This is a list of operational, offshore wind farms in Denmark (within the national maritime boundaries). Denmark's wind power generation is the highest in the world as a fraction of domestic consumption, reaching 47% in 2019.[1]
Data is primarily from the 4C Offshore's Global Offshore Wind Farm Map and Database.[2][3] Tariff data is supplied by the Danish Energy Agency.[4] The name of the wind farm is the name used by the energy company when referring to the farm, and is usually related to a shoal or the name of the nearest town on shore. The "wind farm" part of the name is implied and hence omitted for ease of reading.
Current farms
| Wind farm | Location | Capacity (MW) |
Turbines | Commissioning | Build cost |
Cap. fac. |
Depth range (m) |
km to shore |
Owner | Refs. |
|---|---|---|---|---|---|---|---|---|---|---|
| Kriegers Flak | 55°01′00″N 12°56′00″E | 604.8 | 72 x Siemens Gamesa SWT-8.4-167 | 2021 | 0.372 DKK/kWh | 15-30 | 25 | Vattenfall | [w 1][5][6] | |
| Horns Rev III | 55°42′00″N 7°41′20″E | 406.7 | 49 x MHIVestas V164-8.3MW | 2019 | €1bn | 10-20 | 30 | Vattenfall | [w 2][7][8][9][10] | |
| Anholt | 56°36′00″N 11°12′36″E | 400 | 111 × Siemens SWP 3.6-120 | 2013 | DKK10b | 46.7% | 15-19 | 23 | Ørsted, others | [w 3][11][12][13][14] |
| Vesterhav | 56.38°N 8°E | 344 | 41 x Siemens SG 8.4MW | 2024 | €769m, 0.475 DKK/kWh | 16 - 28 | 4 - 10 | Vattenfall | [15][16][17][18][19] | |
| Horns Rev II | 55°36′00″N 7°35′24″E | 209 | 91 × Siemens SWP 2.3-93 | 2009 | €470m | 48.4% | 9-17 | 32 | Ørsted | [w 4][20][12] |
| Rødsand II | 54°33′36″N 11°33′0″E | 207 | 90 × Siemens SWP 2.3-93 | 2010 | €400m | 42.1% | 6-12 | 9 | E.ON | [w 5][21][22][12][23] |
| Nysted (Rødsand I) | 54°33′0″N 11°42′36″E | 166 | 72 × Siemens SWP 2.3-82 | 2003 | €248m | 36.1% | 6-9 | 11 | Ørsted 50%, PensionDanmark 50% | [w 6][24][25][12][26][27] |
| Horns Rev I | 55°31′47″N 7°54′22″E | 160 | 80 × Vestas V80-2MW | 2002 | €272m | 39.9% | 10-20 | 18 | Vattenfall 60%, Ørsted 40% | [w 7][12][3][24][25][28][29][30] |
| Middelgrunden wind farm | 55°41′27″N 12°40′13″E | 40 | 20 × Bonus/Siemens 2MW | 2000 | €47m | 25.7% | 3-6 | 4.7 | 50% private, 50% Ørsted | [w 8][24][25][31][32][12][27] |
| Nissum Bredning Vind | 56°40′12″N 8°14′38″E | 28 | 4 x Siemens Gamesa SWT-7.0-154 | 2018 | €40m | ~35-40% | 1-6 | 1.1 | Jysk Energy A/S, Nissum Brednings Vindmøllelaug I/S | [33] |
| Samsø | 55°43′12″N 10°34′48″E | 23 | 10 × Bonus/Siemens 2.3-82 | 2003 | €30m | 38.9% | 10-13 | 4 | Municipal, private | [w 9][12][24][25][34][27] |
| Sprogø | 55°20′24″N 10°57′36″E | 21 | 7 × Vestas V90-3MW | 2009 | 36.5% | 6-16 | 10 | Great Belt Link | [12][24][25][35] | |
| Rønland 1 | 56°39′46″N 8°13′10″E | 17.2 | 4 × Vestas V80-2MW, 4 × Bonus/Siemens 2.3-93 |
2003 | 44.1% | 0-2 | 0.1 | THV (Vestas), Dansk Vindenergi ApS (Bonus) | [w 10][12][24][25][36][37] | |
| Avedøre Holme | 55°36′0″N 12°27′30″E | 10.8 | 3 × Siemens SWP3.6-120 VS | 2009 | €25m | 29.2% | 0-2 | 0.1 | 50% Ørsted, 50% private | [w 11][12][24][25][38] |
| Frederikshavn | 57°26′40″N 10°33′40″E | 7.6 | Nordex N90 2.3 MW, Vestas V90-3MW, Bonus(Siemens) 82.4 2.3 MW |
2003 | 29.3% | 1-4 | 0.3 | Ørsted | [12][24][25][39] | |
| Tunø Knob | 55°58′10″N 10°21′20″E | 5 | 10 × Vestas V39 500 kW | 1995 | £10m | 29.7% | 3-7 | 6 | Ørsted | [12][24][25][40][41] |
Capacity factors are averaged over each wind farm's life.[42]
Future sites
The list is sorted by capacity, but it can be sorted in any way by clicking once or twice on the triangle symbols ( Δ ) at the top in each column.