West Ipoh Span Expressway
From Wikipedia, the free encyclopedia
| West Ipoh Span Expressway | |
|---|---|
| Route information | |
| Maintained by Malaysian Highway Authority | |
| Existed | 2024–present |
| History | Will be completed in 2028 |
| Major junctions | |
| Southeast end | |
| Northeast end | |
| Location | |
| Country | Malaysia |
| Primary destinations | Gopeng, Kampar, Jerlun, Kuala Kangsar |
| Highway system | |
The West Ipoh Span Expressway (WISE) is a planned sixty-seven-kilometre (67 km) highway in the state of Perak, Malaysia, spanning from Gopeng to Kuala Kangsar.[1] The 67 km expressway, which will have three lanes in both directions, will start and pass through Gopeng, Siputeh, Manong, and end in Kuala Kangsar.[2] It's the solution of the traffic congestion in North-South Expressway particularly at the Menora Tunnel.[3]
It is expected to start construction at early June by Perak MB (Saarani Mohamad).[4]
Bertandang Rest Area
This rest area has a design that look like the Sungai Buloh OBR or the Ayer Keroh one, and it has a food court, petrol station, lounge, toilets and lots of parking.
Berlunjur Rest Area
It has the same facillties except it is dedicated to have a motel and an administration building.
