Palaruvi Express

Train in India From Wikipedia, the free encyclopedia

The Palaruvi Express (Train number: 16791/16792) is a daily Intercity express train which runs between Tuticorin in Tamil Nadu and Palakkad Junction in Kerala via Tirunelveli Junction, Tenkasi Junction, Punalur, Kollam Junction, Tiruvalla and Kottayam.[4] The train first introduced between Punalur in Kollam and Palakkad.[5] On 9 July 2018, it was extended up to Tirunelveli Junction[6] and later on 15 August 2024 it was extended till Tuticorin.[7]

Service typeInter-city rail
StatusOperating
First service20 April 2017; 8 years ago (2017-04-20) (initial service between Palakkad Jn and Punalur)[1]
9 July 2018; 7 years ago (2018-07-09) (extended to Tirunelveli Junction)[2]
15 August 2024; 19 months ago (2024-08-15) (extended to Tuticorin)[3]
Quick facts Overview, Service type ...
Palaruvi Express
Palaruvi Express Signboard
Overview
Service typeInter-city rail
StatusOperating
LocaleKerala, Tamil Nadu
First service20 April 2017; 8 years ago (2017-04-20) (initial service between Palakkad Jn and Punalur)[1]
9 July 2018; 7 years ago (2018-07-09) (extended to Tirunelveli Junction)[2]
15 August 2024; 19 months ago (2024-08-15) (extended to Tuticorin)[3]
Current operatorIndian Railways
Route
TerminiTuticorin (TN)
Palakkad Junction (PGT)
Stops40
Distance travelled537 km (334 mi)
Average journey time14 hrs
Service frequencyDaily
Train number16791/16792
On-board services
Classes5 SL, 11 UR, 2 SLR
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesNo
Technical
Rolling stockWAP-4
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV AC 50 Hz
Operating speed35 km/h (22 mph)
Rake maintenanceTuticorin
Close

Background

The train was introduced on 19 April 2017,[8] providing better connectivity to the Eastern Kollam region with Central Kerala and as a relief for daily commuters, especially office-goers who have been relying on Venad Express.[9][10][11][12]

On 29 May 2022 it became the first train to pass through the doubled track between Ettumanoor-Kottayam-Chingavanam section which made the Thiruvananthapuram-Kottayam-Ernakulam-Mangaluru section completely doubled electrified line.

On 2024 July 28, the Palaruvi Express from Tirunelveli to Palakkad was the first electric train that passed through the recently electrified Sengottai - Kollam railway line.

Route

The service runs from Tuticorin(16791) every night and reaches Palakkad Junction the following afternoon. Prominent stoppages include Tirunelveli Junction, Tenkasi Junction, Punalur,Kundara, Kollam Junction ,[a] Kayamkulam Junction, Tiruvalla, Kottayam, Ernakulam Town and Thrissur. On the return journey, the train leaves every evening, traverses the same route and reaches Tuticorin, next morning.[13]

The train reverses its direction at Kollam.

Coach composition

The train has eighteen coaches comprising five sleeper coaches, eleven unreserved general coaches and two luggage rakes.[14][b]

More information Loco ...
Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SLRGENGENGENGENGENS1S2 S4S5GENGENGEN GEN GEN GENSLR
Close

Since its introduction in April 2017, the train was running without even a single reservation compartment till September 2019. The train started 4 reservation sleeper compartments.

Palaruvii Express at Ernakulam Town


Palaruvi Express at Kottayam


WAP-4 pulling the Palaruvi Express


Train at Palakkad Junction


See also

Notes

  1. The service reverses its rakes to continue the journey.
  2. The coach composition is subject to change.

References

Related Articles

Wikiwand AI