Line 6 (Ningbo Rail Transit)
From Wikipedia, the free encyclopedia
StatusOperational
| Line 6 | |
|---|---|
| Overview | |
| Status | Operational |
| Owner | Ningbo Rail Transit Group Co.Ltd |
| Locale | Ningbo, Zhejiang, China |
| Termini | |
| Stations | 23 |
| Service | |
| Type | Rapid transit |
| System | Ningbo Rail Transit |
| Operator(s) | Ningbo Rail Transit Group Co.Ltd |
| Depot(s) | Gaoqiao South Depot[1], Xinmian Parking Lot[2] |
| Rolling stock | 37 Six cars type B train[3] |
| History | |
| Opened | 16 January 2026 |
| Technical | |
| Line length | 39.6 km (24.6 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Electrification | 1,500 V DC Overhead catenary |
| Operating speed | 100 km/h (62 mph) (Maximum design speed) |
The Line 6 of Ningbo Rail Transit (Chinese: 宁波轨道交通6号线) is a rapid transit line in Ningbo, Zhejiang. It starts from Gulin to Honglian with 23 stations in operation, spanning 39.6 km long. Construction started on 28 December 2022[4] with total investment is 31.53 billion RMB[5].
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Gulin — Honglian | 16 January 2026 | 39.6 km (24.61 mi) | 23 | Phase 1[6] |