Yellow Line is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It currently consists of a short operational section between Noapara and Jai Hind (Kolkata Airport) that was inaugurated on 22 August 2025.[3] The full line will be 16.876 km (10.486 mi) long with 10 stations,[1] running from Noapara to Barasat in North 24 Parganas. It is being built by RVNL, Senbo & ITD.[4] It will run mostly on underground tunnels, the track is elevated from Noapara to Jessore Road and then go underground towards Barasat. It has an interchange at the Kolkata Airport with Orange Line.

Status
  • Phase 1 - Operational
  • Phase 2 - Under Construction
  • Phase 3 - Planned
Quick facts Overview, Status ...
Yellow Line
A ICF Medha rake at Jai Hind metro station
Overview
Status
  • Phase 1 - Operational
  • Phase 2 - Under Construction
  • Phase 3 - Planned
OwnerIndian Railways
LocaleKolkata Metropolitan Region
Termini
Connecting lines
Stations10
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)
Rolling stock
History
Opened22 August 2025; 8 months ago (2025-08-22)
Technical
Line length16.876 km (10.486 mi)[1]
      • Operational: 7.04 km (4.37 mi)
      • Under Construction: 2.24 km (1.39 mi)
      • Planned: 7.596 km (4.720 mi)
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC third rail[2] using third rail
Operating speed80 km/h (designed)
SignallingCBTC signalling
Route map

Noapara
Kestopur Canal
Dum Dum Cantonment
Jessore Road
Jai Hind Netaji Subhas Chandra Bose International Airport Bus interchange
Airport Yard
Birati
Michael Nagar
New Barrackpur
Noai Canal
Madhyamgram
Hridaypur
Barasat Bus interchange
Close

History

Prime Minister Narendra Modi flagging off yellow line metro train on August 22, 2025

The first phase of the Yellow Line between Noapara and Jai Hind (Biman Bandar) station was inaugurated by the Prime Minister Narendra Modi on August 22, 2025.

Commercial Operations between Noapara and Jai Hind (Bimanbandar) began on 25 August 2025.

weekday operations would increase to 120 services comprising 60 UP and 60 DN trains with operating hours extended from 7.18 am to 9.30 pm, instead of the current 7.55 am to 8.17 pm.

The first train will now leave Noapara at 7.18 am for the airport, advancing by nearly 40 minutes, while the first service from the airport to Noapara will begin at 7.40 am instead of 8 am.

Similarly, the last train from Noapara to Jai Hind (Bimanbandar) will now depart at 9.58 pm instead of 8 pm, and the final service from the airport will leave at 9.18 pm, nearly an hour later than before.

Weekend travellers will also benefit from a substantial frequency upgrade. On Saturdays, the number of services will more than double to 92 trains (46 UP and 46 DN), operating between 7.18 am and 9.30 pm, while on Sundays, 78 services (39 UP and 39 DN) will run from 9.18 am to 9.30 pm.

Importantly, the interval between trains on weekends will be reduced to 18 minutes from the earlier 35 minutes, providing smoother and more convenient travel for passengers.

Stations

The stations of this corridor are:

More information No., Station Name ...
Yellow Line
No. Station Name Opening Connections Layout Platform Type
EnglishBengali
1Noaparaনোয়াপাড়া25 August 2025  Blue Line  Elevated Side & Island
2Dum Dum Cantonment দমদম ক্যান্টনমেন্ট Dum Dum Cantonment Side
3Jessore Road যশোহর রোড At grade
4Jai Hind জয় হিন্দ  Orange Line  (Under Construction)
Airport interchange Netaji Subhas Chandra Bose International Airport
Underground Side & Island
5Birati বিরাটিUnder construction Island
6Michael Nagar মাইকেল নগর
7New Barrackpurনিউ ব্যারাকপুর Approved TBD
8Madhyamgram মধ্যমগ্রাম Madhyamgram
9Hridaypurহৃদয়পুর Hridaypur
10Barasatবারাসত Barasat Junction
Close

Stations for newly proposed alignment

The stations of this corridor proposed according to the new alignment are:

