Zhengzhou BRT Route B1
From Wikipedia, the free encyclopedia
Yutong ZK6125CHEVNPG4
Yutong ZK6180CHEVNPG3
| B1 | |||
|---|---|---|---|
| Overview | |||
| System | Zhengzhou BRT | ||
| Operator | Zhengzhou Bus Communication Corporation | ||
| Vehicle | Yutong U12 Yutong ZK6125CHEVNPG4 Yutong ZK6180CHEVNPG3 | ||
| Status | Operational | ||
| Began service | 2009 | ||
| Predecessors | Zhengzhou Bus Route 96 | ||
| Route | |||
| Locale | Zhengzhou | ||
| Start | Zhongzhou Avenue and Nongye Road | ||
| End | Dianchang Road B/T | ||
| Length | 26 km (16 mi) | ||
| Stops | 32 | ||
| Service | |||
| Level | Daily | ||
| Frequency | Every 2-5 minutes | ||
| Operates | 6:00 am – 9:30 pm | ||
| |||
Zhengzhou BRT Route B1 is a bus rapid transit route operated by Zhengzhou Bus. The route is the first ever route with dedicated bus lanes in Zhengzhou BRT.
The route was officially commenced on 28 May 2009, together with 8 other feeder routes. The route was initially a loop line running on Nongye Road, Zhongzhou Avenue, Weilai Road, Hanghai Road and Tongbai Road.[1]
Due to the construction of Zhengzhou Metro Line 5 on Hanghai Road and Tongbai Road and the construction of Nongye Expressway above Nongye Road, most platforms of the route on these three roads have been removed. Currently, services of the route on Nongye Road has been suspended.
Route

The route is U-shaped, running on Zhongzhou Avenue, Weilai Road, Hanghai Road, Tongbai Road, Wulongkou S. Road and Dianchang Road, with the eastern terminus at Zhongzhou Avenue and Nongye Road and the western terminus at Dianchang Road B/T.