Talk:Spadina subway line
From Wikipedia, the free encyclopedia
| This is the talk page for discussing improvements to the Spadina subway line article. This is not a forum for general discussion of the subject of the article. |
Article policies
|
| Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
| Spadina subway line has been listed as one of the Engineering and technology good articles under the good article criteria. If you can improve it further, please do so. If it no longer meets these criteria, you can reassess it. | ||||||||||
| ||||||||||
A fact from this article appeared on Wikipedia's Main Page in the "Did you know?" column on May 17, 2026. The text of the entry was: Did you know ... that a test of the Spadina subway line took 3.5 hours and used a diesel locomotive because electrical workers were on strike? | ||||||||||
| This article is rated GA-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||
Did you know nomination
- The following is an archived discussion of the DYK nomination of the article below. Please do not modify this page. Subsequent comments should be made on the appropriate discussion page (such as this nomination's talk page, the article's talk page or Wikipedia talk:Did you know), unless there is consensus to re-open the discussion at this page. Track your hook after promotion. No further edits should be made to this page.
The result was: promoted by Crisco 1492 (talk) 02:24, 9 May 2026 (UTC)
- ... that the Spadina subway line was originally not supposed to run along Spadina Road? Source: Best, Michael (November 18, 1961). "Story behind the subway 'blunder': Now It's the $22 Million Question". Toronto Daily Star. Torstar. p. 8.
- Relevant quote: "Now enter Toronto's third subway--the proposed "Spadina" line...Most of the drawings called for it to run north and south in the vicinity of Christie St."
- ALT1: ... that Metropolitan Toronto was sent 130 briefs supporting a route for the Spadina subway line because they believed it could revive a recently-cancelled expressway? Source: MacKenzie, James (March 20, 1972). "Public confused over Spadina subway plans". The Globe and Mail. p. 5.
- Relevant quote: "Of the 154 briefs...more than 130 support revival of the Spadina...While many letters say that choosing the old proposed expressway-ravine alignment for the new subway could allow for construction of the expressway later, others assume the expressway is going to be built if that alignment is chosen"
- ALT2: ... that a test of the Spadina subway line took 3.5 hours and used a diesel locomotive because electrical workers were on strike? Source: Mironowicz, Margaret (July 30, 1977). "Spadina line: Test of subway is slow going". The Globe and Mail. p. 5.
- Relevant quote: "the 3 1/2-hour ridge along six miles of the still-unfinished subway...There was no electricity yet because the electricians have been on strike for five weeks. So it was a grubby endurance test yesterday aboard a pair of lonely, dimly lit subway cars-pulled by 500 horses of diesel locomotive"
~UN6892 tc 18:40, 4 April 2026 (UTC).
- Hey @Jasper Deng:, I've changed the source on ALT0 and expanded the extensions section to four paragraphs. Quotes have been provided. ~UN6892 tc 05:40, 5 April 2026 (UTC)
| General: Article is new enough and long enough |
|---|
Policy compliance:
- Adequate sourcing:

- Neutral:
- n - Free of copyright violations, plagiarism, and close paraphrasing:

- Other problems:
- Coverage on the extensions is not in sufficient proportion to the rest of the article, at only two paragraphs. This shouldn't be too hard to fix though.
Hook eligibility:
- Cited:
- n - Interesting:

- Other problems:
- Sources are not available online, and therefore require quotes to be supplied. This applies to all three hooks.
| QPQ: Done. |
Overall:
Almost there, but a few minor things need to be addressed. Jasper Deng (talk) 02:27, 5 April 2026 (UTC)
I prefer either ALT0 or ALT2 since ALT1 is rather wordy and it's a bit confusing.--Jasper Deng (talk) 07:13, 5 April 2026 (UTC)
GA review
The following discussion is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.
- This review is transcluded from Talk:Spadina subway line/GA1. The edit link for this section can be used to add comments to the review.
Nominator: Username6892 (talk · contribs) 18:40, 4 April 2026 (UTC)
Reviewer: LachlanTansey (talk · contribs) 22:06, 26 June 2026 (UTC)
The article is well written and there isn't any noticeable WP:OR. The article adequately dives into the planning, history, opening and later developments on the line with verifiable citations.
From what I see, there is no copyright or plagiarism in the article with the article overall meeting Wikipedia:Good article criteria.
My main issue is that this article relies too heavily on secondary sources such as news snippets with very minimal primary sources used.
Overall however, I think that this article is fine enough as is and will be just fine under GA. Therefore, I close this review.


