Centinela Solar Energy Project

Photovoltaic power station in Imperial County, California From Wikipedia, the free encyclopedia

The Centinela Solar Energy Project is a 170 megawatt (MW) photovoltaic power plant located on 2,067 acres (836 ha) of previously disturbed private land southwest of El Centro, California. The project planned to provide at least 235 jobs, generate more than $30 million in tax revenue over its life-time, and deliver enough electricity to power about 82,500 homes. Imperial County gave a green-light to the solar power plant on December 27, 2011, and Secretary of the Interior Ken Salazar approved the right-of-way over 19 acres for the connecting power line on public land.[1]

CountryUnited States
Coordinates32°40′55″N 115°39′38″W
StatusOperational
Quick facts Country, Location ...
Centinela Solar Energy Project
CountryUnited States
LocationMount Signal, California
Coordinates32°40′55″N 115°39′38″W
StatusOperational
Commission date2013; 13 years ago (2013)
Solar farm
Type
Site area2,067 acres (836 ha)
Power generation
Nameplate capacity170 MW
Annual net output510 GW·h
External links
Websitecentinelasolar.com
Close

The plant went online in tests on July 26, 2013.[2][3]

It received a safety award in 2015.[4]

Electricity production

More information Year, Jan ...
Generation (MW·h) of Centinela Solar Energy [5]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2013 2824,88610,4628,54411,35814,504 50,036
2014 14,60318,19632,01237,60751,87854,12950,28647,86246,08939,78632,95823,830 449,236
2015 28,33935,98546,23751,30054,41750,94152,06350,91739,75436,82733,02330,048 509,851
2016 29,25436,00739,66743,62554,46252,85454,41250,43142,64035,34125,70720,364 484,764
Total1,493,887
Close

References

Related Articles

Wikiwand AI