Telangana Super Thermal Power Project
From Wikipedia, the free encyclopedia
| Telangana Super Thermal Power Project | |
|---|---|
Far view of NTPC Power Plant | |
![]() Location of the Telangana Super Thermal Power Project | |
| Official name | TSTPP |
| Country | India |
| Location | Telangana |
| Coordinates | 18°45′18″N 79°28′37″E / 18.75500°N 79.47694°E |
| Status | Under construction |
| Construction began | 29 Jan 2016 |
| Commission date | Unit 1: 3 October 2023[1] |
| Construction cost | 10598.98 Crores |
| Operator | NTPC |
| Thermal power station | |
| Primary fuel | Coal |
| Power generation | |
| Nameplate capacity |
|
Telangana Super Thermal Power Project(TSTPP) is in Telangana, India. The power plant is under construction with power capacity of 1600 MW (2×800 MW) in first phase and in total planned capacity of 4000 MW.[2] It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District.[3] The first Unit, 800 MW, was inaugurated by PM Modi on 3 October 2023.[4][5] The second unit was inaugurated by PM Modi on 4 March 2024.[6]