Jayadeva Hospital metro station

From Wikipedia, the free encyclopedia

LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
System
Namma Metro station
Jayadeva Hospital
Station building view
General information
LocationJayadeva Junction, BHBCS Layout, BTM Layout Stage 2, Bengaluru, Karnataka 560076
Coordinates12°55′00″N 77°36′00″E / 12.916744°N 77.600117°E / 12.916744; 77.600117
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow Line Pink Line
Platforms  2 side platforms
  2 side platforms
Tracks4
Construction
Structure typeElevated
Platform levels4
AccessibleYes Disabled access
ArchitectHCC - URC Construction JV
Other information
Status  Operational and staffed
  Final Stages Before Operations
Station codeJDHP
History
Opened  10 August 2025; 7 months ago (10 August 2025)
Opening  May 2026; 24 days' time (May 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Ragigudda Yellow Line BTM Layout
Tavarekere
Terminus
Pink Line
(Operational around May 2026)
JP Nagar 4th Phase
Tavarekere
towards Nagawara
Pink Line
(Operational around December 2026)
Location

Jayadeva Hospital is a double-elevated interchange metro station on the north-south corridor of the Yellow Line and the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station is the first multi-elevated interchange station in the Namma Metro network. The station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase.

Yellow Line

Jayadeva flyover which was demolished to build the station

This metro station was built by demolishing the 15 year old Jayadeva flyover in 2020.[2]

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[3] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[4][5][6][7][8][9][10] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao. [11][12][13]

Pink Line

The elevated section of the Pink Line covering a distance of 7.5 km from Kalena Agrahara to Tavarekere is expected to be operational around March 2026,[14][15][16] after being delayed from December 2025.[17][18][19][20][21][22]

Passenger services

About OpenStreetMaps
Maps: terms of use
70m
76yds
A
Jayadeva Hospital
L
K
J
I
H
G
F
E
D
C
B
Jayadeva Hospital metro station Entry/Exits (A-L)

There are 12 Entry/Exit points – A to L, making the highest number of entry/exits points for this metro station under Namma Metro with wheelchair accessibility via lift at 'B','E','H', and 'K'. Escalator access is also available at 'A','D','G', and 'J'. Service road access is available on all sides except Jayadeva hospital side.

  • Entry/Exit points A to C: Towards Jayadeva Hospital/Jayanagar side
  • Entry/Exit points D to F: Towards BTM Layout 1st Stage side
  • Entry/Exit points G to I: Towards BTM Layout 2nd Stage side
  • Entry Exit points J to L: Towards JP Nagar 3rd Phase side

Station layout

This metro station currently consists of five levels from underground to the top level as given below:

  • Level 1 → Underpass connecting Bilekahalli and Dairy Circle (Bannerghatta Road)
  • Level 2 → Street Level road (Marenahalli / Outer Ring Road)
  • Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
  • Level 4 → Concourse (Mezzanine)
  • Level 5 → Yellow Line Platforms
  • Level 6 → Pink Line Platforms
Jayadeva Hospital track layout
P1 to Ragigudda
Station with two tracks and two side platforms
Jayadeva Hospital track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under construction
UG Underpass level Bilekahalli - Dairy Circle Underpass
G Street level Exit/Entrance
L1 Flyover Ragigudda - Silk Board Flyover
L2 Mezzanine Automatic Fare Collection gates, station agent, crossover
L3 Side platform | Doors will open on the left Disabled access
Platform 2
Eastbound
Towards → Delta Electronics Bommasandra
Next Station: BTM Layout
Platform 1
Westbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Ragigudda
Side platform | Doors will open on the left Disabled access
L4 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara
Next Station: JP Nagar 4th Phase
Change at the next station for Orange Line ** (U/C)
Platform #
Northbound
Towards ← Tavarekere **
Side platform | Doors will open on the left Disabled access
Pink Line Station Layout & Platform Numbers - (TBC)
L4 Note: ** To be further extended to Nagawara in the future

See also

References

Related Articles

Wikiwand AI