Longdong railway station

From Wikipedia, the free encyclopedia

Hanyu PinyinLóngdòng Zhàn
Hanyu PinyinLóngdòng Zhàn
Longdong

龙洞
PRDIR
Exterior
Chinese name
Simplified Chinese龙洞站
Traditional Chinese龍洞站
Transcriptions
Standard Mandarin
Hanyu PinyinLóngdòng Zhàn
Yue: Cantonese
Yale RomanizationLùhngduhng Jaahm
JyutpingLung4dung6 Zaam6
General information
LocationGuangshan 1st Road (广汕一路)
Longdong Subdistrict, Tianhe District, Guangzhou, Guangdong
China
Coordinates23°11′31.42″N 113°22′31.48″E / 23.1920611°N 113.3754111°E / 23.1920611; 113.3754111
Owned byPearl River Delta Metropolitan Region intercity railway
Operated byGuangdong Intercity Railway Operation Co., Ltd.
Line     Guangzhou East Ring intercity railway
Platforms2 (1 island platform)
Tracks2
ConnectionsGuangzhou Metro  6  Longdong
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeUGQ (Pinyin: LDO)
History
Opened29 September 2025 (3 months ago) (2025-09-29)
Services
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Pearl River Delta Metropolitan Region Intercity Railway Following station
Dayuan
towards Huadu
Guangzhou East Ring intercity railway Cencun
towards Panyu
Transfer at Longdong
Preceding station Guangzhou Metro Following station
Botanical Garden
towards Xunfenggang
Line 6
transfer at Longdong
Kemulang
towards Xiangxue
Location

Longdong railway station (simplified Chinese: 龙洞站; traditional Chinese: 龍洞站; pinyin: Lóngdòng Zhàn; Cantonese Yale: Lùhngduhng Jaahm) is a station on Guangzhou East Ring intercity railway located in Tianhe District, Guangzhou, Guangdong, China.[1] It opened on 29 September 2025.[2]

Entrances/exits

The station has an underground island platform.[3] It also has a cooling tower.[4][5]

The station has 4 points of entry/exit. As this station is connected to the metro station, the entrances/exits of the intercity stations are lettered from E to distinguish from the entrances/exits of the metro station, which are lettered A-D. All exits have accessible ramps.

  • E: (Not open) Wheelchair user access
  • F: Guangshan 1st Road Wheelchair user access
  • G: Guangshan 1st Road, Guangzhou Metro  6  Longdong Wheelchair user access
  • H: (Not open) Wheelchair user access

History

On 1 January 2021, the second phase of traffic relief of the large-mileage open-cut section was completed.[6] On 23 May 2022, the station topped out.[5]

The right line tunnel between this station and Dayuan broke through on 13 October 2022.[7]

On 29 September 2025, the station opened.[2]

Construction site (January 2023)

Transfer

The station provides interchange to Guangzhou Metro Line 6 via an out-of-system interchange (OSI).

References

Related Articles

Wikiwand AI