Three60, Manchester

Residential skyscraper in Manchester, England From Wikipedia, the free encyclopedia

Three60 is a cylindrical residential skyscraper on Crown Street in Manchester, England. The building is part of the second phase of the Crown Street development area at the southern end of Deansgate in the city centre, behind the Deansgate Square skyscraper cluster.[2] It was designed by SimpsonHaugh architects.[1][3] At 154 metres (506 ft), as of January 2026 the 51-storey tower is the sixth-tallest building in Greater Manchester, slightly taller than its sister tower The Blade.

Former namesThe Cylinder
Great Jackson Street Plot C5–6
TypeResidential skyscraper
LocationCrown Street, Manchester, England
Coordinates53.47151°N 2.25470°W / 53.47151; -2.25470
Quick facts Former names, General information ...
Three60
Cylindrical skyscraper
Three60 with Victoria Residence (right), March 2025
Three60, Manchester is located in Greater Manchester
Three60, Manchester
Location within Greater Manchester
Former namesThe Cylinder
Great Jackson Street Plot C5–6
General information
TypeResidential skyscraper
LocationCrown Street, Manchester, England
Coordinates53.47151°N 2.25470°W / 53.47151; -2.25470
Construction started2021
Completed2024
OwnerRenaker
Height
Height154 m (506 ft)
Technical details
Floor count51
Design and construction
ArchitectSimpsonHaugh[1]
DeveloperRenaker
Other information
Number of units441
Website
www.three60newjackson.com
Close

History

Planning

The planning application was submitted to Manchester City Council in April 2020 for two adjacent towers, The Cylinder (subsequently renamed Three60) and The Blade,[4] to form the second phase of developer Renaker's Crown Street development, consisting of a combined total of 855 apartments across 950,000 sq ft (88,000 m2) of residential space. Three60 was to contain 441 apartments.[5] The towers were designed to connect at the lower levels by a podium containing 5,200 sq ft (480 m2) of commercial space.[6]

Planning approval was obtained in July 2020.[7]

Construction

Three60 nearing completion in June 2023

Construction of the building commenced in 2021.[8] In March 2022, the Greater Manchester Combined Authority approved a £62.3 million loan to Renaker for the development project.[9][10] Three60 was expected to be completed by spring 2024,[11] and confirmation of its completion was announced in May of that year.[12]

The site of the two towers covers 2.7 acres (1.1 ha) and is next to Chester Road roundabout and the Mancunian Way.[6]

See also

References

Related Articles

Wikiwand AI