Pottery Town metro station

From Wikipedia, the free encyclopedia

LocationByadarahalli, Pottery Town, Benson Town, Bengaluru, Karnataka 560046
Coordinates13°00′02″N 77°36′34″E / 13.00049°N 77.60934°E / 13.00049; 77.60934
Operated byNamma Metro
Pottery Town
Namma Metro station
Under Construction of this metro station under Pink Line of Namma Metro as of January 2025
General information
LocationByadarahalli, Pottery Town, Benson Town, Bengaluru, Karnataka 560046
Coordinates13°00′02″N 77°36′34″E / 13.00049°N 77.60934°E / 13.00049; 77.60934
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line
PlatformsIsland platform (TBC)
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Bangalore East and Banaswadi
Construction
Structure typeUnderground, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectLarsen & Toubro
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2026; 16 months' time (December 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Tannery Road
towards Nagawara
Pink Line
(Operational around December 2026)
Cantonment Railway Station
Location

Pottery Town is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station will consist of the main Bangalore East and Banaswadi railway stations along with many prime locations like St. Anthony's Chapel, BBMP Regional Office (Pulikeshi Nagar) and surrounding suburban areas like Williams Town, Fraser Town, Cox Town and Richards Town.

As per the latest updates, this metro station, under the second phase, covering the total distance of 13.8 km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026. [2][3][4][5][6][7]

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Pottery Town metro station along the 2.88 km Shivaji Nagar - Shadi Mahal Ramp stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, Larsen & Toubro (L&T) emerged as the lowest bidders for this stretch which aligned closely with the original estimate, thus leading to successful award for this company. They commenced the construction of this metro station as per the agreements.

Station Layout

Station Layout - To Be Confirmed

Pottery Town track layout (TBC)'
P#
P#
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Kalena Agrahara
Next Station: Cantonment Railway Station
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Nagawara
Next Station: Tannery Road
L2

Connections

Entry/Exit

See also

References