KD Perak

From Wikipedia, the free encyclopedia

NamePerak
NamesakePerak
Laid downMarch 2002
KD Perak on 31 March 2009
History
Malaysia
NamePerak
NamesakePerak
BuilderBHIC, Lumut, Perak
Laid downMarch 2002
Launched12 November 2007
Commissioned3 June 2009
IdentificationPennant number: F173
StatusActive
General characteristics
Class & typeKedah-class offshore patrol vessel
Displacement1,850 tons full load
Length91.1 m (299 ft)
Beam12.85 m (42.2 ft)
Draught3.4 m (11 ft)
PropulsionMain propulsion: 2x Caterpillar 3616 (5,450kW) diesel, 16,000 bhp, 2 shafts, 2 controllable pitch propellers
Speed24 knots (44 km/h; 28 mph)
Range6,050 nautical miles (11,200 km; 6,960 mi)
Endurance21 days
Complement78 (accom. for 98)
Sensors &
processing systems
  • Combat system: Atlas Elektronik COSYS-110 M1/ARGOS
  • Integrated platform management system: CAE
  • Search radar: EADS TRS-3D/ 16ES PESA radar
  • Fire control radar: Oerlikon Contraves TMX/EO X-band with electro-optic fire director
  • Thermal imager: Rheinmetall TMEO
  • Sonar: L-3 ELAC Nautik NDS-3060 Obstacle Avoidance sonar
  • IFF system: Aeromaritime
Electronic warfare
& decoys
  • ESM: Thales Sceptre-X
  • Decoy: Sippican ALEX/SRBOC chaff / decoy launching system
Armament
Aircraft carried1 x Super Lynx 300
Aviation facilities
  • Stern hangar
  • Helicopter landing platform

KD Perak (F173) is the third ship of Kedah-class offshore patrol vessel of the Royal Malaysian Navy. She was commissioned on 3 June 2009.

Construction and career

References

Related Articles

Wikiwand AI