Ipiranga station opened on 1 April 1886, to serve as a support structure to the project for the Ipiranga Museum. It was built between 1885 and 1890. After World War II, an industrial boom in the surrounding region increased the station's use. This industrial movement reached its highest point in the 1950s, with the arrival of the Ford Motor Co. factory in 1953, which rerouted railroads to reach its installations.[2] From the 1950s, thousands of workers used this station as their daily transport.
Estrada de Ferro Santos-Jundiaí set plans for construction of a new building to open in mid-1960. With the beginning of de-industrialization, Ipiranga station lost its importance as the old industries gave place to empty warehouses. This migration movement of industrial plants to other locations also reached the Ford factory, which closed in 2001, transferring the production to Camaçari, Bahia). Unlike other unoccupied factories and still active, Ford's factory was partially demolished, becoming a shopping mall.[3]
Since 1 June 1994, the station is operated by CPTM.
On 11 May 2005, the consortium composed of Maubertec and Herjack companies was hired by CPTM at the cost of 845,974 BRL (505,714.64 USD). With additives, the cost reached 888,036.85 BRL (530,859.39 USD) to rebuild stations Mooca, Ipiranga, Utinga and Prefeito Saladino.[4] On 29 March 2008, the projects were delivered. CPTM signed them up in the Growth Acceleration Program (PAC), contemplated in the pre-selection phase. With the 2014 economic crisis, many PAC financings were cancelled, including the reconstruction.[5]
The project of the Expresso Tiradentes BRT was to connect Ipiranga station with the train station; only part of the structure was implemented. It may be implemented along with the future Metro Line 15-Silver station.[6]
The São Paulo Metro planned the expansion of Line 15-Silver between Vila Prudente and Ipiranga, to become the line terminus. This project has no implementation date.[1] During the opening of stations Sapopemba, Fazenda da Juta and São Mateus, Alexandre Baldy, Secretary of Metropolitan Transports, stated that the state government is willing to announce the beginning of the construction of the monorail station in 2020.[7]
Another project is the planned expansion of Metro Line 5-Lilac from Chácara Klabin station towards Ipiranga. Funds are not allocated.[6]