List of Singapore MRT and LRT rolling stock

From Wikipedia, the free encyclopedia

The rolling stock on Singapore's Mass Rapid Transit (MRT) and Light Rail Transit (LRT) includes several models of electric multiple units and people mover systems respectively. They are primarily operated by SBS Transit and SMRT Trains.

Mass Rapid Transit (MRT) rolling stock

Current

More information Line, Generation ...
Line Generation Stock Manufacturer(s) Assembly Image Trainset statistics Speed Power Introduction Cost
Number of train sets Cars per train set Total number of cars Car length Train set length Car width Car height Trainset capacity Seats
North–South Line East–West Line 4th C151A Kawasaki Heavy Industries
& CSR/CRRC Qingdao Sifang
Qingdao, China 35 6 210[1][2] 23.83m (DT)
22.8m (M)
138.86m 3.2m 3.7m 1,920 passen­gers 292 90 km/h (56 mph) (design)

80 km/h (50 mph) (service)

750 V DC third rail 27 May 2011; 15 years ago (2011-05-27) S$368 million[3]
5th C151B 45 270 16 April 2017; 9 years ago (2017-04-16) S$281.5 million[4]
6th C151C 12 72 280 30 September 2018; 7 years ago (2018-09-30)[5] $136.8 million[6][7]
7th R151 Alstom (formerly Bombardier) & CRRC Changchun Chang­chun, China 106 636 228 4 June 2023; 3 years ago (2023-06-04)[8][9] S$1.5 billion[10]
North East Line 1st C751A Alstom Valen­ciennes, France 25 150 23.65m (DT)
22.8m (Mp/Mi)
138.5m 296 (standard)
240 (high capacity)
100 km/h (62 mph) (design)

90 km/h (56 mph) (service)

1,500 V DC overhead catenary 20 June 2003; 23 years ago (2003-06-20) $260 million
2nd C751C Alstom & Shanghai Electric Shanghai, China 18 108 296 1 October 2015; 10 years ago (2015-10-01) S$234.9 million[11][12]
3rd C851E Alstom Barcelona, Spain 6 36 28 July 2023; 3 years ago (2023-07-28) S$249.9 million[13][14][a]
Circle Line 1st C830 Valen­ciennes, France 40 3 120 23.65m (Mc)
22.8m (T)
70.1m 931 passen­gers 146 90 km/h (56 mph) (design)

80 km/h (50 mph) (service)

750 V DC third rail 28 May 2009; 17 years ago (2009-05-28) S$282 million[15]
2nd C830C Alstom & Shanghai Electric Shanghai, China 24 72 26 June 2015; 11 years ago (2015-06-26) S$134 million[11][12]
3rd C851E Alstom Barcelona, Spain 23 69 13 April 2026; 3 months ago (2026-04-13)[16] S$249.9 million[13][14][b]
Downtown Line 1st C951 Bombardier & CNR/CRRC Changchun Chang­chun, China 92 276 23.65m (DM)
22.8m (T)
130 22 December 2013; 12 years ago (2013-12-22) S$689.9 million[17][18]
Thomson–East Coast Line 1st T251 Kawasaki Heavy Industries
& CRRC Qingdao Sifang
Qingdao, China 91 4 364 23.65m (DM)
22.8m (Mc/Tc)
92.9m 1,280 passen­gers 156 100 km/h (62 mph) (design)

90 km/h (56 mph) (service)

31 January 2020; 6 years ago (2020-01-31) S$749 million[19][20]
Close

Future

More information Line, Generation ...
Line Generation Stock Manufacturer(s) Assembly Image Trainset statistics Speed Power Introduction Cost
Number of train sets Cars per train set Total number of cars Car length Train set length Car width Car height Trainset capacity Seats
Jurong Region Line 1st J151 Hyundai Rotem[21] Changwon, South Korea 62 3 (initial)
4 (final)
186 (initial) 18.6m
(initial)[22]
55.8m (initial)[22] 2.75m[22] TBA 600 passengers
(3-car config)
800 passengers
(4-car config)
TBA 70 km/h (43 mph) (design) 750 V DC third rail Mid-2028; 1 year's time S$416.5 million[23]
Cross Island Line 1st CR151 CRRC Qingdao Sifang Qingdao, China 44 6 (initial) 8 (final) 264 (initial) TBA 90 km/h (56 mph) (service) 1,500 V DC overhead conductor rail 2030; 4 years' time (2030) S$589 million
Close

Retired

More information Line, Generation ...
Line Generation Stock Manufacturer(s) Assembly Image Trainset statistics Speed Power Service Cost
Number of train sets Cars per train set Total number of cars Car length Train set length Car width Car height Trainset capacity Seats Introduction Retirement
North–South Line East–West Line 1st C151 Kawasaki Heavy Industries, Nippon Sharyo, Tokyu Car Corporation, & Kinki Sharyo Kobe, Japan[24] 66 6 396 23.65m (DT)
22.8m (M)
138m 3.2m 3.7m 1,920 passen­gers 372 (original)
296 (refur­bished)
90 km/h (56 mph) (design)

80 km/h (50 mph) (service)

