List of offshore wind farms in the North Sea

From Wikipedia, the free encyclopedia

This is a list of operational, offshore wind farms in the North Sea.

This information is gathered from multiple Internet sources,[1][2] and primarily the 4C Offshore's Global Offshore Wind Farm Map and Database and is current up to July 2015. The name of the Wind Farm is the name used by the Energy Company when referring to the Farm and is usually related to a shoal or the name of the nearest town on shore.

Operational wind farms

More information Wind farm, Country ...
Wind farm Country Location Cap. (MW) Turbines Commissioned Build
cost
Depth
range (m)
km to
shore
Owner Ref.
Albatros Germany 54°30′N 6°24′E 117.6 16 × Siemens SWT-7.0-154 2020
Alpha Ventus Germany 54°00′40″N 6°36′28″E 60 6 × Multibrid M5000,
6 × REpower 5M
2010 250 million2856 EWE 47.5%
E.ON 26.25%
Vattenfall 26.25%
[w 1][3][4]
Amrumbank West Germany 54°31′22″N 7°42′17″E 302 80 × Siemens SWT-3.6-120 2015 20-2540 Amrumbank West GmbH
Borkum Riffgrund I Germany 53°58′00″N 6°33′00″E 312 78 × Siemens SWT-4.0-120 2015 €1.25 billion23-2955 Ørsted, Kirkbi, Oticon [w 2]
Borkum Riffgrund II Germany 53°56′49″N 6°29′07″E 448 56 × MHI Vestas V164 2019
BARD Offshore 1 Germany 54°21′30″N 5°58′30″E 400 80 × BARD 5.0 2013 2,900 million40100 Ocean Breeze Energy [w 3][5]
Beatrice Demonstration Project) United Kingdom 58°06′20″N 03°05′35″W 10 2 × REpower 5M 2007£35 million4523 SSE and Talisman Energy [w 4][1][6][7][8]p11
Belwind Belgium 51°40′N 2°48′E 165 55 × Vestas V90-3.0MW
55 × Alstom Haliade 150-6MW
2010€614 million46 Parkwind [w 5][9][10]
Blyth Offshore United Kingdom 55°08′09″N 01°29′25″W 4 2 × Vestas V66-2MW 2000£4 million6-111.6 E.ON [w 6]
Borssele I–II Netherlands 51°42′N 3°05′E 752 94 × Siemens SWT-8.0-154 2020
Borssele III–IV Netherlands 51°42′25″N 2°54′45″E 731.5 77 × MHI Vestas V164 9.5MW 2021
Borssele V Netherlands 51.7092°N 3.0033°E / 51.7092; 3.0033 (Borssele V (19 MW)) 19 2 × MHI Vestas V164 9.5MW 2021
Butendiek Germany 55°00′49″N 7°46′07″E 288 80 × Siemens SWT-3.6 2015 35 WPD Nordsee Offshore GmbH [w 7]
DanTysk Germany 55°08′N 7°12′E 288 80 × Siemens SWP-3.6-120 2015 $900 million21-3170 Vattenfall
Stadtwerke München
[w 8][11]
Deutsche Bucht Germany 54°18′N 5°48′E 260.4 31 × MHI Vestas V164-8.0 MW 2019
Dudgeon United Kingdom 53°15′00″N 1°23′0″E 402 67 × Siemens SWT-6.0-154 2017 £1.5bn32 Equinor
Statkraft
[w 9]
Egmond aan Zee Netherlands 52°36′N 4°25′E 108 36 × Vestas V90-3MW 2008 200 million15-1813 Nuon, Shell [w 10][12][13]
Luchterduinen Netherlands 52°25′N 4°10′E 129 43 × Vestas V112/3000 2015 €450 million18-2424 Eneco, Mitsubishi [w 11][14]
Gemini Netherlands 54°02′10″N 5°57′47″E 600 150 × Siemens SWT-4.0 2017 €2.8 billion55 Northland Power, Siemens, Van Oord, HVC NV [w 12]
Global Tech I Germany 54°30′00″N 6°21′30″E 400 80 × Multibrid M5000 2015 €1.8 billion39-41110 Wetfeet Offshore Windenergy [w 13]
Gode Wind 1 & 2 Germany 54°04′00″N 7°02′00″E 582 97 × Siemens SWT-6.0-154 2016 €2.2 billion3042 Ørsted [15]
Greater Gabbard United Kingdom 51°56′0″N 1°53′0″E 504 140 × Siemens SWT-3.6-107 2012£1,500 million20-3223 SSE Renewables [w 14]
Gunfleet Sands 1 & 2 United Kingdom 51°43′0″N 01°12′50″E 172 48 × Siemens SWP-3.6-107 2010£300 million2-157 Ørsted [w 15][1][6][16]
Hohe See Germany 54°26′N 6°19′E 497 48 × Siemens SWT-7.0-154 2019
Horns Rev I Denmark 55°31′47″N 7°54′22″E 160 80 × Vestas V80-2MW 2002 272 million10-2018 Vattenfall 60%
Ørsted 40%
[w 16][1][17][2][18][19][20]
Horns Rev II Denmark 55°35′54″N 7°34′34″E 209 91 × Siemens SWP-2.3-93 2009470 million9-1732 Ørsted [w 17][21][19]
Horns Rev III Denmark 55°41′49″N 7°40′09″E 406.7 49 x MHIVestas V164-8.3MW 2019 10-20 30 Vattenfall [w 18][22][23][24][25]
Humber Gateway United Kingdom 53°38′38″N 0°17′35″E 219 73 × Vestas V112-3.0 2015 €900 million10-1810 E.ON [w 19]
Hywind Norway 59°08′24″N 05°01′55″E 2.3 1 × Siemens SWP-2.3-82 2009NOK 400 million22010 Equinor [w 20][1][26]
