This is a list of all stations of the Mumbai Metro, a rapid transit system serving Mumbai in the Mumbai Metropolitan Region, India. The Mumbai Metro is the fifth transit system to be built in India. The first line of the Mumbai Metro was opened on 8 June 2014 with Blue Line 1, with the current total number of 77 stations operating as of August 2026.[1]

Topological map of Mumbai's public transport system

Currently, the expansion of the Mumbai Metro network is going to be around 200 km (120 mi). This expansion will allow Mumbai to connect with its satellite cities that lay in the Mumbai Metropolitan Region.[2][3][4]

Each line of the Mumbai Metro is identified by a specific color. The system uses rolling stocks of standard gauge trains and has a combination of elevated, underground and at-grade lines.[5]

Metro stations

† Terminal station
* Transfer station
†* Terminal and transfer station to other lines
†† Transfer station to Mumbai Suburban Railway and Mumbai Monorail
** Transfer station to other lines and Mumbai Suburban Railway and Mumbai Monorail
#* Terminal and transfer station to Mumbai Suburban Railway, Mumbai Monorail and Indian Railways
†¤ Terminal, transfer station to other lines, Mumbai Suburban Railway, Mumbai Monorail and Indian Railways

This list is sortable. Click on the icon in the column header to change sort key and sort order.