750 V DC third rail 7 November 1987; 38 years ago (1987-11-07) 26 September 2025; 10 months ago (2025-09-26)[25] S$581.5 million[26][27]
2nd C651 Siemens Vienna, Austria 19 114[28][29] 23.65m (DT)
22.8m (M)
372 (unmodified) 2 May 1995; 31 years ago (1995-05-02) 27 November 2024; 20 months ago (2024-11-27)[30] S$259 million[31]
3rd C751B Kawasaki Heavy Industries
& Nippon Sharyo
Kobe, Japan 21 126[32][33][c] 23.83m (DT)
22.8m (M)
138.86m 272 28 January 2000; 26 years ago (2000-01-28)[34] 7 December 2024; 20 months ago (2024-12-07)[35] S$231 million
Close

Light Rail Transit (LRT) rolling stock

Current

More information Line, Generation ...
Line Generation Stock Supplier Image Trainset statistics Speed Power supply (third rail) Service Cost
Cars per train set Total number of cars Introduction Retirement Decommissioned
Bukit Panjang LRT 2nd C801A Bombardier 1-2 13 55 km/h (34 mph) (design)

48 km/h (30 mph) (service)

600 V 3-phase AC at 50 Hz 19 November 2014; 11 years ago (2014-11-19) N/a N/a TBD
3rd C801B Alstom & CRRC Nanjing Puzhen 19 1 August 2024; 2 years ago (2024-08-01)
Sengkang LRT / Punggol LRT 1st C810 Mitsubishi 41 80 km/h (50 mph) (design)

70 km/h (43 mph) (service)

750 V DC 18 January 2003; 23 years ago (2003-01-18) 2025 – 2028[36] 5 cars
2nd C810A 16 5 April 2016; 10 years ago (2016-04-05) N/a N/a
3rd C810D 2 50 15 July 2025; 12 months ago (2025-07-15) S$526 million[37]
Close

Retired

More information Line, Generation ...
Line Generation Stock Supplier Image Trainset statistics Speed Power supply (third rail) Service
Cars per train set Total number of cars Introduction Retirement
Bukit Panjang LRT 1st C801 Bombardier 1-2 19 55 km/h (34 mph) (design)

48 km/h (30 mph) (service)

600 V 3-phase AC at 50 Hz 6 November 1999; 26 years ago (1999-11-06) 17 October 2025; 9 months ago (2025-10-17)[38]
Close

Work trains

SMRT Trains was known to use the following vehicles for maintenance of way as of 2015:[39]

More information Stock, Purpose ...
Stock Purpose Manufacturer Number used (as of 2015) Crew size Weight Speed
Track tamping vehicle Tamp ballasts while simultaneously measuring and correcting track alignments Plasser & Theurer 2 5 (minimum) 37/63 tons Max. 19 km/h (self-propelled)
Multi-function Vehicle Detect internal cracks within the rail in real time; check the geometry of the running rail and third rail. Tamper,
Plasser & Theurer[40]
at least 2 4 (minimum) 32 tons 18 km/h (self-propelled),
40 km/h (max speed)
Rail grinding vehicle Re-profile the rail heads and eliminate rail corrugation to reduce track stresses and extend the service life of the rail Speno 2
(2 earlier units were retired and presumably sold off.[41][42])
4 (minimum) 118 tons 18 km/h (self-propelled),
50 km/h (hauled by locomotive)
Viaduct Inspection Wagon Inspect elastomer bearing mounted between the concrete grinders and columns Unknown Unknown 4 (minimum) + 1 (External Professional Engineer) 36 tons 50 km/h (hauled by locomotive)
CKG diesel locomotive Shunt passenger trains within Bishan Depot CKG[43] 2; previously 10[43] 2 26 tons 18 km/h
Deli diesel locomotive Provide propulsion for maintenance wagons and other machinery Changzhou Kate Mining Machinery Engineering Co., Ltd.[44] 19 56 tons 50 km/h
Schöma electric locomotive Schöma 4 34 tons 50 km/h
Tunnel cleaning wagon Use high pressure water jets to clean tracks, third rail cover, mounting brackets alongside tracks and lower portion of tunnel walls Unknown Unknown 2 41 tons 50 km/h (hauled by locomotive)
Heavy crane vehicle Lift heavy objects of up to 3-tons. Unknown Unknown 1 operator, 1 rigger, 1 lifting supervisor 60 tons Limited to 18 km/h
Close

In addition, SBS Transit has used a two-car MFV supplied by a joint venture between Plasser and Theurer and Speno and a railgrinder from Harsco[45] and the Land Transport Authority is known to have procured multi-function vehicles and railgrinders from MERMEC of Italy and Harsco respectively for the Downtown Line and Thomson–East Coast Line,[46][47][48][49] general maintenance vehicles for the Downtown Line from Gemac Engineering Machinery,[47] as well as Bo-Bo battery-electric locomotives from CRRC Zhuzhou Locomotive.[50] Engineering trains are also known to be interchangeable across different lines as shown with photos of a transfer of a multi-function vehicle between Bishan Depot and Kim Chuan Depot.[51]

Contractors such as Gammon Construction are also known to have brought in their own work trains such as tampers for trackwork projects; SMRT used up to 14 road-rail vehicles provided by Gammon during the sleeper replacement from 2013 to 2016.[52][53]

Notes

  1. Contract covers combined cost of acquiring 36 C851E cars for the North East Line and 33 C851E cars for the Circle Line for a total of 69 cars.
  2. Contract covers combined cost of acquiring 36 C851E cars for the North East Line and 33 C851E cars for the Circle Line for a total of 69 cars.
  3. Kawasaki Heavy Industries manufactured 66 cars and Nippon Sharyo manufactured 60 cars.

References

Related Articles

Wikiwand AI