Hywind Scotland United Kingdom 57°29′N 01°21′W 30 5 × Siemens SWP-6.0-154 2017NOK2 billion (£152m)29 Equinor (75%)
Masdar (25%)
[w 21][1][26]
Hywind Tampen Norway 61°19′47.9″N 2°42′0″E 88 11 × Siemens SG 8.0-167 DD 2023 NOK 7.5 billion 260-300 140 Equinor [27][28][29]
Kaskasi Germany 54°29′00″N 7°41′00″E 342 38 × Siemens Gamesa SG 8.0-167DD 2022
Kentish Flats United Kingdom 51°27′36″N 01°05′24″E 90 30 × Vestas V90-3.0MW 2005£121.5 million3-510 Vattenfall [w 22][1][6][7][30]p69
Lincs United Kingdom 53°11′0″N 0°29′0″E 270 75 × Siemens SWT-3.6-120 2013£1,000 million10-158 Centrica, Siemens, Ørsted [w 23][6][31][32][33]
London Array United Kingdom 51°38′38″N 1°33′13″E 630 175 × Siemens SWT-3.6 2013 £1,800 million0-2520 Ørsted, E.ON UK Renewables, Masdar [w 24]
Lynn and Inner Dowsing United Kingdom 53°07′39″N 0°26′10″E 194 54 × Siemens SWP-3.6-107 2009£300 million6-115 Centrica 50%
TCW 50%
[w 25][6][34][35][7]p119
Meerwind Süd/Ost Germany 54°23′N 7°41′E 288 80 × Siemens SWT-3.6-120 2014 €1,300 million22-2653 WindMW GmbH. [w 26][36]
Merkur Germany 54°02′N 6°33′E 396 66 × GE Haliade 150-6MW 2019
Nobelwind Belgium 51°31′41″N 3°01′55″E 165 50 × Vestas V112-3.3 MW 2017
Nordergründe Germany 53°50′06″N 8°10′05″E 110.7 18 × Senvion 6.2M126 2017
Nordsee One Germany 53°58′44″N 6°48′50″E 332.1 54 × Senvion 6.2M126 2017
Nordsee Ost Germany 54°26′N 7°41′E 295 48 × Senvion 6.2M126 2015 2555 RWE Innogy [w 27]
Norther Belgium 51°31′41″N 3°01′55″E 369.6 44 × Vestas V164-8.4 MW 2019 Elicio [w 28]
Northwester 2 Belgium 51°41′15″N 2°44′56″E 219 23 × Vestas V164-9.5 MW 2020 [w 29]
Northwind Belgium 51°37′00″N 2°54′00″E 216 72 × Vestas V90-3.0 2014 €850 million16-2937 Parkwind [w 30][37]
Princess Amalia Netherlands 52°35′22″N 4°12′23″E 120 60 × Vestas V80-2MW 2008 350 million19-2426 Eneco Energie [w 31][38][39]
Rentel Belgium 51°35′28″N 2°56′38″E 309 42 × 7.35 MW 2020 [w 32]
Riffgat Germany 53°41′N 6°29′E 113 30 × Siemens SWT-3.6-120 2014 480 million16-2415-42 ENOVA, EWE [w 33][40][41]
Sandbank Germany 55°11′N 6°51′E 288 72 × Siemens SWT-4.0-130 2017 €1.2 billion24-3490 Vattenfall [w 34]
Scroby Sands United Kingdom 52°38′0″N 1°47′0″E 60 30 × Vestas V80-2MW 2004£75.5m0-82.5 E.ON [w 35][1][42][6][43][7]p53
Mermaid Belgium 51°43′12″N 2°44′09″E 235.2 28 × Siemens SWP-8.4 MW 2020
Seastar Belgium 51°38′00″N 2°51′36″E 168 20 × Siemens SWP-8.4 MW 2020 [w 36][44]
Sheringham Shoal United Kingdom 53°07′0″N 1°08′0″E 317 88 × Siemens SWT-3.6-107 2012£1,100 million12-2417 Equinor 50%
Statkraft 50%
[w 37]
Teesside United Kingdom 54°38′50″N 1°05′40″W 62 27 × Siemens SWT-2.3 2013 £200 million7-151.5 EDF-EN
Thanet United Kingdom 51°26′0″N 1°38′0″E 300 100 × Vestas V90-3.0MW 2010£780-900 million20-2511 Vattenfall [w 38][45][6][46][47]
Thorntonbank Belgium 51°33′06″N 2°58′01″E 325.2 6 × REpower 5M,
48 × Senvion 6M
20131,100 million13-1927 C-Power [w 39][1][48]
Trianel Windpark Borkum (phase 1) Germany 54°2′30″N 6°28′0″E 200 40 × Areva M5000-116 2015 €900 million28-3345 Trianel [w 40]
Veja Mate Germany 54°N 6°E 402 67 × Siemens SWT-6.0-154 2017 €1.9 billion4195 Highland Group Holdings Ltd, Siemens Financial Services, Copenhagen Infrastructure Partners [49]
Westermost Rough United Kingdom 53°48′18″N 0°08′56″E 210 35 × Siemens SWT-6.0 2015 €1,000 million10-258 Ørsted [w 41]
  • "Cap." is the rated nameplate capacity of the wind farm
  • "Commissioned" is the year when the windfarm was or will be commissioned and put into service.
  • "Cost" is the total capital cost of the project up to commissioning.
  • "km to shore" is the average distance of the windfarm to shore, or (where available) the distance from the in-farm transformer/substation to the shore
  • "Depth range (m)" is the range of minimum to maximum depths of water that the windfarm is sited in
  • "Refs" cite the source references for the information. The [w ...] footnotes link to each windfarm's own home page
Close

