Kudlu Gate metro station

From Wikipedia, the free encyclopedia

LocationHosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Coordinates12°53′24″N 77°38′21″E / 12.88992°N 77.63929°E / 12.88992; 77.63929
System
Namma Metro station
Kudlu Gate
Final stages of this metro station as of April 2024
General information
LocationHosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Coordinates12°53′24″N 77°38′21″E / 12.88992°N 77.63929°E / 12.88992; 77.63929
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingTwo-Wheeler Parking only
AccessibleYes Disabled access
ArchitectITD - ITD Cementation India JV
Other information
StatusOperational and Staffed
Station codeMSRN
History
Opened10 August 2025; 5 months ago (10 August 2025)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Hongasandra Yellow Line Singasandra
Location

Kudlu Gate is an elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bengaluru, India.

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Kudlu Gate metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]

Station layout

Kudlu Gate track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics Bommasandra
Next Station: Singasandra
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Hongasandra
Side platform | Doors will open on the left Disabled access
L2

Here are some of the metro station captures shown below:-

See also

References

Related Articles

Wikiwand AI