More information No., Station Name ...
Yellow Line
No. Station Name Opening Connections Layout Platform Type
EnglishBengali
1Noaparaনোয়াপাড়া25 August 2025 Blue Line Elevated Side & Island
2Dum Dum Cantonment দমদম ক্যান্টনমেন্ট 25 August 2025 Elevated Side
3Jessore Road যশোহর রোড 25 August 2025 At grade Side
4Jai Hind জয় হিন্দ 25 August 2025 Orange Line (Under Construction)
Airport interchange Netaji Subhas Chandra Bose International Airport
Underground Side & Island
5Birati বিরাটি2027 Underground Island
6Michael Nagar মাইকেল নগর 2027 Underground Island
7Bidhanpallyবিধানপল্লী Proposed Underground Island
8Madhyamgram মধ্যমগ্রাম Proposed Underground Island
9Hridaypurহৃদয়পুর Proposed Underground Island
10Vidyasagar Stadiumবিদ্যাসাগর স্টেডিয়াম Proposed Underground Island
11Barasatবারাসত Proposed Underground Island
12Uttar Seethiউত্তর সিঁথি Proposed Underground Island
13Jaypurজয়পুর Proposed Underground Island
14Suripukurসুরি পুকুর Proposed Underground Island
Close


Project development

Biman Bandar railway station remants

Earlier, this line was planned to be divided into two lines: the up line and the down line. Both were meant to start from Noapara Metro Station and meet at Bimanbandar railway station. The up line was meant to run along with the Belghoria express and meant to have two new stations at Ramkrishna Pally and Shantinagar. The down line was meant to use Old Dum Dum Cantonment - Biman Bandar section's alignment, viaducts, and stations. However, the plan changed later, and now both lines will pass through the Dum Dum Cantonment - Bimanbandar section.[5]

The project will be completed in three phases. The first phase of work from Noapara to Jai Hind was opened on 22 August 2025.[6][7][8] In the second phase work from Jai Hind to New Barrackpore will be done and in the last phase from New Barrackpore to Barasat work will be done. But the development work from New Barrackpore to Barasat has been stalled for the last eight years since it was sanctioned because of encroachments.[9] and the Airport Authority of India objected to the elevated stretches from New Barrackpore to Barasat. Later, after objections from AAI, a decision was taken to convert this into an underground stretch. On 29 June 2019 sanction for material modification for underground construction at an additional cost of 1,615 crore (US$170 million) was sent to the Railway Board by Metro. For this underground tunneling, AAI has agreed to shift its fuel tanks, buildings, and cables, and the project is expected to start in 2020.[10]

Dum Dum Cantonment metro station

An amount of Rs 227 crore contract to build this station, along with a mostly at-grade 2.16 km (1.34 mi) section from the Bagjola Canal to the existing ramp of the Airport Circular Railway track was awarded to Senbo Engineering Limited back in June 2011. Since then, the station's civil structure has been built, but work on the at-grade track section could not be started due to land acquisition issues along the line's proposed alignment. But the rehabilitation work was completed in 2020, and the work is going smoothly. Recently, girders were placed over Eastern Railway tracks. The metro station is set to be operational by Mid-2025.[11][12] Construction of an underground integrated station for Orange Line and Yellow Line has begun at NSCBI Airport land just 150 metres (492 ft) away from the terminal building.

The development of New Barrackpore to Barasat was supposed to go elevated to cut down the expenses, but the stretch was in doubt due to a huge encroachment problem. But in February 2021, Prime Minister Narendra Modi gave his nod to construct this stretch underground, giving respite to thousands of families who were supposed to be evicted for the development of the elevated stretch.[13] To lower the cost of the underground work, latest technology TBM will not be used, instead old technology of cut and cover method will be used for metro.[4]

However, in August 2025, before the inauguration of the Noapara–Biman Bandar section, it was reported that some changes in line alignment from Micheal Nagar to Barasat would be made which would be constructed underground using Tunnel boring machine that would lead to an increase in the total length of the line from 18 km to 22 km, adding three new stations beyond Barasat. These changes were made due to objections from AAI regarding the use of tall cranes and to avoid significant encroachment problems.[14][15]


Yellow Line has been divided into three phases.

  • Phase 1: Noapara - Jai Hind (Biman Bandar) (Operational)
  • Phase 2: Jai Hind (Biman Bandar) - Micheal Nagar (Under construction)
  • Phase 3: Micheal Nagar - Suripukur (Planned, construction will begin soon)