Wikiwand AI

Interstate 75 in Georgia

Highway in Georgia From Wikipedia, the free encyclopedia

Interstate 75 (I-75) in the US state of Georgia travels north–south along the U.S. Route 41 (US 41) corridor in the central part of the state, traveling through the cities of Valdosta, Macon, and Atlanta. It is also designated—but not signed—as State Route 401 (SR 401).

Length355.11 mi[1] (571.49 km)
ExistedAugust 14, 1957[2]–present
NHSEntire route
Southend I-75 at the Florida state line near Lake Park
Quick facts Route information, Length ...
Interstate 75 marker
Interstate 75
I-75 highlighted in red
Route information
Maintained by GDOT
Length355.11 mi[1] (571.49 km)
ExistedAugust 14, 1957[2]–present
NHSEntire route
Major junctions
South end I-75 at the Florida state line near Lake Park
Major intersections
North end I-75 at the Tennessee state line in East Ridge, TN
Location
CountryUnited States
StateGeorgia
CountiesLowndes, Cook, Tift, Turner, Crisp, Dooly, Houston, Peach, Crawford, Bibb, Monroe, Lamar, Butts, Spalding, Henry, Clayton, Fulton, Cobb, Cherokee, Bartow, Gordon, Whitfield, Catoosa
Highway system
  • Georgia State Highway System
← SR 74→ SR 75
← SR 400SR 401→ SR 402
Close

I-75 is the only Interstate to traverse the full length of the state from north to south, from the flat Atlantic Coastal Plains in southeast Georgia to the rolling mountains of North Georgia. In Downtown Atlanta, I-75 runs concurrently with I-85 as the Downtown Connector. The segment from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.

What would become the general routing of I-75 in Georgia was initially used by the western routing of the Dixie Highway beginning in 1916. Established in 1926, the Interstate's direct predecessor in Georgia is US 41, a national highway that has been largely supplanted in favor of the federally-funded freeway built under the Interstate Highway System—though limited-access elements of the Interstate existed as early as 1951. The last section of I-75, located in Georgia, opened in 1977.

Route description

With a length of 355.1 miles (571.5 km), I-75 is the longest Interstate Highway in Georgia.[1] It enters the state near Valdosta, and it continues northward through the towns of Tifton and Cordele until it reaches the Macon area, where it intersects with I-16 eastbound toward Savannah. For northbound traffic, I-475 provides a relatively straight bypass west of that city and I-75's route.

I-75 cosigned with I-85 in Downtown Atlanta

After Macon, I-75 passes the small town of Forsyth. The freeway reaches no major junctions again until in the Atlanta metropolitan area. The first metropolitan freeway met is I-675, then followed by the Atlanta "Perimeter" bypass, I-285. It crosses inside the Perimeter and heads north several miles toward the Atlanta city center. I-75 then runs concurrently with I-85 due north over the Downtown Connector through the central business district of Atlanta. The two Interstates intersect I-20 in downtown. Several miles north of the I-20 interchange, the two Interstates split, I-75 heads in a general northwest direction while I-85 heads northeast, crossing outside the I-285 Perimeter and heading toward the major suburban city of Marietta. This section of I-75 just north of I-285 has 16 through lanes, making it the widest roadway anywhere in the Interstate Highway System.[3] North of Marietta, the final major junction in the Atlanta metropolitan area is the I-575 spur. I-75 then traverses the hilly North Georgia terrain as it travels toward Chattanooga, Tennessee.

The 190-mile-long (310 km) section of I-75 from the northern I-475 intersection to the US 11/US 64 intersection in Ooltewah, Tennessee, is one of the longest continuous multi-state six-lane freeways in the US (some segments along this corridor have as many as 16 lanes).[citation needed]

Due to recent lane widening in southern Georgia completed in 2011,[4] the only four-lane section of I-75 in Georgia is bypassed by six-lane I-475; along this route, there are at least six lanes from the Alligator Alley portion of I-75 in Naples, Florida, to a portion of I-75 in Ooltewah (except a four-lane overpass on I-475 over a railroad track in Macon).

