Wimco Nagar metro station

From Wikipedia, the free encyclopedia

LocationWimco Nagar, Tiruvottiyur, Chennai, Tamil Nadu 600019
Coordinates13°10′45″N 80°18′26″E / 13.17913°N 80.30719°E / 13.17913; 80.30719
System
Chennai Metro station

Wimco Nagar
General information
LocationWimco Nagar, Tiruvottiyur, Chennai, Tamil Nadu 600019
Coordinates13°10′45″N 80°18′26″E / 13.17913°N 80.30719°E / 13.17913; 80.30719
System
Chennai Metro station
Owned byChennai Metro
Operated byChennai Metro Rail Limited (CMRL)
LineBlue Line
PlatformsSide platform
Platform-1 → Chennai International Airport (to be extended to Kilambakkam in the future)
Platform-2 → Wimco Nagar Depot
Tracks2
Connections Wimco Nagar
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access[citation needed]
Other information
Station codeSWN
History
Opened14 February 2021; 4 years ago (2021-02-14)
ElectrifiedSingle-phase 25 kV, 50 Hz AC through overhead catenary
Services
Preceding station Logo of Chennai Metro Chennai Metro Following station
Wimco Nagar Depot
Terminus
Blue Line Tiruvottriyur
Blue Line
(Future Service)
Tiruvottriyur
towards Kilambakkam
Location

Wimco Nagar is an elevated metro station on the North-South Corridor of the Line 1 Extension of the Blue Line of Chennai Metro in Chennai, India. This station will serve the neighbourhoods of Wimco Nagar and other northern suburbs of Chennai. It is located in the neighbourhood of Tiruvottiyur, about 600 meters off the coast.

The station was inaugurated on 14 February 2021, with the inauguration of the northern extension of Blue line of Phase I.[1]

Station layout

Wimco Nagar track layout
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Chennai International Airport
Next Station: Tiruvottriyur
(to be further extended to Kilambakkam in the future)
Platform 2
Northbound
Towards ← Wimco Nagar Depot
Side platform | Doors will open on the left Disabled access
L2

Depot

With the inauguration of the northern extension of Blue line of Phase I, a depot was planned for the Wimco Nagar metro station.[1] In January 2022, the Chennai Metro Rail Corporation decided to build a new station named "Wimco Nagar Depot" at this depot, located about 500 meters from the station.[2]

Connectivity

See also

References

Related Articles

Wikiwand AI