Line 3 (Guangzhou Metro)

Line of the Guangzhou Metro From Wikipedia, the free encyclopedia

Line 3 of the Guangzhou Metro is a 74.83-kilometer (46.50 mi) rapid transit line that connects Haibang to Airport North (Terminal 2). The entire line, including all track and stations, is located in tunnels.[4] Its 67.33 km (41.84 mi) main branch, excluding the 7.5 km (4.66 mi) branch between Tianhe Coach Terminal and Tiyu Xilu is now the second longest continuous subway tunnel in the world, and the longest rail tunnel of any kind (surpassing the Gotthard Base Tunnel in Switzerland).

Other namesM3 (5 lines plan name)
M6 (7 lines plan name)
M3 (2000 plan name)
Southern-Northern express line (南北快线)
Shiqiao line (市桥线)
Airport line (机场线)
StatusOperational
Quick facts Overview, Other names ...
Line 3
Platform of Tiyu Xilu
Overview
Other namesM3 (5 lines plan name)
M6 (7 lines plan name)
M3 (2000 plan name)
Southern-Northern express line (南北快线)
Shiqiao line (市桥线)
Airport line (机场线)
StatusOperational
OwnerCity of Guangzhou
LocalePanyu, Haizhu, Tianhe, Baiyun, and Huadu districts
Guangzhou, Guangdong
Termini
Stations34
Service
TypeRapid transit
SystemGuangzhou Metro Guangzhou Metro
Services2
Operator(s)Guangzhou Metro Corporation
Rolling stock120 Siemens Mobility-CRRC Zhuzhou Locomotive Modular Metro cars[1]
Daily ridership1.318 million (Main Line), 871,400 (Airport Branch) (2019 Avg.)[2]
2.759 million (2019 Main and Airport combined Peak)[3]
History
Opened26 December 2005; 20 years ago (2005-12-26)
Technical
Line length74.83 km (46.50 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines, 1,500 V DC
Operating speed120 km/h (75 mph)
Route map

Airport North (Terminal 2)
Airport South (Terminal 1)
 9  Left arrow to Fei'eling
Gaozeng
 9 
connection to Line 9
Renhe
Liuxi River
Longgui
Jiahe Depot
Jiahewanggang
 2   14 
 14  Down arrow to Lejia Road
Baiyundadaobei
Yongtai
Tonghe
Jingxi Nanfang Hospital
Meihuayuan
 6  Right arrow to Xiangxue
Tianhe Coach Terminal
Bus interchange
 6 
Yantang
 6 
 6  Left arrow to Xunfenggang
branch line (Future  10 )
South China Normal University
 11 
 11  Right arrow Inner Circle
Gangding
Shipaiqiao
Guangzhou East Railway Station
China Railway  1   11 
 11  Left arrow Outer Circle
Linhexi
 APM 
Tiyu Xilu
 1 
 1  Left arrow to Xilang
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Zhujiang New Town
 5 
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
Canton Tower
Tram interchange  APM 
Chigang Pagoda Yard
Kecun
 8 
Datang
 11 
 11 
Left arrow Inner Circle
Outer Circle Right arrow
Lijiao
Xiajiao Depot
Xiajiao
Sanzhixiang Creek
Dashi
original Line 7
alignment
Hanxi Changlong
 7 
Shiqiao
Panyu Square
 18   22 
Bangjiang
Yanzhou Yard
Shiqinan
Haichong Lu
Haibang
 4 
Close
SimplifiedChinese广州地铁3号线
TraditionalChinese廣州地鐵3號線
Hanyu PinyinGuǎngzhōu Dìtiě Sān Hào Xiàn
Hanyu PinyinGuǎngzhōu Dìtiě Sān Hào Xiàn
Quick facts Simplified Chinese, Traditional Chinese ...
Line 3
Simplified Chinese广州地铁3号线
Traditional Chinese廣州地鐵3號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Sān Hào Xiàn
Yue: Cantonese
Jyutpinggwong2zau1 dei6tit3 saam1 hou6 sin3
Shiqiao line
Simplified Chinese市桥线
Traditional Chinese市橋線
Transcriptions
Standard Mandarin
Hanyu PinyinShìqiáo Xiàn
Yue: Cantonese
Jyutpingsi5kiu4 sin3
Airport line
Simplified Chinese机场线
Traditional Chinese機場線
Transcriptions
Standard Mandarin
Hanyu PinyinJīchǎng Xiàn
Yue: Cantonese
Jyutpinggei1coeng4 sin3
Close

Line 3 is split into two sections, Shiqiao line (main line, from Haibang to Tianhe Coach Terminal) and Airport line (northern branch, Tiyu Xilu to Airport North), and are branded with the colour orange. The line is extremely congested, with numerous sections officially operating over 100% capacity.[5] The line uses Seltrac S40 communications-based train control from Alcatel.[6]

Line 3 drawn to scale.