Operational

More information Station name, Line ...
Station name Line Layout Platform layout Status Notes Ref.
English Marathi
Aarey आरे Line 7 Elevated Side Operational from 2 April 2022 [6]
Aarey JVLR†* आरे जे.व्ही.एल.आर. Line 3 At-grade Side Operational from 5 October 2024 Interchange with Line 6 on SEEPZ Village [7][8][9]
Acharya Atre Chowk आचार्य अत्रे चौक Line 3 Underground Island Operational from 9 May 2025 [10]
Airport Road विमानतळ रस्ता Line 1 Elevated Side Operational from 8 June 2014 [11]
Akurli आकुर्ली Line 7 Elevated Side Operational from 2 April 2022 [12][13]
Anand Nagar आनंद नगर Line 2A Elevated Side Operational from 2 April 2022 [14]
Andheri West* अंधेरी (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023 Interchange with Line 1 on D N Nagar
Andheri†† अंधेरी Line 1 Elevated Side Operational from 8 June 2014 Transfer station to Andheri railway station [15]
Asalpha असल्फा Line 1 Elevated Side Operational from 8 June 2014 [16]
Azad Nagar आझाद नगर Line 1 Elevated Side Operational from 8 June 2014 [17]
Bandra Colony वांद्रे वसाहत Line 3 Underground Island Operational from 5 October 2024 [18]
Bandra Kurla Complex* वांद्रे कुर्ला संकुल Line 3 Underground Island Operational from 5 October 2024 Interchange with Line 2B on Income Tax Office [19][20]
Bangur Nagar बांगुर नगर Line 2A Elevated Side Operational from 19 January 2023 [21]
Borivali West बोरीवली (पश्चिम) Line 2A Elevated Side Operational from 2 April 2022 [22][23]
Chakala (J. B. Nagar) चकाला (जे.बी. नगर) Line 1 Elevated Side Operational from 8 June 2014 [24]
Chembur†† चेंबूर Line 2B Elevated Side Operational from 13 August 2026 Transfer station to VNP and RC Marg Junction monorail station [25]
Chhatrapati Shivaji Maharaj Chowk (Chembur) छत्रपती शिवाजी महाराज चौक (चेंबूर) Line 2B Elevated Side Operational from 8 April 2026 [26]
Chhatrapati Shivaji Maharaj International Airport - T1 छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी१ Line 3 Underground Island Operational from 5 October 2024 [27]
Chhatrapati Shivaji Maharaj International Airport - T2†* छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी२ Line 3
Line 7
Line 8
Underground Side and island Operational from 5 October 2024;
under construction
[28]
Chhatrapati Shivaji Maharaj Terminus†¤ छत्रपती शिवाजी महाराज टर्मिनस Line 3
Line 11
Underground Side and island Operational from 9 October 2025;
under construction
Transfer station to Chhatrapati Shivaji Maharaj Terminus [29][30]
Churchgate†† चर्चगेट Line 3 Underground Island Operational from 9 October 2025 Transfer station to Churchgate railway station [31]
Cuffe Parade† कफ परेड Line 3 Underground Island Operational from 9 October 2025 [32]
D N Nagar* डी.एन. नगर Line 1 Elevated Side Operational from 8 June 2014 Interchange with Line 2A on Andheri West [33]
Dadar दादर Line 3 Underground Island Operational from 9 May 2025 [34]
Dahanukarwadi डहाणूकरवाडी Line 2A Elevated Side Operational from 2 April 2022 [35]
Dahisar East†* दहिसर (पूर्व) Line 2A
Line 9
Elevated Side and island Operational from 2 April 2022;
operational from 8 April 2026
[36]
Deonar देवनार Line 2B Elevated Side Operational from 8 April 2026 [37]
Deshbhakt N.G. Acharya Udyan-Diamond Garden, Chembur देशभक्त ना.ग. आचार्य उद्यान-डायमंड गार्डन, चेंबूर Line 2B Elevated Side Operational from 8 April 2026 [38]
Devipada देवीपाडा Line 7 Elevated Side Operational from 2 April 2022 [39][40]
Dharavi धारावी Line 3 Underground Island Operational from 9 May 2025 [41]
Dindoshi दिंडोशी Line 7 Elevated Side Operational from 2 April 2022 [42]
Eksar एकसर Line 2A Elevated Side Operational from 2 April 2022 [43]
Ghatkopar#* घाटकोपर Line 1 Elevated Island Operational from 8 June 2014 Transfer station to Ghatkopar railway station [44]
Girgaon गिरगाव Line 3 Underground Island Operational from 9 October 2025 [45][46]
Goregaon East गोरेगाव (पूर्व) Line 7 Elevated Side Operational from 19 January 2023 [47][48][49]
Goregaon West गोरेगाव (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023 [50]
