HBR Layout metro station

Upcoming Namma Metro station under Blue Line From Wikipedia, the free encyclopedia

HBR Layout is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the Hennur area, Residential areas of HBR Layout. This metro station is stated to become operational around December 2026.[2][3][4][5]

Location4th Main Rd, 5th Block, 1st Stage, EXTENSION, HBR Layout, Bengaluru, Karnataka 560043
Coordinates13.0328°N 77.6297°E / 13.0328; 77.6297
System
Namma Metro station
Quick facts General information, Location ...
HBR Layout
Under Construction of this metro station under Phase 2B of Namma Metro's Blue Line as of February 2024
General information
Location4th Main Rd, 5th Block, 1st Stage, EXTENSION, HBR Layout, Bengaluru, Karnataka 560043
Coordinates13.0328°N 77.6297°E / 13.0328; 77.6297
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform (TBC)
Platform-1Krishnarajapura / Central Silk Board
Platform-2KIAL Terminals
Platform numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectNagarjuna Construction Company (NCC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2027; 18 months' time (December 2027) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kalyan Nagar Blue Line
(Under Construction)
Nagawara
Location
Close

History

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the HBR Layout metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

Blue Line Station Layout - To Be Confirmed

HBR Layout track layout (TBC)
P# to Kalyan Nagar **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Kalyan Nagar
Platform #
Westbound
Towards ← Hebbala / KIAL Terminals
Next Station: Nagawara
Change at the next station for Pink Line
Side platform | Doors will open on the left Disabled access
L2