Jiazhuang station

From Wikipedia, the free encyclopedia

Hanyu PinyinJiāzhuāng Zhàn
Hanyu PinyinJiāzhuāng Zhàn
Jiazhuang

加庄
Guangzhou Metro
Platform
Chinese name
Simplified Chinese加庄站
Traditional Chinese加莊站
Transcriptions
Standard Mandarin
Hanyu PinyinJiāzhuāng Zhàn
Yue: Cantonese
Yale RomanizationGājōng Jaahm
JyutpingGaa1zong1 Zaam6
General information
LocationFork of Nanyun 5th Road (南云五路) and Kefeng Road (科丰路), border of Lianhe and Dasha Subdistricts
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°9′2.34″N 113°27′17.64″E / 23.1506500°N 113.4549000°E / 23.1506500; 113.4549000
Operated byGuangzhou Metro Co. Ltd.
Line     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code716
History
Opened28 December 2023 (2 years ago) (2023-12-28)
Services
Preceding station Guangzhou Metro Following station
Jitang
towards Meidi Dadao
Line 7 Kefeng Lu
towards Yanshan
Location

Jiazhuang Station (simplified Chinese: 加庄站; traditional Chinese: 加莊站; pinyin: Jiāzhuāng Zhàn; Cantonese Yale: Gājōng Jaahm) is a station of Guangzhou Metro Line 7, located underground at the fork of Nanyun 5th Road and Kefeng Road in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

Concourse

Entrances/exits

G Street level Exits B, C, D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Jitang)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 1  7  towards Yanshan (Kefeng Lu) arrow for R

The station has 3 points of entry/exit, with Exit C being accessible via elevator.[1]

  • B: Kefeng Road
  • C: Kefeng Road Wheelchair user access
  • D: Kefeng Road (stairs only)

History

In July 2019, the station site began enclosure construction.[3] In September the same year, the station started construction of the main station structure.[4] On 16 August 2020, the main structure of the second section of this station was topped out.[5]

The station completed the "three rights" transfer on 7 November 2023.[6] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]

Future development

References

Related Articles

Wikiwand AI