Grant Road†† ग्रँट रोड Line 3 Underground Island Operational from 9 October 2025 Transfer station to Grant Road railway station [51][52]
Gundavali* गुंदवली Line 7 Elevated Side Operational from 19 January 2023 Interchange with Line 1 on Western Express Highway [53][54][55][56]
Hutatma Chowk हुतात्मा चौक Line 3 Underground Island Operational from 9 October 2025 [57]
Jagannath Shankar Sheth†† जगन्नाथ शंकरशेठ Line 3 Underground Island Operational from 9 October 2025 Transfer station to Mumbai Central railway station [58]
Jagruti Nagar जागृती नगर Line 1 Elevated Side Operational from 8 June 2014 [59]
Jogeshwari East जोगेश्वरी (पूर्व) Line 7 Elevated Side Operational from 19 January 2023 Interchange with Line 6 on JVLR Junction
Kalbadevi काळबादेवी Line 3 Underground Island Operational from 9 October 2025 [60]
Kandarpada कांदरपाडा Line 2A Elevated Side Operational from 2 April 2022 [61]
Kandivli West कांदिवली (पश्चिम) Line 2A Elevated Side Operational from 2 April 2022 [62][63][64]
Kashigaon काशिगाव Line 9 Elevated Side Operational from 8 April 2026 [65][66]
Kurar कुरार Line 7 Elevated Side Operational from 2 April 2022 [67]
Lower Malad लोअर मालाड Line 2A Elevated Side Operational from 19 January 2023 [68]
Lower Oshiwara* लोअर ओशिवरा Line 2A Elevated Side Operational from 19 January 2023 Interchange with Line 6 on Adarsh Nagar (Mumbai) [69]
Magathane मागाठाणे Line 7 Elevated Side Operational from 2 April 2022 [70]
Mahalaxmi†† महालक्ष्मी Line 3 Underground Island Operational from 9 October 2025 Transfer station to Mahalaxmi railway station and Sant Gadge Maharaj Chowk monorail station [71]
Maharashtranagar Mandale† महाराष्ट्रनगर मंडाळे Line 2B Elevated Side Operational from 8 April 2026 [72]
Malad West मालाड (पश्चिम) Line 2A Elevated Side Operational from 19 January 2023 [73]
Mandapeshwar मंडपेश्वर Line 2A Elevated Side Operational from 2 April 2022 [74]
Mankhurd** मानखुर्द Line 2B
Line 8
Elevated Side and island Operational from 8 April 2026;
under construction
Transfer station to Mankhurd railway station [75]
Marol Naka* मरोळ नाका Line 1
Line 3
Elevated; underground Side and island Operational from 8 June 2014;
operational from 5 October 2024
[76][77]
MIDC - Andheri एम.आय.डी.सी. - अंधेरी Line 3 Underground Island Operational from 5 October 2024 [78]
Miragaon* मिरागाव Line 9 Elevated Side Operational from 8 April 2026 Interchange with Line 10 on Shivaji Chowk (Mira Road) [79]
Mogra मोगरा Line 7 Elevated Side Operational from 19 January 2023 [80]
Oshiwara ओशिवरा Line 2A Elevated Side Operational from 19 January 2023 [81]
Ovaripada ओवरीपाडा Line 7 Elevated Side Operational from 2 April 2022 [82]
Pandurang Wadi पांडुरंग वाडी Line 9 Elevated Side Operational from 8 April 2026 [83][84][85]
Poisar पोईसर Line 7 Elevated Side Operational from 2 April 2022 [86][87]
Rashtriya Udyan राष्ट्रीय उद्यान Line 7 Elevated Side Operational from 2 April 2022 [88]
Sahar Road सहार रोड Line 3 Underground Island Operational from 5 October 2024 [89][90]
Saki Naka साकी नाका Line 1 Elevated Side Operational from 8 June 2014 [91]
Santacruz†† सांताक्रुझ Line 3 Underground Island Operational from 5 October 2024 Transfer station to Santacruz railway station [92]
Science Centre विज्ञान केंद्र Line 3 Underground Island Operational from 9 October 2025 [93]
SEEPZ* सीप्झ Line 3 Underground Island Operational from 5 October 2024 [94]
Shimpoli शिंपोली Line 2A Elevated Side Operational from 2 April 2022 [95]
Shitaladevi Mandir शितलादेवी मंदिर Line 3 Underground Island Operational from 9 May 2025 [96][97]
Siddhivinayak सिद्धिविनायक Line 3 Underground Island Operational from 9 May 2025 [98]
Valnai–Meeth Chowky वळनई–मीठ चौकी Line 2A Elevated Side Operational from 19 January 2023 [99]
Versova† वर्सोवा Line 1 Elevated Side Operational from 8 June 2014 [100]
Vidhan Bhavan विधान भवन Line 3 Underground Island Operational from 9 October 2025 [101][102]
Western Express Highway* पश्चिम द्रुतगती महामार्ग Line 1 Elevated Side Operational from 8 June 2014 Interchange with Line 7 on Gundavali [103]
Worli वरळी Line 3 Underground Island Operational from 9 May 2025 [104][105]
Close

