Sembung railway station

From Wikipedia, the free encyclopedia

Location Jombang–Kertosono Road
Sembung, Perak, Jombang Regency
East Java
Indonesia
Coordinates7°34′58″S 112°10′2″E / 7.58278°S 112.16722°E / -7.58278; 112.16722
Elevation+47 m (154 ft)
Sembung Station

Stasiun Sembung
Kereta Api Indonesia
Sembung railway station's new building, 2019
General information
Location Jombang–Kertosono Road
Sembung, Perak, Jombang Regency
East Java
Indonesia
Coordinates7°34′58″S 112°10′2″E / 7.58278°S 112.16722°E / -7.58278; 112.16722
Elevation+47 m (154 ft)
Operated byKereta Api Indonesia
LineKereta Api Indonesia Kertosono–Wonokromo
Platforms1 side platform
2 island platforms
Tracks4
Construction
Structure typeGround
ParkingAvailable
AccessibleAvailable
Other information
Station codeSMB
ClassificationThird-class station
History
Rebuilt30 October 2019 (2019-10-30)
Services
Preceding station Following station
Jombang
One-way operation
Commuter Line Dhoho
East Java Circular line
Via Kertosono-Blitar-Malang counterclockwise
Kertosono
Commuter Line Dhoho
Surabaya Kota-Malang via Kertosono-Blitar counterclockwise
Kertosono
towards Malang
Commuter Line Dhoho
Surabaya Kota-Blitar via Kertosono counterclockwise
Kertosono
towards Blitar
Commuter Line Dhoho
Surabaya Kota-Kertosono counterclockwise
Kertosono
Terminus
Kertosono
One-way operation
Commuter Line Penataran
East Java Circular line
Via Malang-Blitar-Kertosono clockwise
Jombang
Commuter Line Penataran
Malang-Surabaya Kota via Blitar-Kertosono clockwise
Jombang
Commuter Line Penataran
Blitar-Surabaya Kota via Kertosono clockwise
Commuter Line Penataran
Kertosono-Surabaya Kota clockwise
Location
Sembung Station is located in Java
Sembung Station
Sembung Station
Location in Java

Sembung Station (Indonesian: Stasiun Sembung, station code: SMB) is a third-class railway station in Sembung, Perak, Jombang Regency, East Java, Indonesia, operated by Kereta Api Indonesia.[1] This railway station is at the most western railway station in Jombang Regency. This station is located Jalan Raya Sembung, 100 m south of Jombang–Kertosono Road. This station's new building is operated—which has four tracks (two main lines and two passing tracks)—since JombangBaron double track segment activation on 30 October 2019.[2]

References

Related Articles

Wikiwand AI