History

Initial section

Line 3 started out as a short peripheral line in Guangzhou's "Five-Line" subway masterplan in the early 1990s. It was envisioned as a north south circulator line for the Tianhe District's new CBD connecting Guangzhou East railway station with the proposed Zhujiang New Town CBD, crossing the Pearl River to Chigang station on what was then Line 2 and turning east to Xinzhou.[7] Essentially taking over the section of Today's Line 8 between Chigang and Wanshengwei stations. However at the time it was planned to run under Liede Avenue just east of the new CBD instead of under Xiyu West Road like it does today.[7] In Guangzhou's updated "Seven-Line" subway masterplan published in the late 1990s the proposed Line 3 plan was extended north to arc over old Guangzhou terminating around Chatou Station on Line 12 and Line 13. Additionally the southern section of the line was rerouted southwest roughly following today's Line 12 between Chigang and Luntou,[7] with the section east to Xinzhou mostly being taken over by what is today Line 8.

Line 3 was redesigned into a pure north south line running between Guangzhou East Railway station to reach Panyu District. A branch line was added between Tiyu Xilu station and Tianhe Coach Terminal station.[8] The change was done in response with the local government's "Southern Expansion" plan to develop the southern areas of Guangzhou.[8] This plan required faster transportation links with Panyu District and the new CBD. At the time limited ridership of the first phases of Line 1 and 2 as well as underestimated urban growth rates lead to downscaling of Line 3's trains.[9] The line would use three car Type B trains instead of higher capacity six car Type A trains used in Line 1 and 2; assuming that capacity shortfalls would be mitigated by running a more frequent service, with an ultimate train configuration of six cars in the future as demand slowly increases.[10] Additionally, a separate Airport Express line between Guangzhou's New Baiyun International Airport and the new CBD was proposed.[11]

Construction the first section of Line 3 between East Guangzhou Railway station and officially commenced with groundbreaking on the experimental segment at Datang station in 2001. On January 26, 2003, construction work at Datang was completed and capped.[12] On February 8, 2003 tunnel boring machines begin boring tunnels on the first section of Line 3.[13] Tunnel boring machines beginning boring tunnels on a section of Line 3 at Tiyu Xilu station. Tiyu Xilu Station will use cut-and-cover construction with a bored section in the middle where it runs under Line 1 with only 80 cm (31 in) of cover.[14] On May 30, 2003 Construction work at Shiqiao station was completed and capped one month ahead of schedule.[15] At the same time, Lijiao station begin construction works.[16] 99 sets of escalators were purchased from Hitachi for the project.[17] The entire project was opened in stages between 2005 and 2006.

North South Express Line

During construction of the initial segment, Line 3 and the Airport Express Line were redesigned and now planned as a single project that begins to resemble its configuration today; A line from Baiyun International Airport to Haibang station via Zhujiang New Town and Panyu Square.[7] The Airport Express Line was merged into Line 3 as the Line 3 Phase 2 project. The expected long term peak demand section of the Phase 2 project is 20,000 passengers per hour per direction.[18] This allowed for the use of Line 3's three car Type B trains on the Airport Line, again assuming that capacity shortfalls would be mitigated by running a more frequent service, with an ultimate train configuration of six cars in the future. Additionally, passing loops and higher speed (140 km/h (87 mph)) operations were proposed for the Airport Line to allow for distinct airport express and regular local services similar to the MTR Tung Chung line and Airport Express in Hong Kong.[19] The express services would run between Guangzhou Baiyun International Airport and Tiyu Xilu and only stop at what is today Jiahewanggang, Yantang, Guangzhou East railway stations.[19] The Phase 2 Project extends Line 3 north to the new airport on a mostly elevated alignment.[20] In 2007, 17 km (10.56 mi) of Phase 2 line also redesigned to run underground instead of elevated at a cost of an additional 1 billion Yuan.[21][22] With the redesigned underground alignment, passing loops for express services were removed to control construction costs.[19] The line was now completely transformed into a north south express line with wide stop spacings and 120 km/h (75 mph) operation in suburban sections instead of a local metro line, with aspects of an express railway link, as first envisioned.[23] Later Yongtai station and Gaozeng station was added to the plan the latter station added in anticipation for Line 9. On October 30, 2010 Line 3 Phase 2 entered operation.[24]

