Kodigehalli metro station

From Wikipedia, the free encyclopedia

LocationKodigehalli Gate Amruthnagar, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates13°03′25″N 77°35′38″E / 13.05702°N 77.59386°E / 13.05702; 77.59386
System
Namma Metro station
Kodigehalli
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationKodigehalli Gate Amruthnagar, Byatarayanapura, Bengaluru, Karnataka 560092
Coordinates13°03′25″N 77°35′38″E / 13.05702°N 77.59386°E / 13.05702; 77.59386
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsIsland platform (TBC)
Platform-1 → Hebbala *
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
* (Further extension to Krishnarajapura / Central Silk Board in the future)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2027; 13 months' time (June 2027) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Hebbala
Terminus
Blue Line
(Operational around June 2027)
Jakkur Cross
Hebbala Blue Line
(Operational around December 2027)
Location

Kodigehalli is an upcoming important elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will mainly serve the Brigade Corporate Offices, consisting of Magnum, Opus, Triumph and Caladium. It also serves prime locations including Aster CMI Hospital, Amruthahalli Lake Park, Godrej Woodsman Estate, RMZ Latitude and many restaurants for the general public. This metro station is slated to be operational around June 2027.[2][3][4][5][6]

On November 17, 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodigehalli metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14, 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.[8]

Station layout

Station Layout - To Be Confirmed

Kodigehalli track layout
P#
P#
Station with two tracks and one Island platform
** Under Construction & Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Northbound
Towards → KIAL Terminals
Next Station: Jakkur Cross
Island platform | Doors will open on the right Disabled access
Platform #
Southbound
Towards ← Hebbala **
Change at the next station for Orange Line or Red Line
L2 Note: ** To be further extended to Krishnarajapura / Central Silk Board in the future

See also

References

Related Articles

Wikiwand AI