Portside Tower

High rise building in Cape Town From Wikipedia, the free encyclopedia

Portside is a 139-metre-tall (456 ft) building in Cape Town, South Africa. Completed in 2014, it is the city's tallest building[3] and, at the time of completion, was Cape Town's first significant skyscraper developed in the city's central business district (CBD) in 15 years.[4]

TypeCommercial
Location5 Buitengracht Street, CBD, Cape Town, South Africa
Coordinates33°55′00″S 18°25′19″E
Completed2014
Quick facts General information, Type ...
Portside Tower
Portside Tower in 2018
Interactive map of the Portside Tower area
General information
TypeCommercial
Location5 Buitengracht Street, CBD, Cape Town, South Africa
Coordinates33°55′00″S 18°25′19″E
Completed2014
CostR1.6 Billion (estimated)[1]
OwnerAccelerate Property Fund and First Rand
LandlordBaker Street Properties
Height
Height139 metres (456 ft)
Technical details
Floor count32[2]
Floor areaover 52,000 m2[2]
Design and construction
Architecture firmdhk Architects; Louis Karol Architects[2]
Civil engineerWSP Structures
Nadeson
Quantity surveyorAecom Davis Langdon
De Leeuw Group
Main contractorMurray & Roberts
Awards and prizesTallest Green Building in South Africa
Website
www.portsidecapetown.com
Close

The property is jointly owned by FirstRand Bank (FNB, RMB, Wesbank and Ashburton) and Accelerate Property Fund (APF). The bank self-occupies its share of the property, while AcPF leases office and retail space to tenants. AcPF appointed the Cape Town commercial brokerage firm Baker Street Properties[5] to manage and market the property.

The Green Building Council of South Africa (GBCSA) awarded the property a 5 star Green Star rating,[6] making it the tallest Green Building in South Africa.

Conception

Portside Tower with Table Mountain in background

In 2008, it was initially proposed that the building would include a hotel and be 147.6 metres (484 ft) above sea level. However, due to the late-2000s recession and difficulties in securing a hotel management contact, the project was put on hold for almost three years and the design was altered.[7]

During the design and planning phase, and after extensive public participation, it was decided to keep the building below a certain height so as not to obscure the view of Table Mountain. The 32-storey tower[8] has over 51,500 square metres (554,000 sq ft) of office space with remaining space being used for over 1,382 parking bays[9] and retail outlets.

The building was designed to use low energy technology throughout and is the first large building in South Africa to use almost exclusively LED lighting. The building has been awarded a five star Green Star rating from the Green Building Council of South Africa as compliant technologies have been specified throughout.[10]

The South African architecture studio dhk Architects; Louis Karol Architects designed the building.[11]

Construction

The Portside Tower under construction in June 2012. The photograph is taken from the south facing side of the building.

Construction work on the tower began on 12 August 2011.[7] In late March 2013, construction was temporarily halted by the City of Cape Town's disaster response unit due to strong gale-force winds making the scaffolding unstable.[9]

References

Related Articles

Wikiwand AI