Under construction

More information Station name, Line ...
Station name Line Layout Platform layout Status Notes Refs
English Marathi
Adarsh Nagar (Mumbai)* आदर्श नगर (मुंबई) Line 6 Elevated Side Under construction Interchange with Line 2A on Lower Oshiwara [106]
Airport Colony विमानतळ वसाहत Line 7 Elevated Side Under construction – [107]
Amar Mahal Junction अमर महल जंक्शन Line 4 Elevated Side Under construction – [108]
Anik Nagar Bus Depot† आणिक नगर बस डेपो Line 11 At-grade Side Under construction – [109]
Anjur Phata अंजूर फाटा Line 5 Elevated Side Under construction – [110][111]
Apollo अपोलो Line 8 Elevated Side Under construction –
Baiganwadi बैगनवाडी Line 8 Elevated Side Under construction –
Bale बाळे Line 12 Elevated Side Under construction –
Balkum Naka बाळकुम नाका Line 5 Elevated Side Under construction – [112]
Bandra†† वांद्रे Line 2B Elevated Side Under construction Transfer station to Bandra railway station [113][114]
Bhandup†† भांडुप Line 4 Elevated Side Under construction Transfer station to Bhandup railway station [115]
Bhandup Mahapalika भांडुप महापालिका Line 4 Elevated Side Under construction – [116]
Bhendi Bazaar भेंडी बाजार Line 11 Underground Island Under construction –
Bhiwandi भिवंडी Line 5 Elevated Side Under construction – [117]
BPT Hospital बी.पी.टी. रुग्णालय Line 11 Underground Island Under construction –
Byculla†† भायखळा Line 11 Underground Island Under construction Transfer station to Byculla railway station
Cadbury Junction कॅडबरी जंक्शन Line 4 Elevated Side Under construction – [118]
CGS Colony†† सी.जी.एस. कॉलनी Line 11 Underground Island Under construction Transfer station to Bhakti Park monorail station [119]
Coal Bunder कोळसा बंदर Line 11 Underground Island Under construction –
Crawford Market क्रॉफर्ड मार्केट Line 11 Underground Island Under construction –
Dhamankar Naka धामणकर नाका Line 5 Elevated Side Under construction – [120]
Dombivali MIDC डोंबिवली एमआयडीसी Line 12 Elevated Side Under construction –
Dongripada डोंगरीपाडा Line 4 Elevated Side Under construction – [121]
Durgadi Fort दुर्गाडी किल्ला Line 5 Elevated Side Under construction – [122]
Eastern Express Highway पूर्व द्रुतगती महामार्ग Line 2B Elevated Side Under construction – [123]
ESIC Nagar ई.एस.आय.सी. नगर Line 2B Elevated Side Under construction – [124]
Gaimukh† गायमुख Line 4 Elevated Side Under construction – [125]
Gaimukh Reti Bandar गायमुख रेतीबंदर Line 10 Elevated Side Under construction – [126]
Gandhi Nagar (Kanjurmarg)** गांधी नगर Line 4 Elevated Side Under construction Interchange with Line 6 on Kanjurmarg (West) and Transfer station to Kanjur Marg railway station [127]
Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Line 12 Elevated Side Under construction –
Ganesh Nagar (Wadala) गणेश नगर (वडाळा) Line 11 Underground Island Under construction –
Garodia Nagar* गरोडिया नगर Line 4
Line 8
Elevated; underground Side and island Under construction – [128]
Godrej Company गोदरेज वसाहत Line 4 Elevated Side Under construction – [129]
Golavali गोळवली Line 12 Elevated Side Under construction –
Gopal Nagar गोपाळ नगर Line 5 Elevated Side Under construction – [130]
Govegaon MIDC गोवेगाव एम.आय.डी.सी. Line 5 Elevated Side Under construction – [131]
Gowniwada गोवनीवाडा Line 4 Elevated Side Under construction – [132]
Hay Bunder हे बंदर Line 11 Underground Island Under construction –
Hedutane हेदुटणे Line 12 Elevated Side Under construction –
Horniman Circle हॉर्निमन सर्कल Line 11 Underground Island Under construction –
IIT Powai आय.आय.टी. पवई Line 6 Elevated Side Under construction – [133]
ILFS आय.एल. आणि एफ.एस. Line 2B Elevated Side Under construction – [134]
Income Tax Office* आयकर कार्यालय Line 2B Elevated Side Under construction Interchange with Line 3 on Bandra Kurla Complex
Indira Nagar (Vile Parle) इंदिरा नगर Line 2B Elevated Side Under construction – [135][136]
ISBT आय.एस.बी.टी. Line 8 Elevated Side Under construction –
