Biocon Hebbagodi metro station

Namma Metro's Yellow Line metro station From Wikipedia, the free encyclopedia

Biocon Hebbagodi (formerly called as Hebbagodi) is an elevated metro station on the Yellow Line of the Namma Metro serving the Hebbagodi suburban area of Bengaluru.

The main Hebbagodi depot for the maintenance of all Yellow Line trainsets

LocationVeerasandra, Hebbagodi, Bommasandra, Karnataka 560099
Coordinates12.82909°N 77.68133°E / 12.82909; 77.68133
System
Namma Metro station
Quick facts General information, Location ...
Biocon Hebbagodi
Entrance A in July 2025
General information
LocationVeerasandra, Hebbagodi, Bommasandra, Karnataka 560099
Coordinates12.82909°N 77.68133°E / 12.82909; 77.68133
System
Namma Metro station
OwnerNamma Metro
OperatorBangalore Metro Rail Corporation Ltd (BMRCL)
LineYellow Line
Platforms2 (2 side platforms)
Tracks2
Construction
Structure type
Elevated
Platform levels
2
ParkingTwo wheeler parking pnly
AccessibleYes Disabled access
ArchitectITD - ITD Cementation India JV
Other information
StatusOperational and staffed
Station codeHBGI
History
Opened10 August 2025; 12 months ago (10 August 2025)
Former namesHebbagodi
Services
Preceding station Namma Metro Following station
Huskur Road Yellow Line Delta Electronics Bommasandra
Terminus
Location
Close

Adjoining the station is the depot for the maintenance of all Yellow Line trainsets.

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Hebbagodi metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements. In 2020, Biocon Group signed an agreement with the BMRCL to contribute ₹65 crore towards the construction of the metro station and donated land worth ₹30 crore for the project. Consequently, Biocon obtained the naming rights for the station for 30 years, and the station was renamed from Hebbagodi to Biocon Hebbagodi.[2][3]

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[4][5][6][7][8][9][10] The opening was delayed from May 2025 as previously announced by the Namma Metro managing director Maheshwar Rao.[11][12][13]

Station layout

Biocon Hebbagodi track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics Bommasandra
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Huskur Road
Side platform | Doors will open on the left Disabled access