[15]

However, due to the 2008 financial crisis and a change in government in 2010, the project was ultimately shelved.[17] Several stations were eventually improved, with a possibility of improved rolling stock and services in the future.[18]

Station upgrade

As part of a £140 million investment, the station has been redeveloped to increase the reliability, connectivity and accessibility of the station;[19] the plan resurrects many features of the abandoned Tees Valley Metro. The project includes the construction of a new concourse, multi-storey car park and two new platforms on the current freight avoiding lines.[20][21] The Tees Valley Combined Authority contributed £43 million towards the upgrade, with the other £96 million being supplied by Network Rail and the Department for Transport. Other key stakeholders in the project include LNER, which manages the station, and Darlington Borough Council.[22][23]

The upgrade included the construction of a new eastern concourse, two new platforms, the remodelling of the track layout and a new bridge over the railway on Smithfield Road.[19] The upgrade also includes work to the overhead line equipment and installation of new points and cabling.[24] The project was scheduled to finish in 2025 as part of the Railway 200 celebrations,[22] but this was delayed because of the complex design of the footbridge.[25]

The East Coast Main Line was closed over six weekends in early 2025 in order to facilitate this work; many other smaller projects made use of the closure, including track work at Chester-le-Street and the Allerdene bridge near Newcastle was demolished.[24] A 50-tonne footbridge was installed during these closures in February 2025, to connect the existing building with the two new platforms.[26]

The upgrade was completed in May 2026. The redeveloped station was opened officially by rail minister Lord Hendy and Tees Valley Combined Authority mayor Ben Houchen on 15 May, with the new platforms receiving their first trains two days later.[25]

Accidents and incidents

  • On 16 November 1910, an express freight train overran signals and was involved in a rear-end collision with another freight train.[27]
  • On 27 June 1928, a parcels train and an excursion train were involved in a head-on collision. 25 people were killed and 45 were injured.[28]
  • On 11 December 1968, a Newcastle to Kings Cross express train was derailed at the south end of the station after passing a signal at danger. No-one was hurt.[29]
  • On 16 February 1977, an express passenger train hauled by Class 55 Deltic locomotive no. 55008 collided with an empty stock train after failing to stop at Darlington. The guard of the express was slightly injured. The cause of the accident was that the brakes on the carriages had become isolated whilst the train was moving in a freak event. The train had struck an object on the track, which had caused a traction motor cover to come lose. This struck the handle of the brake isolating cock, closing it and thus separating the brakes between the locomotive and train. Following the collision, the train was diverted onto the Tees Valley line, where it was brought to a halt by the operation of the communication cord in one of the carriages.[30]
  • On 3 October 2009, a Class 142 Pacer unit, operated by Northern Rail, hit the rear end of a departing National Express East Coast service. Three passengers from the Northern Rail train were taken to hospital with minor injuries.[31]

Facilities

The station's clock tower

The station is fully staffed and the ticket office is open throughout the week.[b] There is a waiting room and a first class lounge on the platform.[c] Self-service ticket machines are also provided for use.[23]

Train running information is offered via digital passenger information system displays, announcements and timetable posters. Step-free access to all platforms is via ramps from the subway, linking the platforms with the main entrance and car park.[23]

Several retail outlets are located in the main buildings, including a coffee shop, grocer and newsagent. Vending machines, toilets, a photo booth, payphone and cash machines are also provided.[32]

Platform layout

A view of platforms 1 and 2

Darlington station has six main platforms; 1-4 under the train shed and 5-6 sited by the freight by-pass lines, connected via a footbridge:[32]

  1. for some northbound and southbound London North Eastern Railway (LNER) and CrossCountry (XC) services; also some southbound TransPennine Express (TPE) services
  2. a south-facing bay used by some Northern Trains (NT) services terminating here from Saltburn; some TPE trains on diesel power terminate here when there are delays, to allow them to run subsequent southbound services back on time
  3. as platform 2, although used less frequently
  4. is a northbound platform for LNER, XC and TPE services, plus NT services to Bishop Auckland. Platform 4a is an southern extension of 4, for trains waiting at Darlington to be bypassed by those stopping at platform 4; TPE also uses 4a occasionally if services using Class 802 units on electric power have to terminate early when there are delays, to allow them to run subsequent southbound services back on time[d]
  5. a new platform, which is used for most southbound LNER, XC and TPE services
  6. the other new platform, which is used for most NT services to and from Saltburn.

Services

Darlington is served by four train operating companies, which provide the following general off-peak service pattern in trains per hour/day (tph/tpd):

London North Eastern Railway:[33]

CrossCountry:[34]

TransPennine Express:[35]

Northern Trains:[36]


London North Eastern Railway
Inverness
Carrbridge
Aviemore
Kingussie
Newtonmore
Blair Atholl
Pitlochry
Dunkeld & Birnam
Perth
Gleneagles
Dunblane
Stirling
Falkirk Grahamston
Aberdeen
Stonehaven
Montrose
Arbroath
Dundee
Leuchars
Kirkcaldy
Inverkeithing
Haymarket Edinburgh Trams
Edinburgh Waverley Edinburgh Trams
Dunbar
Reston
Berwick-upon-Tweed
Alnmouth
Morpeth
Newcastle Tyne and Wear Metro
Durham
Darlington
Northallerton
Middlesbrough
Thornaby
Skipton
Keighley
Bradford Forster Square
York
Shipley
Harrogate
Horsforth
Hull Paragon
Brough
Selby
Leeds
Wakefield Westgate
Doncaster
Retford
Lincoln
Newark Northgate
Grantham
Peterborough
Stevenage
London King's Cross London Underground
More information Northern TrainsDurham Coast Line, Newcastle – Middlesbroughvia Hartlepool ...
Close
More information Northern TrainsTees Valley Line, Bishop Auckland – Saltburnvia Darlington & Middlesbrough ...
Close
More information Preceding station, National Rail ...
Preceding station National Rail National Rail Following station
CrossCountry
TransPennine Express
North TransPennine
Northallerton   London North Eastern Railway
East Coast Main Line
  Durham
York   London North Eastern Railway
London-Newcastle/Edinburgh/Scotland express or
Leeds-Aberdeen
  Newcastle
Northern
  Future services  
York   TBA
Northern Powerhouse Rail
  Newcastle
  Historical railways  
Croft Spa
Line open, station closed
  North Eastern Railway
York, Newcastle and Berwick Railway
  Aycliffe
Line open, station closed
Close

Notes

  1. From one/two to four trains per hour.
  2. Opening hours are 06:00–20:00/21:00 weekdays, 06:30–19:45 Saturdays, 07:45–20:00 Sundays.
  3. The lounge is open between 06:00 and 20:00 each day; on Sundays, it opens at 08:00.
  4. This is because the lines at platforms 2 and 3 are not electrified.

References

Related Articles

Wikiwand AI