Changzhou station (Guangzhou Metro)

From Wikipedia, the free encyclopedia

Hanyu PinyinChángzhōu Zhàn
Hanyu PinyinChángzhōu Zhàn
Changzhou

长洲
Guangzhou Metro
Platform with decorative art installations
Chinese name
Simplified Chinese长洲站
Traditional Chinese長洲站
Transcriptions
Standard Mandarin
Hanyu PinyinChángzhōu Zhàn
Yue: Cantonese
Yale RomanizationChèuhng Jāu Jaahm
JyutpingCoeng4zau1 Zaam6
General information
LocationIntersection of Jinzhou North Road (金洲北路) and Jindie Road (金蝶路), Changzhou Island, Changzhou Subdistrict
Huangpu District, Guangzhou, Guangdong
China
Coordinates23°4′42.71″N 113°25′25.75″E / 23.0785306°N 113.4238194°E / 23.0785306; 113.4238194
Operated byGuangzhou Metro Co. Ltd.
Line     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code711
History
Opened28 December 2023 (2 years ago) (2023-12-28)
Services
Preceding station Guangzhou Metro Following station
Shenjing
towards Meidi Dadao
Line 7 Yufengwei
towards Yanshan
Future services
Shenjing
towards Meidi Dadao
Line 7 Hongshengsha
towards Yanshan
Location

Changzhou Station (simplified Chinese: 长洲站; traditional Chinese: 長洲站; pinyin: Chángzhōu Zhàn; Cantonese Yale: Chèuhng Jāu Jaahm) is a station of Guangzhou Metro Line 7, located underground at the intersection Jinzhou North Road with Jindie Road on Changzhou Island in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

The station has a reserved interchange interface and platform with Line 8, which is planned to have a stop here.[3][4]

Concourse

This station is one of the two cultural theme stations of the second phase of Line 7, the station is designed with the theme "Huangpu Spirit", and the whole station is made of golden stone to show the cultural heritage of Changzhou Island.[5]

Station layout

G Street level Exits B, C, E
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Shenjing)
Island platform, doors will open on the left (Toilets, Nursery)
Platform 1  7  towards Yanshan (Yufengwei) arrow for R
L3
Reserved Platforms
 8  reserved track area
Reserved Island platform
 8  reserved track area

Entrances/exits

The station has 3 points of entry/exit, with Exit B being accessible via elevator.[1]

History

On 31 August 2020, the main structure of the first phase of this site was topped out.[6] The station completed the "three powers" transfer in October 2023.[7] At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]

Future development

References

Related Articles

Wikiwand AI