BTM Layout metro station

Namma Metro's Yellow Line metro station From Wikipedia, the free encyclopedia

BTM Layout is an elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

LocationMarenahalli/Outer Ring Road, BTM Layout, Bengaluru, Karnataka 560076
Coordinates12.91656°N 77.60825°E / 12.91656; 77.60825
System
Namma Metro station
Quick facts General information, Location ...
BTM Layout
Final stages of construction from Ragigudda - Central Silk Board Flyover
General information
LocationMarenahalli/Outer Ring Road, BTM Layout, Bengaluru, Karnataka 560076
Coordinates12.91656°N 77.60825°E / 12.91656; 77.60825
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels3
ParkingTwo-Wheeler Parking only
AccessibleYes Disabled access
ArchitectHCC - URC Construction JV
Other information
StatusOperational and Staffed
Station codeBTML
History
Opened10 August 2025; 7 months ago (10 August 2025)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Jayadeva Hospital Yellow Line Central Silk Board
Location
Close

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the BTM Layout metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro. On 16 May 2017, HCC-URC Construction JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the joint venture, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]

Station layout

BTM Layout track layout
Station with two tracks and two side platforms
**      &      - Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Eastbound
Towards → Delta Electronics Bommasandra
Next Station: Central Silk Board
Change at the next station for Blue Line
Platform 1
Westbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Jayadeva Hospital
Change at the next station for Pink Line
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits

There are two entry/exit points – A and B. Commuters can use either of the points for their travel.

See also

References

Related Articles

Wikiwand AI