I-75 is the only Interstate to traverse the full length of the state from north to south. The entire length of I-75 in Georgia is part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense.[5][6][7][8][9][10][11]

Services

The Georgia Department of Transportation operates two welcome centers at both ends of Interstate 75 and nine rest areas, the most of any interstate highway within the state. The northbound welcome center is located between exits 2 and 5 [12] The southbound welcome center is located between exits 353 and 350.[13] The other rest areas include two in Cook County, two in Turner County, two in Dooly County, one southbound rest area in Monroe County, and two in Gordon County.[14]

History

Macon, Georgia 1955 Yellow Book with I-75 route

Early national highways

The general routing of I-75 within Georgia was originally developed as the western routing of the Dixie Highway. The western route of the Dixie Highway as designated in 1916, followed present-day US 41 south from the Tennessee border through Atlanta and Macon south to Echeconnee, Georgia. The section that would become US 41, I-75's direct predecessor, from Echeconnee south through Perry and Valdosta to the border with Florida was paved beginning in 1919 and was later designated as a part of the Dixie Highway in 1924. In 1926, the western route of the Dixie Highway following the newer Perry and Valdosta route was officially designated as US 41. By October 1929, the majority of US 41 was paved in Georgia, the only sections that were not paved at that point were between Fort Oglethorpe and Ringgold, and another on the south side of Calhoun.[15]

1950s

The first section of the highway that would eventually become I-75 in Georgia were portions of the Downtown Connector that were integrated into the Interstate Highway System.[16][17] The first section, located between Williams Street and the Brookwood Interchange, began construction in September 1948 and opened on September 25, 1951.[18] By late 1953, this expressway was signed as US 19/US 41 as far north as Lakewood Avenue. It was also under construction to Howell Mill Road, and proposed from this road to the northwest part of Atlanta.[17][19] By mid-1954, the expressway was signed as SR 295 from Lakewood Avenue to University Avenue. It was under construction from the Downtown Connector to US 41/SR 3E, just north of West Paces Ferry Road.[19][20] By mid-1955, the highway was under construction from University Avenue to Glenn Street. It was open from Williams Street to US 41/SR 3E in the central part of Atlanta.[20][21] A 1.4-mile (2.3 km) section between University Avenue and Richardson Street began in March 1955 and was dedicated and opened on July 25, 1957.[22][23] The 0.6 mi-long (0.97 km) stretch from Piedmont Avenue to Williams Street opened on May 5, 1959.[24] On October 9, 1959, a 37-mile (60 km) section in Turner and Tift Counties was dedicated and opened to traffic by Governor Ernest Vandiver. At the ceremony, Vandiver also unveiled the first Interstate Highway shield used in Georgia.[25][26]

