Jayadeva Hospital metro station
From Wikipedia, the free encyclopedia
Jayadeva Hospital is a double-elevated interchange metro station on the north-south corridor of the Yellow Line and the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station is the first multi-elevated interchange station in the Namma Metro network. The station is named after the Sri Jayadeva Institute of Cardiovascular Sciences and Research which is located nearby and serves MICO Layout (BTM), Gurappanapalya, Jayanagar and JP Nagar 3rd Phase.
Yellow Line
This metro station was built by demolishing the 15 year old Jayadeva flyover in 2020.[2]
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Jayadeva Hospital metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[3] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[4][5][6][7][8][9][10] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao. [11][12][13]
Pink Line
The elevated section of the Pink Line covering a distance of 7.5 km from Kalena Agrahara to Tavarekere is expected to be operational around March 2026,[14][15][16] after being delayed from December 2025.[17][18][19][20][21][22]
Passenger services
There are 12 Entry/Exit points – A to L, making the highest number of entry/exits points for this metro station under Namma Metro with wheelchair accessibility via lift at 'B','E','H', and 'K'. Escalator access is also available at 'A','D','G', and 'J'. Service road access is available on all sides except Jayadeva hospital side.
- Entry/Exit points A to C: Towards Jayadeva Hospital/Jayanagar side
- Entry/Exit points D to F: Towards BTM Layout 1st Stage side
- Entry/Exit points G to I: Towards BTM Layout 2nd Stage side
- Entry Exit points J to L: Towards JP Nagar 3rd Phase side
Station layout
- Miniature Model of this metro station during the Yellow Line inauguration at Ragigudda, Bengaluru (2025)
This metro station currently consists of five levels from underground to the top level as given below:
- Level 1 → Underpass connecting Bilekahalli and Dairy Circle (Bannerghatta Road)
- Level 2 → Street Level road (Marenahalli / Outer Ring Road)
- Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
- Level 4 → Concourse (Mezzanine)
- Level 5 → Yellow Line Platforms
- Level 6 → Pink Line Platforms
Jayadeva Hospital track layout | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||
Jayadeva Hospital track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** Under construction | ||||||||||||||||||||||||||||||||||||||||||
| UG | Underpass level | Bilekahalli - Dairy Circle Underpass |
| G | Street level | Exit/Entrance |
| L1 | Flyover | Ragigudda - Silk Board Flyover |
| L2 | Mezzanine | Automatic Fare Collection gates, station agent, crossover |
| L3 | Side platform | Doors will open on the left | |
| Platform 2 Eastbound |
Towards → Delta Electronics Bommasandra Next Station: BTM Layout | |
| Platform 1 Westbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Ragigudda | |
| Side platform | Doors will open on the left | ||
| L4 | Side platform | Doors will open on the left | |
| Platform # Southbound |
Towards → Kalena Agrahara Next Station: JP Nagar 4th Phase Change at the next station for Orange Line ** (U/C) | |
| Platform # Northbound |
Towards ← Tavarekere ** | |
| Side platform | Doors will open on the left Pink Line Station Layout & Platform Numbers - (TBC) | ||
| L4 | Note: | ** To be further extended to Nagawara in the future |

