One Medlock Street

High-rise building under construction in Manchester, England From Wikipedia, the free encyclopedia

One Medlock Street is a purpose-built student accommodation building under construction on Medlock Street in Manchester, England. The part 11-storey, part 38-storey building will contain 1,014 units and was designed by Jon Matthews Architects. Once completed in 2028, it will be 117 metres (384 ft) in height and the 17th-tallest building in Greater Manchester.

StatusUnder construction
TypePurpose-built student accommodation
LocationMedlock Street, Manchester, England
Construction started2025
Quick facts General information, Status ...
One Medlock Street
General information
StatusUnder construction
TypePurpose-built student accommodation
LocationMedlock Street, Manchester, England
Construction started2025
Estimated completion2028
OwnerGreystar
Height
Height117 m (384 ft)
Technical details
Floor count38
Design and construction
Architecture firmJon Matthews Architects[1]
Main contractorHG Construction[2]
Close

History

Planning

In September 2022, Whitbread and the developer Dominus published plans for the redevelopment of the site on Medlock Street which contained a 5-storey Premier Inn hotel and which sits within Manchester City Council's First Street Development Framework.[3]

A planning application for the demolition of the hotel and construction of two separate buildings: a 13-storey office with a ground-floor commercial unit covering 392,800 sq ft (36,490 m2), and a part 11-storey, part 38-storey building with 1,014 purpose-built student accommodation units, was submitted to the council in November 2022.[4]

In June 2023, approval was recommended by the council's planning committee, with the decision being formally issued for the project in November 2023.[4][5] In July 2024, it was reported that Student Roost, which was bought by Greystar in 2022, had acquired the former Premier Inn site and the student housing part of the scheme from Whitbread, but not the office building.[6]

Construction

Greystar and its main contractor HG Construction received final approval to commence work in May 2025 and the development is expected to be operational in 2028.[7]

Amenities

One Medlock Street will include 13,000 square feet (1,200 m2) of amenities for residents, such as a gym, yoga studio, study areas, meeting rooms, screening rooms, shared lounges, and games rooms.[6]

See also

References

Related Articles

Wikiwand AI