1960s

On September 21, 1962, two separate sections totalling 51 miles (82 km)– from US 84/221 in Valdosta to Ashburn, and from Hahira to Unadilla–opened to traffic.[27][28] On July 15, 1963, the 26-mile (42 km) section between Florida State Road 6 near Jasper, Florida, and US 84/US 221 was jointly opened to traffic in a dedication ceremony at the state line by Georgia Governor Carl Sanders and Florida Governor C. Farris Bryant.[29][30] This completed I-75 from the state line to US 41/SR 7 in Unadilla. On May 27, 1964, the 14-mile (23 km) section between Unadilla and Perry opened to traffic.[31] The final stretch of the Downtown Connector, 2.3 miles (3.7 km) between Richardson Street and Piedmont Avenue, including the interchange with I-20,[32] opened on September 18, 1964.[33][34] On December 8, 1964, the state announced the opening of the 16-mile (26 km) section between SR 53 in Calhoun and US 41 south of Dalton.[35] The 19-mile (31 km) section between US 41/76 in Dalton and the Tennessee state line was announced to have been opened two days later.[36] In 1966, the highway was open from the Florida state line to its southern interchange with I-475 near Macon. It was open from I-16 to US 23/SR 42 near Forsyth. It was open from Forest Park to its northern interchange with I-285.[37] The 6.3-mile (10.1 km) section between SR 140 in Adairsville and SR 53 in Calhoun opened on December 7, 1966.[38][39] The five-mile (8.0 km) section between I-285 and SR 120 in Marietta opened in January 1967.[40][41] On March 6, 1967, the short stretch in Macon between I-16 and SR 247 (Pierce Avenue), along with a short stretch of I-16 extending to Main Street, was dedicated and opened to traffic.[42] The 13.5-mile (21.7 km) section from SR 247 in Macon and Bolingbroke was completed in late April 1967.[43] The 1.8-mile (2.9 km) segment in Marietta between SR 120 and Allgood Road was completed and opened on August 14, 1968.[44] The section between US 23/SR 42 near Forsyth and SR 20 in McDonough opened on November 18, 1968.[45] The section from SR 20 in McDonough to SR 54 in Morrow opened on October 15, 1969, completing I-75 between Macon and Atlanta.[46] It was under construction from US 411/SR 61 near Cartersville to SR 140 in Adairsville.[47] In 1969, the highway was under construction from its southern interchange with I-475 to I-16 in Macon. It was open from I-16 to Allgood Road in Marietta.[47][48]

1970s

A section of I-75 in Cartersville.

The southbound lanes of the 12-mile (19 km) stretch between US 411 in Cartersville and SR 140 in Adairsville opened on September 1, 1971.[49] The remainder of this stretch was opened to traffic and dedicated by Governor Jimmy Carter and state highway director Bert Lance on September 30, 1971.[50] Construction on the six-mile (9.7 km) section between the southern interchange with I-475 and US 80/SR 22 in Macon began on May 7, 1969, and was dedicated and opened to traffic on November 24, 1971.[51][52] In 1971, it was open from the Florida state line to Allgood Road in Marietta.[53][54] In 1973, it was under construction from Marietta to SR 92 in Acworth.[55][56] The five-mile (8.0 km) section between Allgood Road and Barrett Parkway (then Roberts Road) in Marietta opened on November 27, 1974, eliminating one of the worst bottlenecks on US 41.[57][58] That year, the highway was under construction from Emerson to US 411/SR 61 near Cartersville.[56][59] The last segment of I-75 in Georgia, located between Barrett Parkway in Marietta and US 411 in Cartersville, was dedicated and opened on December 21, 1977.[60][61]

Since completion

Much of the work to widen interstates across Atlanta including I-75 from six to eight lanes and the Downtown Connector to 10 lanes including the elimination of sharp curves and grades, left-hand exits, excessive interchanges, and short acceleration/deceleration lanes, took place in the 1980s. Construction began with widening I-285 first, beginning in 1976, continued to the radiating expressways, and concluded with the depressed sections of the Downtown Connector which were completed in 1988. I-75 widening from I-285 and Aviation Boulevard to the Downtown Connector was completed by late 1984. I-75 widening from the Brookwood Interchange to the Chattahoochee River and Cobb County line was widened in the early 1980s and completed by 1985. Work on the Downtown Connector portion began in 1984, and included redesigning the massive interchange between I-20 and I-75/I-85 and the design and construction of 55 bridges over the connector portion alone.[62] The project was completed in November 1988.

View of southbound I-75 at Jonesboro Road. Overhead signs are visible along the South Metro Express Lanes located in the freeway's median.

