Roserock Solar

Photovoltaic power station in Pecos County, Texas, USA From Wikipedia, the free encyclopedia

The Roserock Solar Facility is a 157 MWAC (212 MWp) photovoltaic power station in Pecos County, Texas. It was the largest solar project in Texas when completed in late 2016. The facility is dispersed over about 1300 acres of land already developed for oil and gas by Apache Corporation. It is located about a mile north of Interstate-10, and 20 miles west of Fort Stockton.[1][2]

CountryUnited States
Coordinates30°57′37″N 103°18′24″W
StatusOperational
Quick facts Country, Location ...
Roserock Solar Facility
CountryUnited States
LocationPecos County, Texas
Coordinates30°57′37″N 103°18′24″W
StatusOperational
Commission dateDecember, 2016
Construction cost$275 million
OwnersSouthern Company and Recurrent Energy
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area1,300 acres (5.26 km2)
Power generation
Make and model700,000 CS6X-P modules
Nameplate capacity212 MWp, 157 MWAC
Capacity factor26.3% (average 2017-2020)
Annual net output362 GW·h, 279 MW·h/acre
Close

Facility details

The project was developed by Recurrent Energy, which was acquired by the Sharp Corporation in late 2010.[3] Recurrent Energy was subsequently acquired by the Chinese photovoltaic panel manufacturer Canadian Solar in February 2015.[4] Construction on the project was financed for about $275 million[5] and began in November 2015. The engineering, procurement, and construction contractor was McCarthy Building Companies and the project employed about 480 workers at its peak.[1]

The project uses approximately 700,000 CS6X-P series panels (polycrystalline, ~300 Wp each)[6] from Canadian Solar that are mounted on single-axis trackers.[1] It began sending electricity to the grid in late November 2016.[7] On November 30, 2016, Recurrent Energy sold a controlling interest in the completed facility to Southern Power. The electricity is being sold to Austin Energy under a 20-year power purchase agreement.[5]

Electricity production

More information Year, Jan ...
Generation (MW·h) of Roserock Solar [7]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2016 6,49520,330 26,825
2017 27,37129,28039,76737,91641,44237,49641,30136,70231,01931,13221,14520,819 396,390
2018 26,47925,71030,53524,28611,74918,36820,46215,30118,01319,46423,80718,111 252,285
2019 21,15222,58718,01141,15139,98843,45544,44342,47732,02132,21722,37825,070 384,950
2020 24,34923,97228,61440,46444,65046,17346,81343,10133,04832,88927,79622,709 414,578
2021 25,97522,362
Average Annual Production (years 2017–2020) --->362,051