Congestion

In 2010, after the completion of Phase 2, Line 3 has become the most important north-south traffic artery in the urban area of Guangzhou. This is a far cry from the peripheral circulator line it was originally envisioned to be in the 1990s. Massive developments at the Zhujiang New Town CBD and strong population growth of Guangzhou as a whole, created unforeseen high demand and heavy congestion for the line which forced new B2 and B4 series six car trains to be ordered and existing B1 series three car trains were linked together to form six car sets, decades ahead of the original timeline.[25][26] The new B2 and B4 series trains will have luggage racks to support Line 3's role as an airport rail link.[26] The new trains gradually allowed the line to operate to its ultimate configuration of six car type B trains running just at two minute headways. Severe congestion continued to plague the line even at its ultimate design configuration as demand continued to increase. In June 2014, the maximum full load rate in the morning peak of the whole line of Line 3 was as high as 136%, appearing in the interval between Kecun Station and Guangzhou Tower Station.[27] In 2015, with daily average ridership reaching over 1.5 million passengers per day, several rows of seats and all luggage racks where removed from all trains in an attempt to increase capacity.[28][29] In June 2017, the ridership of Line 3 has grown to average over 2 million passengers per day.[30] In March 2018, the whole line heading in the peak direction of the Zhujiang New Town CBD exceeded 100% capacity during the AM peak period with a maximum full load rate exceeding 120% in the section from Yantang Station to Guangzhou East Station on the Airport Line.[31] The busiest section of Line 3 carries over 60,000 pphpd in 2018,[32] multiples over the long term 20,000 pphpd volume projected during the Airport Line's construction. By 2020, the most congested section of Line 3 reached 150% capacity.[33] Peak period headways have been reduced to every 1 minute 58 seconds and now reaches fleet and signal system capacities.[31] Line 18 and the proposed Line 26 are expected to relieve the congestion of Line 3.

Eastern extension

A further extension east of Haibang Station to Hai'ou Island and eventually across the Pearl River to Dongguan was proposed in 2007. In 2017, the Guangzhou Municipal Land Planning Commission approved the planning for Line 3 to be extended to Hai'ou Island.[34] However, the extension eastward beyond Panyu Square station was approved by National Development and Reform Commission to only reach Haibang station as part of Guangzhou's (2015–2025) subway expansion plan in March 2018.[35] It was revealed that the extension to Hai'ou Island is reserved for future planning.[35] The extension is 9.58 km long as will add four new stations and connect Line 3 to Line 4.[36] Construction of this extension started November 19, 2018.[37] It opened just under 6 years later on November 1, 2024.[38]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Kecun — Guangzhou East Railway Station 26 December 2005 7.8 km (4.85 mi) 5 (northern section)
Panyu Square — Kecun 30 December 2006 19.6 km (12.18 mi) 7 (southern section)
Tiyu Xilu — Tianhe Coach Terminal 7.5 km (4.66 mi) 5 (spur section)
Airport South — Guangzhou East Railway Station 30 October 2010 29.3 km (18.21 mi) 10 Northern extension
Gaozeng 28 December 2017 Infill station 1 Line 9 connector
Airport North — Airport South 26 April 2018 1.23 km (0.76 mi) 1 Airport extension
Haibang — Panyu Square 1 November 2024[38] 9.6 km (5.97 mi) 4 Eastern extension
Close

Train service

Due to the existence of a branch in the middle of the line, and to balance demand for travel in all directions, there are a number of different service patterns operated on Line 3.

The following services run in both directions at all times:[39]

  • Airport North - Tiyu Xilu
  • Airport North - Panyu Square
  • Airport North - Haibang
  • Tianhe Coach Terminal - Panyu Square
  • Tianhe Coach Terminal - Haibang

During the morning peak, there are additional short working services:[39]

  • Tonghe - Tiyu Xilu
  • Tianhe Coach Terminal - Dashi
  • Airport North - Dashi

Other terminating stations (e.g. Jiahewanggang) are also possible when trains are entering or leaving service.