In addition to the general-purpose lanes added in the 1980s, provisions for high-occupancy vehicle lanes (HOV lanes) and dedicated onramps at Williams Street, Piedmont Avenue, and Memorial Drive were built and were subsequently converted to HOV usage in 1996 on the Downtown Connector. In 1996, HOV lanes were also added from I-285 on the south side of Atlanta to I-285 on the north side of Atlanta.[citation needed]

In 1998, the portion of I-75 that from the Chattahoochee River north to the Tennessee state line was named the Larry McDonald Memorial Highway.[63] Larry McDonald, a conservative Democratic representative to Congress, was aboard Korean Air Lines Flight 007 when it was shot down by the Soviet Union on September 1, 1983. He was the only sitting Congressperson to be reportedly killed by the Soviets during the Cold War.[citation needed] I-75 was also designated as the Horace E. Tate Freeway between I-85 to I-285 northwest of Downtown Atlanta, in honor of Horace Tate, who was a state senator in 1974.[when?][citation needed]

Until 2000, the state of Georgia used the sequential interchange numbering system on all of its Interstate Highways. The first exit on each highway would begin with the number "1" and increase numerically with each exit. In 2000, the Georgia Department of Transportation (GDOT) switched to a mileage-based exit system, in which the exit number corresponded to the nearest milepost.[64][65]

In March 2007, I-75's HOV ramp serving Northside Drive in Atlanta was the site of the Bluffton University bus crash where 7 out 35 people on board the bus were killed.[66]

The highway had a lane widening project completed in 2011, allowing the entirety of the Interstate in Georgia to be three lanes in each direction.[4] On January 28, 2017, the new Peach Pass-only South Metro Express Lanes from SR 155 to SR 138 and I-675, opened.[67] On September 8, 2018, new Northwest Corridor Express Lanes from the I-285/I-75 interchange to Hickory Grove Road and from I-75/I-575 interchange to Sixes Road have opened, the lanes require a Peach Pass to use.[68]

Future

The I-75/I-16 interchange is being revamped with extra ramps to and from US 23/US 129/SR 49.[69] GDOT estimates that the final portion of the project will be bid on in 2023.

The segment of I-75 from SR 49 in Byron to I-16 in Macon is part of the Fall Line Freeway and may be incorporated into the eastern extension of I-14, which is currently entirely within Central Texas and is proposed to be extended to Augusta.[70]

Exit list

Note: exit numbers along Georgia Interstates were renumbered in 1999 and 2000 to be mileage based instead of being sequential.[64][71]

More information County, Location ...
CountyLocationmi[72]kmOld exit[73]New exitDestinationsNotes
Florida state line0.000.00
I-75 south (SR 93) – Lake City
Continuation into Florida
Lowndes​1.532.4612Bellville Fla, Lake ParkBelleville Road
Lake Park4.777.6825 SR 376 (Lakes Boulevard) – Lake Park
​10.5817.03311 SR 31 – Valdosta, Clyattville, Madison Fla
​12.8320.6513Old Clyattville Road – Valdosta
Valdosta15.9125.60416 US 84 / US 221 (I-75 BL north / SR 38) – Valdosta, QuitmanSouthern terminus of unsigned I-75 BL
17.9428.87518 SR 133 – Valdosta, Moultrie
​21.7134.94622 US 41 (North Valdosta Road / I-75 BL south / SR 7 south)Southern end of US 41/SR 7 concurrency; northern terminus of unsigned I-75 BL
Hahira28.7346.24729
US 41 north (SR 7 north) / SR 122 – Hahira, Barney, Lakeland
Northern end of US 41/SR 7 concurrency
CookCecil32.3952.13832Old Coffee Road – Cecil
Adel37.5260.38937Adel
39.2663.181039 SR 37 – Adel, Moultrie, Nashville
Sparks41.4266.661141Rountree Bridge Road – Sparks
​44.8872.231245Barneyville Road
Lenox48.6678.311349Kinard Bridge Road – Lenox
Tift​54.9688.451455Eldorado, Omega
​59.0495.021559Southwell Boulevard / I-75 BL north – TiftonSouthern terminus of unsigned I-75 BL
​60.3097.041660South Central Avenue
Phillipsburg–Tifton line61.2698.591761



Omega Road (SR 35 Loop west) to US 319 south / SR 35 south
Eastern terminus of SR 35 Loop
Tifton61.8999.601862

