Kodibeesanahalli metro station

From Wikipedia, the free encyclopedia

LocationKodibeesanahalli, Bengaluru, Karnataka 560103
Coordinates12°56′42″N 77°41′53″E / 12.94504°N 77.69810°E / 12.94504; 77.69810
System
Namma Metro station
Kodibeesanahalli
Under Construction of this metro station as of March 2025 under Phase 2A of Blue Line of Namma Metro
General information
LocationKodibeesanahalli, Bengaluru, Karnataka 560103
Coordinates12°56′42″N 77°41′53″E / 12.94504°N 77.69810°E / 12.94504; 77.69810
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
ConnectionsMainline rail interchange Belandur Road Railway station
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKODI (TBC)
History
OpeningDecember 2026; 11 months' time (December 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Kadubeesanahalli Blue Line
(Future Service)
Marathahalli
Location

Kodibeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the IT Companies like JP Morgan Chase,Adobe, Nutanix Technologies Pvt. Ltd followed by Prestige Tech Park containing corporate and IT companies such as CoinSwitch, Amadeus Software Labs, Juniper Networks, Oracle Tech Hub and Byju's - The Learning App. This metro station is slated to become operational December 2026 instead of June 2026.[2][3][4][5][6]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kodibeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Station Layout - To Be Confirmed

Kodibeesanahalli track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura**
Next Station: Marathahalli
Platform #
Southbound
Towards ← Central Silk Board
Next Station: Embassy TechVillage Kadubeesanahalli
Side platform | Doors will open on the left Disabled access
L2 Note: ** To be further extended to KIAL Terminals in future