Hulimavu metro station

From Wikipedia, the free encyclopedia

LocationHulimavu gate, Bannerghatta Main road, Bengaluru, Karnataka 560076
Coordinates12°52′52″N 77°35′45″E / 12.88108°N 77.59579°E / 12.88108; 77.59579
System
Namma Metro station
Hulimavu
This metro station's final stages before Operations under Namma Metro's Pink Line as of April 2026
General information
LocationHulimavu gate, Bannerghatta Main road, Bengaluru, Karnataka 560076
Coordinates12°52′52″N 77°35′45″E / 12.88108°N 77.59579°E / 12.88108; 77.59579
System
Namma Metro station
Owned byBengaluru Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LinePink Line
PlatformsSide platform
Platform-1 → Kalena Agrahara
Platform-2 → Tavarekere *
* (Further extension to Nagawara in the future)
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectGR Infraprojects Ltd. (Simplex contract terminated in 2021)
Other information
StatusFinal Stages before Operations
Station code(TBC)
History
OpeningMay 2026; 20 days' time (May 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
IIMB
towards Tavarekere
Pink Line
(Operational from May 2026)
Kalena Agrahara
Terminus
IIMB
towards Nagawara
Pink Line
(Operational around December 2026)
Location

Hulimavu is an upcoming elevated metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station serves mainly the Christ University (Bannerghatta Road), and the nearby prime locations such as Royal Meenakshi Mall, Sri Meenakshi Sundareshwara Temple, Hulimavu Police Station and Kothanur Metro Depot, which will handle all the Pink Line train sets for maintenance purposes.

As per the latest updates, this metro station, under the first phase, covering a total distance of 7.5 km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around May 2026 [2][3][4][5] instead of December 2025.[6][7][8][9][10]

In March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the Hulimavu metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated.[11] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement.[12]

Station layout

Station Layout - To Be Confirmed [13]

Hulimavu track layout (TBC)
to IIMB
P#
P#
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara
Platform #
Northbound
Towards ← Tavarekere **
Next Station: IIMB
Side platform | Doors will open on the left Disabled access
L2 Note: ** To be further extended to Nagawara in the future