To assist passengers with identifying the correct service, trains bound for stations between Airport North and Tiyu Xilu (ie. the North Branch) will show on platform screens in green.[39]

Stations

  • N - Northern extension (Airport Branch)
  • M - Main line
  • MN - Thru Services
  • OSI - Out-of-station interchange (only available for IC cards users)
More information N, M ...
N M MN Station
No.
Station name Connections Future Connections Distance
km
Location
English Chinese
301-4 Haibang 海傍  4  414 0.00 0.00 Panyu
301-3 Haichong Lu 海涌路 2.00 2.00
301-2 Shiqinan 石碁南 1.90 3.90
301-1 Bangjiang 傍江 3.10 7.00
301 Panyu Square 番禺广场  18  1803  22  2201 2.40 9.40
302 Shiqiao 市桥 3.86 13.26
303 Hanxi Changlong 汉溪长隆  7  705 PRDIR  GH  6.27 19.53
304 Dashi 大石 PRDIR  ER  (Dashi East) 2.44 21.97
305 Xiajiao 厦滘 2.85 24.82
306 Lijiao 沥滘  Guangfo  GF25 1.85 26.67 Haizhu
307 Datang 大塘  11  1130 2.57 29.24
308 Kecun 客村  8  823 2.02 31.26
309 Canton Tower 广州塔  APM  APM01
Canton Tower station (Tram)  THZ1  THZ101 OSI:  12  (Chigang Pagoda 1218)
1.15 32.41
310 Zhujiang New Town 珠江新城  5  510 1.51 33.92 Tianhe
311 Tiyu Xilu 体育西路  1  114 Guangzhou Bus Rapid Transit GBRT
OSI:  APM  (TianhenanAPM07)
 10 
OSI:  13  (Huacheng Square North) 1315
1.31 35.23
312 Shipaiqiao 石牌桥 Guangzhou Bus Rapid Transit GBRT 1.34 36.57 Tianhe
313 Gangding 岗顶 Guangzhou Bus Rapid Transit GBRT 0.85 37.42
314 South China Normal University 华师  11  1106 0.88 38.30
315 Wushan 五山 1.59 39.89
316 Tianhe Coach Terminal 天河客运站  6  621 2.59 42.48
317 Linhexi 林和西  APM  APM09 1.15 36.38 Tianhe
318 Guangzhou East Railway Station 广州东站  1  116  11  1108
 GS  Guangzhou East railway station GGQ
 18  1.09 37.47
319 Yantang 燕塘  6  620 1.07 38.54
320 Meihuayuan 梅花园 1.90 40.44 Baiyun
321 Jingxi Nanfang Hospital 京溪南方医院 1.36 41.80
322 Tonghe 同和 1.39 43.19
323 Yongtai 永泰 3.34 46.53
324 Baiyundadaobei 白云大道北 0.85 47.38
325 Jiahewanggang 嘉禾望岗  2  224  14  1409 2.25 49.63
326 Longgui 龙归 6.30 55.93
327 Renhe 人和  22  5.37 61.30
328 Gaozeng 高增  9  911 2.46 63.76
329 Airport South (Terminal 1) 机场南(1号航站楼) Guangzhou Baiyun International Airport CAN PRDIR  ER   22  3.81 67.57 Huadu
330 Airport North (Terminal 2) 机场北(2号航站楼)  22  Guangzhou Baiyun International Airport CAN PRDIR  ER  1.23 68.80
Close

Future expansion

Line 10

The Tiyu Xilu-Tianhe Coach Terminal Section is planned to no longer operate as part of Line 3. The Shipaiqiao-Tianhe Coach Terminal Section will be transferred to Line 10, with the remaining Main and Northern sections being combined into one single service.

Rolling stock

At the time of introduction Line 3 trains were one of the fastest subway trains in China when initially introduced, reaching up to 120 km/h (75 mph) in service.[40] As of 2020 there is a fleet of 71 six car trains serving Line 3.[41] To accommodate increased fleet requirements for the eastern extension, an additional 10 six car trainsets have been ordered.[42] In August 2020, plans were announced a further 18 additional trains to be purchased for Line 3 to reduce headways and improve capacity.[43] This will push the fleet serving Line 3 to 99 trainsets.[41]

More information Type, Time of manufacturing ...
Type Time of manufacturing Series Sets Assembly Notes
Type B 2005–2007 B1 20 Mcp+T+Mcp=Mcp+T+Mcp Manufactured by CRRC Zhuzhou Locomotive and Siemens Mobility initially as 40 three car sets but later reformed into 20 six car sets.[40][44]
2009–2011 B2 25 Mc+Tp+M+M+Tp+Mc First batch manufactured by CRRC Zhuzhou Locomotive[45]
2011–2012 B4 26 Mc+Tp+M+M+Tp+Mc Second batch manufactured by CRRC Zhuzhou Locomotive
2021–2023 B10 10 Mc+Tp+M+M+Tp+Mc Third batch manufactured by CRRC Zhuzhou Locomotive
2022–2023 B11 18 Mc+Tp+M+M+Tp+Mc Manufactured by CRRC Changchun Railway Vehicles
Close

Notes

References

Related Articles

Wikiwand AI