Under Construction of this metro station under Phase 2B of Namma Metro's Blue Line as of August 2025
General information
LocationAnnaiah Reddy Layout, Banaswadi, Bengaluru, Karnataka 560043
Coordinates13°01′01″N 77°39′37″E / 13.01702°N 77.66035°E / 13.01702; 77.66035
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform (TBC)
Platform-1 → Krishnarajapura / Central Silk Board
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsBus interchange Vijaya Bank Colony Bus Stop
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2027; 19 months' time (December 2027) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kasturinagara Blue Line
(Future Service)
HRBR Layout
Location

Horamavu is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro stations holds the main Horamavu suburban area which is adjacent to Banaswadi, Kalkere and Ramamurthy Nagar, followed by some prime furniture locations like Royaloak Furnitures, Cauvery Furnitures, Damro Furnitures and the famous Horamavu Bridge leading towards Kalkere and Dodda Banaswadi areas. This metro station is slated to become operational around June 2026.[2][3][4][5]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Horamavu metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout

Station Layout - To Be Confirmed

Horamavu track layout (TBC)
P# to Kasturinagara **
P# to HRBR Layout **
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Krishnarajapura / Central Silk Board
Next Station: Kasturi Nagar
Platform #
Westbound
Towards ← Hebbala / KIAL Terminals
Next Station: HRBR Layout
Side platform | Doors will open on the left Disabled access
L2