Jogeshwari (West)†† जोगेश्वरी (पश्चिम) Line 6 Elevated Side Under construction Transfer station to Jogeshwari railway station [137]
Juinagar†† जुईनगर Line 8 Elevated Side Under construction Transfer station to Juinagar railway station
JVLR Junction* जे.व्ही.एल.आर. Line 6 Elevated Side Under construction Interchange with Line 7 on Jogeshwari East [138][139][140]
Kalher काल्हेर Line 5 Elevated Side Under construction – [141][142]
Kalyan APMC कल्याण ए.पी.एम.सी. Line 12 Elevated Side Under construction – [143]
Kalyan Railway Station#* कल्याण रेल्वे स्थानक Line 12 Elevated Side Under construction Transfer station to Kalyan Junction railway station [144]
Kanjurmarg (West)** कांजुर मार्ग Line 6 Elevated Side Under construction Interchange with Line 4 on Gandhi Nagar (Kanjurmarg) and Transfer station to Kanjur Marg railway station [145][146]
Kapurbawdi†* कापूरबावडी Line 4
Line 5
Elevated Side and island Under construction – [147]
Kasarvadavali कासारवडवली Line 4 Elevated Side Under construction – [148]
Kasheli कशेळी Line 5 Elevated Side Under construction – [149]
Kashimira काशिमिरा Line 10 Elevated Side Under construction –
Khira Nagar खिरा नगर Line 2B Elevated Side Under construction – [150]
Kolegaon कोळेगाव Line 12 Elevated Side Under construction –
Kongaon कोनगाव Line 5 Elevated Side Under construction – [151]
Kurla†† कुर्ला Line 8 Underground Island Under construction Transfer station to Kurla railway station
Kurla (East) कुर्ला (पूर्व) Line 2B Elevated Side Under construction – [152]
Laxmi Nagar (Ghatkopar) लक्ष्मी नगर Line 4 Elevated Side Under construction – [153]
Lokmanya Tilak Terminus†† लोकमान्य टिळक टर्मिनस Line 8 Underground Island Under construction Transfer station to Lokmanya Tilak Terminus
LP एल.पी. Line 8 Elevated Side Under construction –
Mahakali Caves महाकाली गुहा Line 6 Elevated Side Under construction – [154]
Mahapalika Marg महापालिका मार्ग Line 4 Elevated Side Under construction – [155]
Majiwada माजिवडा Line 4 Elevated Side Under construction – [156][157]
Manpada (Dombivali East) मानपाडा (डोंबिवली) Line 12 Elevated Side Under construction –
Manpada (Thane) मानपाडा (ठाणे) Line 4 Elevated Side Under construction – [158][159]
Deepak Hospital (Medtiya Nagar) मेडतिया नगर Line 9 Elevated Side Under construction – [160]
MTNL एम.टी.एन.एल. Line 2B Elevated Side Under construction – [161]
Mulund Fire Station मुलुंड अग्निशमन केंद्र Line 4 Elevated Side Under construction – [162]
Mulund Naka मुलुंड नाका Line 4 Elevated Side Under construction – [163]
Nagpada Junction नागपाडा जंक्शन Line 11 Underground Island Under construction – [164]
Nanavati Hospital नानावटी रुग्णालय Line 2B Elevated Side Under construction – [165]
Navi Mumbai International Airport West नवी मुंबई आंतरराष्ट्रीय विमानतळ पश्चिम Line 8 Elevated Side Under construction –
Navi Mumbai International Airport Terminal 2† नवी मुंबई आंतरराष्ट्रीय विमानतळ टर्मिनल २ Line 8 Elevated Side Under construction –
National College (Bandra) राष्ट्रीय महाविद्यालय Line 2B Elevated Side Under construction – [166]
Naval Housing नौदल गृहनिर्माण Line 4 Elevated Side Under construction – [167]
Nerul†† नेरूळ Line 8 Elevated Side Under construction Transfer station to Nerul railway station
Nilaje Gaon निळजे गाव Line 12 Elevated Side Under construction –
Pant Nagar पंत नगर Line 4 Elevated Side Under construction – [168]
Phoenix Mall फिनिक्स मॉल Line 8 Underground Island Under construction –
Pisarve पिसार्वे Line 12 Elevated Side Under construction –
Pisarve Depot पिसार्वे डेपो Line 12 Elevated Side Under construction –
Pisavali Gaon पिसवली गाव Line 12 Elevated Side Under construction –
Powai Lake पवई तलाव Line 6 Elevated Side Under construction – [169]
Prem Nagar प्रेम नगर Line 2B Elevated Side Under construction – [170]
Purna पूर्णा Line 5 Elevated Side Under construction – [171]
Rajnouli Village रांजणोली Line 5 Elevated Side Under construction – [172]
Rambaug (Powai) रामबाग Line 6 Elevated Side Under construction – [173]
