Jiazhuang station
From Wikipedia, the free encyclopedia
Platform | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 加庄站 | ||||||||||||
| Traditional Chinese | 加莊站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Fork of Nanyun 5th Road (南云五路) and Kefeng Road (科丰路), border of Lianhe and Dasha Subdistricts Huangpu District, Guangzhou, Guangdong China | ||||||||||||
| Coordinates | 23°9′2.34″N 113°27′17.64″E / 23.1506500°N 113.4549000°E | ||||||||||||
| Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
| Line | Line 7 | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | 716 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2023 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Jiazhuang Station (simplified Chinese: 加庄站; traditional Chinese: 加莊站; pinyin: Jiāzhuāng Zhàn; Cantonese Yale: Gājōng Jaahm) is a station of Guangzhou Metro Line 7, located underground at the fork of Nanyun 5th Road and Kefeng Road in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

Entrances/exits
| G | Street level | Exits B, C, D |
| L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 Platforms |
Platform 2 | |
| Island platform, doors will open on the left (Toilets, Nursery) | ||
| Platform 1 | 7 towards Yanshan (Kefeng Lu) | |
The station has 3 points of entry/exit, with Exit C being accessible via elevator.[1]
- Entrance B
- Entrance C
- Entrance D
History
In July 2019, the station site began enclosure construction.[3] In September the same year, the station started construction of the main station structure.[4] On 16 August 2020, the main structure of the second section of this station was topped out.[5]
The station completed the "three rights" transfer on 7 November 2023.[6] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]