Beratena Agrahara metro station

From Wikipedia, the free encyclopedia

LocationPragathi Nagar, Basapura, Bengaluru, Karnataka 560100
Coordinates12°51′50″N 77°39′29″E / 12.86385°N 77.65798°E / 12.86385; 77.65798
System
Namma Metro station
Beratena Agrahara
This metro station as of July 2025
General information
LocationPragathi Nagar, Basapura, Bengaluru, Karnataka 560100
Coordinates12°51′50″N 77°39′29″E / 12.86385°N 77.65798°E / 12.86385; 77.65798
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineYellow Line
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Delta Electronics Bommasandra
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ParkingTwo-Wheeler Parking only
AccessibleYes Disabled access
ArchitectITD - ITD Cementation India JV
Other information
StatusOperational and Staffed
Station codeHOSR
History
Opened10 August 2025; 5 months ago (10 August 2025)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Hosa Road Yellow Line Electronic City
Location

Beratena Agrahara is an elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bengaluru, India.

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Beratena Agrahara metro station along the 6.418 km Reach 5 – Package 1 section (Bommasandra - Hosa Road) of the 18.825 km Yellow Line of Namma Metro. On 25 March 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]

Station layout

Beratena Agrahara track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Delta Electronics Bommasandra
Next Station: Electronic City
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road
Next Station: Hosa Road
Side platform | Doors will open on the left Disabled access
L2

Here are some of the metro station captures shown below:-

See also

References

Related Articles

Wikiwand AI