US 82 / SR 520 to US 319 north (SR 35 north) – Tifton, Sylvester
62.44100.491963A2nd Street
62.82101.102063B8th Street
64.06103.092164 US 41 (I-75 BL south / SR 7) – TiftonNorthern terminus of unsigned I-75 BL
​66.02106.252266Brighton Road
​69.28111.502369Chula Brookfield Road
​70.89114.092471Willis Still Road – Sunsweet
Turner​75.17120.972575Inaha Road
​78.45126.252678 SR 32 – Sycamore, Ocilla
​79.71128.282780Bussey Road – Sycamore
Ashburn82.07132.082882 SR 107 / SR 112 – Ashburn, Fitzgerald
​83.95135.102984 SR 159 – Ashburn, Amboy
CrispArabi91.86147.833092Arabi
​96.97156.063197 SR 33 Conn. – Wenona, Sylvester
Cordele98.98159.293299 SR 300 (Georgia–Florida Parkway) – Albany
100.75162.1433101 US 280 / SR 30 / SR 90 (16th Avenue East / I-75 BL north) – Cordele, AbbevilleSouthern terminus of unsigned I-75 BL
101.80163.8334102 SR 257 (8th Avenue East) – Cordele, Hawkinsville
​103.86167.1535104Farmers Market Road / I-75 BL southNorthern terminus of unsigned I-75 BL
Dooly​109.54176.2936109 SR 215 (East Union Street) – Vienna, Pitts
​112.07180.3637112 SR 27 – Vienna, Hawkinsville
​116.88188.1038117Pinehurst
Unadilla120.81194.4239121 US 41 / SR 7 – Unadilla
121.79196.0040122 SR 230 – Unadilla, Byromville
Houston​127.17204.6641127 SR 26 – Montezuma, Hawkinsville
Perry133.80215.33—134South Perry Parkway
134.86217.0442135 US 41 (SR 7) / SR 127 / SR 224 (Larry Walker Highway) – Perry
136.69219.9843136 SR 7 – Perry, Fort Valley
138.20222.41—138 US 341 / SR 11 Conn. (Perry Parkway)
Peach​141.86228.3044142 SR 96 (Housers Mill Road)
​144.66232.81—144Richard B. Russell Parkway
​146.44235.6745146 SR 247 Conn. – Centerville, Warner Robins
Byron149.69240.9046149 SR 49 (SR 540 west / Fall Line Freeway) – Byron, Fort Valley, ColumbusSouthern end of SR 540 concurrency
Crawford
No major junctions
BibbMacon153.75247.44—153Sardis Church Road
155.80250.7447155Hartley Bridge RoadCollector-distributor lanes on southbound exit and northbound entrance
156.81–
156.89
252.36–
252.49
48156
I-475 north (SR 408) – Atlanta
Northbound exit and southbound entrance; southern terminus of I-475
160.07257.6149160A US 41 / SR 247 (Pio Nono Avenue)Signed as exit 160 northbound
160.26257.9149A160BRocky Creek RoadNorthbound exit is via exit 160.
162.02260.7550162 US 80 / SR 22 (Eisenhower Parkway)
162.84262.0751163
SR 74 west (Mercer University Drive) / Little Richard Penniman Boulevard (Macon Mall)
Eastern terminus of SR 74
163.98–
164.08
263.90–
264.06
52164 US 41 Bus. / SR 19 (Forsyth Street) / Hardman Avenue – Downtown Macon
165.28265.9953165

