Line 5 (São Paulo Metro)

Rail line in São Paulo, Brazil From Wikipedia, the free encyclopedia

Line 5 (Lilac) (Portuguese: Linha 5–Lilás) is one of the six lines that make up the São Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network. The line transports about 600,000 people every business day, and since August 2018 it is operated by the private company Motiva Linhas 5 e 17.[2]

StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Quick facts São Paulo Metro Line 5 (Lilac), Overview ...
São Paulo Metro Line 5 (Lilac)
Overview
StatusOperational
Owner Government of the State of São Paulo
LocaleSão Paulo, Brazil
Termini
Connecting lines
  • Current:
    • Line 1 (São Paulo Metro) Line 2 (São Paulo Metro)
    • Line 17 (São Paulo Metro)
  • Planned:
Stations17 in operation
2 in project
Websitetrilhos.motiva.com.br/viamobilidade5
Service
TypeRapid transit
SystemSão Paulo Metro
Operator Motiva Linhas 5 e 17
Depot(s)Capão Redondo rail yard
Guido Caloi rail yard
Rolling stock
History
Commenced1998
OpenedOctober 20, 2002; 23 years ago (October 20, 2002)
Last extensionSeptember 28, 2018
Technical
Line length19.9 km (12.4 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge[1]
ElectrificationOverhead line, 1,500 V DC
Operating speed80 km/h (50 mph)
SignallingBombardier CITYFLO 650 CBTC
Route map

Jardim Ângela
Comendador Sant'Anna
Up arrow
Planned
Capão Redondo rail yard
Capão Redondo
Campo Limpo
Vila das Belezas
Giovanni Gronchi
Guido Caloi rail yard
Santo Amaro
Largo Treze
Adolfo Pinheiro
Alto da Boa Vista
Borba Gato
Brooklin
Line 17 (São Paulo Metro)
Campo Belo
Line 17 (São Paulo Metro)
Eucaliptos
Moema
Bicicletas train park
AACD–Servidor
Hospital São Paulo
Santa Cruz
Line 1 (São Paulo Metro)
Chácara Klabin
Line 2 (São Paulo Metro)
Close

The southern section of the line, between Largo Treze and Capão Redondo was completed in 2002 and was envisioned as a railway line of the CPTM called Line G. The project was transferred to the São Paulo Metro and renamed to Line 5 - Lilac. A northern extension connecting it with the rest of the São Paulo Metro network started construction 2009 with a completion deadline of 2013.[3] The project stalled due to issues with property acquisition and restarted in 2011.[4] The completion deadline of the extension has been delayed several times, but it has been reached on 8 April 2019.[5]

Identification placard at Capão Redondo station
Alstom train in Line 5

Stations

Operational

There are currently 17 operational stations on the Capão Redondo ↔ Chácara Klabin stretch:

More information Code, Station ...
Code Station Platforms Position Connections District
TBA Jardim Ângela TBA Underground Jardim Ângela Bus Terminal Capão Redondo
Comendador Sant'Anna Elevated -
CPR Capão Redondo Side platforms Capão Redondo Bus Terminal
CPL Campo Limpo Campo Limpo Bus Terminal Campo Limpo
VBE Vila das Belezas - Vila Andrade
GGR Giovanni Gronchi João Dias Bus Terminal
Itapecerica–João Dias–Santo Amaro Bus Corridor
STA Santo Amaro
Guido Caloi Bus Terminal
Santo Amaro
LTR Largo Treze Underground Santo Amaro Bus Terminal
Santo Amaro–9 de Julho–Centro Bus Corridor
APN Adolfo Pinheiro Santo Amaro–9 de Julho–Centro Bus Corridor
ABV Alto da Boa Vista Island platform -
BGA Borba Gato Santo Amaro–9 de Julho–Centro Bus Corridor
BRK Brooklin Santo Amaro–9 de Julho–Centro Bus Corridor
Diadema–Morumbi Metropolitan Corridor
Campo Belo
CPB Campo Belo Line 17 (São Paulo Metro)
ECT Eucaliptos Side platforms José Diniz–Ibirapuera–Santa Cruz Bus Corridor Moema
MOE Moema  20  (Planned)
José Diniz–Ibirapuera–Santa Cruz Bus Corridor
SER AACD–Servidor -
HSP Hospital São Paulo José Diniz–Ibirapuera–Santa Cruz Bus Corridor Vila Mariana
SCZ Santa Cruz Line 1 (São Paulo Metro)
José Diniz–Ibirapuera–Santa Cruz Bus Corridor
CKL Chácara Klabin Line 2 (São Paulo Metro)
Close

Extensions from Capão Redondo to Jardim Ângela are planned.[6]

Technical specifications

The line operates with 25 trains (out of 26 available)[7] and is made-up by 17 stations, transporting about 600,000 people every business day.[2] Eight additional trains are expected to be added to the line in 2020, after CBTC installation and other enhancements are completed.[8]

It was the first line in the Sao Paulo Metro to utilize a 1500 V tension Catenary, Standard Gauge, beside trains with IGBT power conversion and 1.60 m (5 ft 3 in) wide doors.[9] Santo Amaro station was the first in Brazil to be built on a cable-stayed bridge.[10]

During the 11.5 km (7.1 mi) extension between Largo Treze and Chacara Klabin stations, three TBMs were used and 26 CAF trains were added to the line in addition to the eight Alstom trains originally available.[11]