Somerset Mall (South Africa)

From Wikipedia, the free encyclopedia

StatusOpen (under renovation)
Coordinates34°04′57″S 18°49′24″E / 34.082619°S 18.823421°E / -34.082619; 18.823421
Somerset Mall
Interactive map of the Somerset Mall area
General information
StatusOpen (under renovation)
TypeShopping mall
LocationSomerset West, South Africa
Coordinates34°04′57″S 18°49′24″E / 34.082619°S 18.823421°E / -34.082619; 18.823421
Current tenantsWoolworths
Checkers
Pick n Pay, and others
OpenedNovember 1993; 32 years ago (1993-11)
Renovated2025 through 2026[1]
Renovation costR350 million[1]
OwnerHyprop Investments[2]
Height
RoofFlat
Technical details
Floor count1
Floor area69,001 m2 (742,720 sq ft)[3]
Other information
Number of stores206[4]
Parking~ 4,000 bays
Website
somersetmall.co.za
Inside Somerset Mall before the building's 2025 renovations

Somerset Mall is a 69,000 m2 (740,000 sq ft) shopping mall in Somerset West, Cape Town. It is a major shopping destination within the Helderberg area.

The mall is located in a mid-to-upper-income catchment area, and attracts around 10 million local and international visitors per year.[5][6]

Somerset West was opened in November 1993.[7]

In 2025, the mall underwent major renovations, at a cost of R350 million. The revamp added 26 new stores, and approximately 5,500 sqm of retail space.[1]

Somerset Mall's GM, Nicholas Oliphant, stated that the revamp would contribute meaningfully to local economic development. The construction during renovations supported around 1,200 jobs, and the new retail space is expected to support around 400 jobs on an ongoing basis.[5]

The renovations brought the first Lego, Skechers, Anta Sports, Bella Luna, New Balance, Old School, Colourbox, and Bootlegger stores to the Helderberg area, as well as the first Napapijri to the Western Cape, and the first Safari Collection to South Africa.[1][5]

Phase 1 of the renovations is set to open in late 2025, while Phase 2 (including entertainment area Freedom Interactive Park) will open in July 2026. An "art mile" featuring sculptures by Marco Olivier will also be added as part of the renovations.[1]

The mall's upgrade also brought ticketless parking, extended operating hours, and EV charging.[8]

Phase 1 of the redevelopment finished on 3 December 2025.[4]

Location

Operations

References

Related Articles

Wikiwand AI