I-16 east (SR 404) / SR 540 east (Fall Line Freeway) – Downtown Macon, Savannah
Northern end of SR 540 concurrency; western terminus of I-16, exit 0; Major Bobby Jones MD POW-MIA Interchange
167.02268.7954167 SR 247 (Pierce Avenue)
169.47272.7455A169
To US 23 / Arkwright Road / Riverside Drive
171.19275.5055171 US 23 / SR 87 / Riverside Drive
172.64277.8456172Bass Road
Monroe​175.78282.8957175Pate Road – BolingbrokeNorthbound exit and southbound entrance; former SR 19 Spur
​177.96286.4058177
I-475 south (SR 408) – Valdosta
Southbound exit and northbound entrance; northern terminus of I-475
​180.97291.2459181Rumble Road – Smarr
​185.53298.5860185 SR 18 – Forsyth, Gray
Forsyth186.38299.9561186Tift College Drive
187.45301.6762187 SR 83 – Forsyth, Monticello
188.52303.3963188 SR 42 – Forsyth
​193.75311.8164193Johnstonville Road
​198.18318.9465198High Falls RoadAccess to High Falls State Park
Lamar
No major junctions
Butts​201.31323.9866201 SR 36 – Jackson, Barnesville
​205.58330.8567205 SR 16 – Griffin, Jackson
Spalding
No major junctions
HenryLocust Grove212.19341.4968212Bill Gardner Parkway – Jenkinsburg, Locust Grove, Hampton, Jackson
​214.08344.53—214Bethlehem Road to US 23, Locust GroveConstruction on new exit planned to begin in 2024[74]
​216.77348.8669216 SR 155 – McDonough
​216.00347.62—— I-75 South Metro Express LanesSouth end of South Metro I-75 Express lanes
​218.38351.4570218 SR 20 / SR 81 – McDonough, Hampton
​219.00352.45—— I-75 South Metro Express LanesNorthbound exit and southbound entrance
​221.35356.2371221Jonesboro Road – LovejoyFormer SR 920
​222.76358.5072222Jodeco Road – FlippenFormer SR 351
​224.62361.4973224Hudson Bridge Road / Eagles Landing Parkway
​228.07367.0474227

I-675 north (SR 413) to I-285 – Augusta, Greenville
Northbound exit and southbound entrance; southern terminus of I-675
Stockbridge228.00366.93—— I-75 South Metro Express LanesNorth end of South Metro I-75 Express lanes
​228.61367.9175228 SR 138 – Jonesboro, Stockbridge
Clayton​231.33372.29—231Mount Zion Boulevard
Morrow232.81374.6776233 SR 54 – Morrow, Lake City
​235.04–
235.15
378.26–
378.44
77235 US 19 / US 41 / SR 3 (Old Dixie Highway) – Griffin, Jonesboro
​237.61382.4078237 SR 331 – Forest Park
​238.00383.0279 SR 85 (Frontage Road) – RiverdaleNorthbound exit only
​238.25383.4380237A
SR 85 south – Riverdale
Southbound exit only
​238.69384.1381A238A
I-285 east (Atlanta Bypass / SR 407) – Augusta, Greenville
I-285 exit 58
​81B238B
I-285 west (Atlanta Bypass / SR 407) – Birmingham, Chattanooga, Domestic Terminals, Columbus, Montgomery
FultonHapeville239.23–
240.10
385.00–
386.40
82, 84, and 85239 US 19 / US 41 (Central Avenue / SR 3) / C.W. Grant Parkway / Porsche Avenue – International TerminalAdditional ramps for direct HOV lane access to/from C.W. Grant Parkway; Exit 82 (northbound) and 84 (southbound) were to C.W. Grant Parkway formerly Aviation Boulevard and Exit 85 was to US 41. Today, they are all marked as exit 239.
239.00384.6383—Frontage Road to Mountain View
Atlanta242.09389.6186241Cleveland Avenue
242.65390.5187242
I-85 south (SR 403) – Domestic Terminals, Columbus, Montgomery
Southbound exit and northbound entrance; southern end of I-85/SR 295 concurrency; southern terminus of SR 295
243.27391.5188243 SR 166 (Langford Parkway) – East Point
245.13394.5089244University Avenue / Pryor Street
246.18396.1990245Abernathy Boulevard / Capitol Avenue – Center Parc StadiumNorthbound exit and southbound entrance
246.00395.9090A—Georgia Avenue East – Stadium, Grant Park, Zoo AtlantaExits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue.
246.00395.9090B—Georgia Avenue West – West EndExits 90 A and B were northbound only and replaced in the 1980s by a single exit 90 (currently exit 245) which was moved several blocks south and not given direct access to Georgia Avenue.
246.53396.7591246Fulton Street / Central Avenue – Downtown Atlanta
246.77397.1492 A & B247 I-20 (Ralph D. Abernathy Freeway / SR 402) – Augusta, BirminghamI-20 exit 57
247.15397.7593248AMartin Luther King Jr. Drive – State CapitolSouthbound exit and northbound entrance
247.72398.6794248BEdgewood Avenue / Auburn Avenue / J.W. Dobbs AvenueNorthbound exit and southbound entrance
248.07399.2396 A & B248C
SR 10 east (Freedom Parkway) / Andrew Young International Boulevard – Carter Center, Martin Luther King Jr. National Historical Park, Atlanta Medical Center
Exit 96 A went to Freedom Parkway and exit 96 B went to International Boulevard before the 1980s when they were made into one exit.
248.12399.3195248DJ.W. Dobbs Avenue / Edgewood Avenue / Jesse Hill Drive / Auburn AvenueSouthbound exit and northbound entrance
248.52399.9597249ACourtland Street – Georgia State UniversitySouthbound exit only
248.77400.3698249BPine Street, Peachtree Street – Civic CenterNorthbound exit only
248.97400.6899249CWilliams Street – Georgia World Congress Center, Mercedes-Benz StadiumNo northbound exit (only northbound entrance, southbound entrance, southbound exit); additional ramps for direct HOV access: southbound exit and northbound entrance
249.04400.79100249DSpring Street, West Peachtree StreetNorthbound exit and southbound entrance
249.17401.00100249D