Map

Locations of offshore wind farms in the North Sea

See also

Windfarm home pages

  1. "Belwind". Archived from the original on 2015-07-22. Retrieved 2015-07-22.
  2. "Blyth". Archived from the original on 2013-01-27. Retrieved 2013-02-28.
  3. "Offshore wind farm Butendiek". Archived from the original on 2015-02-10. Retrieved 2015-02-10.
  4. "Hywind". Archived from the original on 2009-11-07. Retrieved 2010-10-28.
  5. "Hywind". Archived from the original on 2009-11-07. Retrieved 2010-10-28.
  6. "Thanet". Archived from the original on 2010-05-28. Retrieved 2010-10-28.
  7. "Lynn and Inner Dowsing". Archived from the original on 2014-03-04. Retrieved 2010-10-28.
  8. "Princess Amalia (Q7)". Archived from the original on 2011-02-09. Retrieved 2010-10-28.
  9. Foxwell, David (2019-09-11). "Royal visit sees Belgian power hub inaugurated". Riviera Maritime Media.
  10. "Sandbank offshore wind farm". Archived from the original on 2015-07-22. Retrieved 2015-07-22.
  11. Durakovic, Adnan (20 October 2021). "Belgium's Largest Offshore Wind Farm Officially Inaugurated". Offshore Wind. Archived from the original on 1 November 2021.
  12. "Thanet". Archived from the original on 2010-05-28. Retrieved 2010-10-28.

References

Related Articles

Wikiwand AI