Reay Road†† रे रोड Line 11 Underground Island Under construction Transfer station to Reay Road railway station
RTO Thane आर.टी.ओ. ठाणे Line 4 Elevated Side Under construction – [174]
SG Barve Marg* एस.जी. बर्वे मार्ग Line 2B
Line 8
Elevated; underground Side and island Under construction – [175]
Sagaon सागाव Line 12 Elevated Side Under construction –
Sagar Sangam सागरसंगम Line 8 Elevated Side Under construction –
Sahajanand Chowk सहजानंद चौक Line 5 Elevated Side Under construction – [176]
Sai Baba Nagar साई बाबा नगर Line 9 Elevated Side Under construction – [177]
Saki Vihar Road साकी विहार Line 6 Elevated Side Under construction – [178]
Sanpada†† सानपाडा Line 8 Elevated Side Under construction Transfer station to Sanpada railway station
Saraswat Nagar सारस्वत नगर Line 2B Elevated Side Under construction – [179]
Seawoods†† सीवूड्स Line 8 Elevated Side Under construction Transfer station to Seawoods-Darave-Karave railway station
SEEPZ Village* सीप्झ गाव Line 6 Elevated Side Under construction Interchange with Line 3 on Aarey JVLR [180]
Sewri†† शिवडी Line 11 Underground Island Under construction Transfer station to Sewri railway station
Shahid Bhagat Singh Garden शहीद भगतसिंग उद्यान Line 9 Elevated Side Under construction – [181]
Shangrila शांग्रीला Line 4 Elevated Side Under construction – [182]
Shivaji Chowk (Mira Road)†* शिवाजी चौक (मीरा रोड) Line 10
Line 13[a]
Elevated Side and island Under construction Interchange with Line 9 on Miragaon [183]
Shreyas Cinema श्रेयस सिनेमा Line 4 Elevated Side Under construction – [184]
Shyam Nagar (Mumbai) श्याम नगर (मुंबई) Line 6 Elevated Side Under construction – [185]
Siddharth Colony सिद्धार्थ वसाहत Line 4 Elevated Side Under construction – [186]
Sonapur सोनापूर Line 4 Elevated Side Under construction – [187]
Sonarpada सोनारपाडा Line 12 Elevated Side Under construction –
SPM Circle† एस.पी.एम. सर्कल Line 11 Underground Island Under construction –
Subhash Chandra Bose Stadium† सुभाषचंद्र बोस स्टेडियम Line 9 Elevated Side Under construction – [188]
Suman Nagar सुमन नगर Line 4 Elevated Side Under construction – [189]
Surya Nagar सूर्य नगर Line 4 Elevated Side Under construction – [190]
Swami Samarth Nagar (Lokhandwala)† स्वामी समर्थ नगर Line 6 Elevated Side Under construction – [191]
Taloja†* तळोजा Line 12 Elevated Side Under construction Interchange with Line 1 (Navi Mumbai Metro) on Panchanand metro station
Targhar†† तरघर Line 8 Elevated Side Under construction Transfer station to Targhar railway station
Teen Haath Naka (Thane) तीन हात नाका Line 4 Elevated Side Under construction – [192]
Temghar टेमघर Line 5 Elevated Side Under construction – [193]
Tikuji-ni-wadi टिकुजी-नी-वाडी Line 4 Elevated Side Under construction – [194]
Turbhe तुर्भे Line 12 Elevated Side Under construction –
Vadavali वडवली Line 12 Elevated Side Under construction –
Varsova Char Phata वर्सोवा चार फाटा Line 10 Elevated Side Under construction –
Vashi†† वाशी Line 8 Elevated Side Under construction Transfer station to Vashi railway station
Vijay Garden विजय गार्डन Line 4 Elevated Side Under construction – [195]
Vikhroli EEH†* विक्रोळी ई.इ.एच. Line 6
Line 14[b]
Elevated Side and island Under construction – [196][197][198][199]
Vikhroli†† विक्रोळी Line 4 Elevated Side Under construction Transfer station to Vikhroli railway station [200]
Waklan वाकळण Line 12 Elevated Side Under construction –
Close

Statistics

Total number of metro stations 207
Total number of metro stations operational 77
Total number of metro stations under construction 130
Number of interchange stations 26
Number of elevated stations 166
Number of underground stations 44
Number of at-grade stations 2

Notes

  1. Currently, The metro stations of Purple Line 13 at the DPR stage after that the number of stations should be increased.
  2. Currently, The metro stations of Magenta Line 14 are at the DPR stage after that the number of stations should be increased.