To US 29 / US 78 / US 278 / SR 8 (North Avenue) – Georgia Tech
Southbound exit and northbound entrance
249.88402.14101 and 10225010th Street, 14th Street – Georgia TechNorthbound exit and southbound entrance; no northbound entrance to I-85 north; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s.
250.22402.69101 and 10225016th Street, 14th Street, 10th StreetSouthbound exit and northbound entrance; exit 101 went to 10th Street and exit 102 went to 14th Street before the 1980s.
250.58403.27—251A17th Street – MidtownNorthbound exit only
250.87403.74103251B


I-85 north (SR 403) to SR 400 north – Greenville
Northern end of I-85/SR 295 concurrency; northern terminus of SR 295
251.89405.38104252A US 41 / SR 3 (Northside Drive)Saunders exit 252 southbound
—⬥Southbound exit and northbound entrance
252.25405.96105252BHowell Mill Road
254.27409.21106254Moores Mill Road
255.50411.19107255 US 41 / SR 3 (Northside Parkway) / West Paces Ferry RoadNo access from US 41/SR 3 north to I-75 south
256.60–
256.76
412.96–
413.22
108256Mount Paran RoadSouthbound and northbound entrance via US 41/SR 3
Chattahoochee River257.07–
257.27
413.71–
414.04
Lester and Virginia Maddox Bridge
Cobb​257.65414.65—258Cumberland Boulevard
​257.90415.05—⬥Akers Mill RoadHOV-only ramps for northbound exit and southbound entrance; Express Lane Only ramps for southbound exit or northbound entrance
​258.40415.85109A259A
I-285 east (Atlanta Bypass / SR 407) – Augusta, Greenville
Southbound Exit has an Additional Ramp to US 41/SR 3 (Cobb Parkway); I-285 exit 20
​109B259B
I-285 west (Atlanta Bypass / SR 407) – Birmingham, Montgomery, Tampa
I-285 exit 20
​258.60416.18—— I-75 Northwest Corridor Express LanesSouth end of Northwest Corridor I-75 Express lanes
​259.98418.40110260Windy Hill Road – Smyrna
Marietta261.58420.97111261
SR 280 west (Delk Road) – Lockheed, Dobbins AFB
Eastern terminus of SR 280
263.29423.72112263 SR 120 – Marietta, RoswellFormer SR 120 Loop
265.08426.60113265 SR 120 Alt. – Marietta, RoswellFormer SR 120 Loop
267.12429.89114A267A
SR 5 Spur north (Canton Road)
Southern terminus of SR 5 Spur
​114B267B

