Jitang station

Guangzhou Metro Line 7 station From Wikipedia, the free encyclopedia

Jitang Station (Chinese: 姬堂站; pinyin: Jītáng Zhàn; Cantonese Yale: Gēitòng Jaahm) is a station of Guangzhou Metro Line 7, located underground at the fork of Fengle North Road, Jitang Changqing Street and Changsheng Street in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

Concourse
Chinese姬堂站
Hanyu PinyinJītáng Zhàn
Hanyu PinyinJītáng Zhàn
Yale RomanizationGēitòng Jaahm
Quick facts Chinese name, Chinese ...
Jitang

姬堂
Guangzhou Metro
Platform
Chinese name
Chinese姬堂站
Transcriptions
Standard Mandarin
Hanyu PinyinJītáng Zhàn
Yue: Cantonese
Yale RomanizationGēitòng Jaahm
JyutpingGei1tong4 Zaam6
General information
LocationFork of Fengle North Road (丰乐北路), Jitang Changqing Street (姬堂长庚街) and Changsheng Street (长盛街), Dasha Subdistrict
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°8′4.49″N 113°27′2.05″E
Operated byGuangzhou Metro Co. Ltd.
Line     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code715
History
Opened28 December 2023 (2 years ago) (2023-12-28)
Services
Preceding station Guangzhou Metro Following station
Dashadong
towards Meidi Dadao
Line 7 Jiazhuang
towards Yanshan
Location
Close

Station layout

G Street level Exits A, B, D, E
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Dashadong)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 1  7  towards Yanshan (Jiazhuang) arrow for R

Entrances/exits

The station has 4 points of entry/exit, with Exit E being accessible via elevator.[1]

  • A: Fengle North Road
  • B: Fengle North Road
  • D: Fengle North Road
  • E: Fengle North Road Wheelchair user access

History

The station started construction of the main station structure on 20 March 2020,[3] topped out the main structure on 13 October 2022, and topped out of the auxiliary structures on 28 March 2023.[4]

The station completed the "three rights" transfer on 31 October 2023.[5] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2][6]

Future development

The station is planned to have an interchange with Line 19.[7]

References

Related Articles

Wikiwand AI