SR 5 south to US 41 – Marietta
Southern end of SR 5 concurrency
​268.71432.45115268

I-575 north (SR 417) / SR 5 north – Ball Ground, Canton
Northern end of SR 5 concurrency; southern terminus of I-575; southbound exit is via exit 269.
​269.46433.65116269 SR 5 Conn. / Barrett Parkway – KennesawFormerly Roberts Road
​271.19436.44117271To north I-575 to Chastain Road north
Kennesaw272.95439.27118273Wade Green Road – Kennesaw
Acworth274.20441.28—— I-75 Northwest Corridor Express LanesNorth end of Northwest Corridor I-75 Express lanes
Cherokee​277.19446.09120277 SR 92 – Acworth
Bartow​278.48448.17121278Glade Road – Acworth
Emerson283.58456.38122283Allatoona Road – Emerson
​285.27459.10123285Red Top Mountain RoadFuture northern terminus of SR 113[75]
Cartersville287.82463.20124288
SR 113 south – Cartersville
Current northern terminus of SR 113; future northern terminus of SR 61 Conn.[75]
​290.20467.03125290 SR 20 – Rome, Canton
Cartersville293.60472.50126293 US 411 / SR 61 – Chatsworth, White, Cartersville
​296.54477.23127296Cassville–White Road
Adairsville305.82492.17128306 SR 140 – Adairsville
Gordon​310.42499.57—310 SR 53 (Union Grove Road) – Calhoun, Fairmount, Rome
Calhoun312.44502.82129312Calhoun, Fairmount, RomeFormer SR 53
315.26507.36130315 SR 156 (Redbud Road) – Calhoun
​317.29510.63131317 SR 225 – Chatsworth, Calhoun
Resaca318.67512.85132318 US 41 / SR 3 – Resaca, Calhoun
320.29515.46133320 SR 136 – Resaca, LaFayette
Whitfield​325.93524.53134326Carbondale Road
​328.56528.77135328 SR 3 Conn. – Dalton
Dalton333.71537.05136333 SR 52 / SR 71 (Walnut Avenue) – Dalton
335.96540.68137336 US 41 / US 76 (SR 2 / SR 3) – Dalton, Rocky Face
​341.16549.04138341 SR 201 – Tunnel Hill, Varnell
Catoosa​344.72554.77139345 US 41 / US 76 (SR 2 / SR 3) – Ringgold, LaFayette
​348.07560.16140348 SR 151 – Ringgold, LaFayette
​350.13563.48141350 SR 2 (Battlefield Parkway) – Fort Oglethorpe
​353.70569.22142353 SR 146 – Rossville, Fort Oglethorpe
Tennessee state line355.10571.48
I-75 north – Chattanooga
Continuation into Tennessee
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Close
I-75 north at exit 156 in Bibb County in 2016; the left three lanes are for the I-475 bypass of Macon

There are three auxiliary Interstate Highways related to I-75 in Georgia and a fourth that was proposed. I-175 was a proposed spur from Albany northeast to Cordele. The road was built, but not as a freeway; it is SR 300, the Florida–Georgia Parkway. I-475 is a western bypass of Macon, shortening the trip for through I-75 traffic. I-575 is a spur from near Marietta north to Canton and Nelson, and I-675 is a cutoff from I-75 south of Atlanta north to I-285 (Atlanta's perimeter)—east of I-75.

Additionally, there are three business routes of I-75 in the state. The first I-75 Business Loop (I-75 BL) runs through central Valdosta mostly concurrent with US 221. The second I-75 BL runs through downtown Tifton mostly concurrent with US 41, and a third one that runs through Cordele. There was a former I-75 BL in Adel–Sparks.

See also

References

Related Articles

Timelines

Top Qs

Fact Checks