Bagalur Cross metro station

From Wikipedia, the free encyclopedia

LocationNH 44, Vinayak Nagar, Kattigenahalli, Bengaluru, Karnataka 560063
Coordinates13°07′14″N 77°36′38″E / 13.12061°N 77.61056°E / 13.12061; 77.61056
System
Namma Metro station
Bagalur Cross
Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro
General information
LocationNH 44, Vinayak Nagar, Kattigenahalli, Bengaluru, Karnataka 560063
Coordinates13°07′14″N 77°36′38″E / 13.12061°N 77.61056°E / 13.12061; 77.61056
System
Namma Metro station
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
LineBlue Line
PlatformsIsland platform (TBC)
Platform-1 → Hebbala *
Platform-2 → KIAL Terminals
Platform Numbers (TBC)
* (Further extension to Krishnarajapura / Central Silk Board in the future)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2027; 13 months' time (June 2027) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Yelahanka
towards Hebbala
Blue Line
(Operational around June 2027)
Doddajala
Yelahanka Blue Line
(Operational around December 2027)
Train services bound for KIAL Terminals will skip Bettahalasuru, Chikkajala and proceed towards Doddajala
Location

Bagalur Cross is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Bagalur area with many educational institutions like Chrysalis High (Yelahanka), Ryan International School, Nitte Meenakshi Institute of Technology followed by prime locations like Zodiac Clothing Company Ltd., Palanahalli Lake Park, Manipal Academy of Higher Education (Bagalur Campus) and BSF Institute of Technology. This metro station is slated to be operational around June 2027.[2][3][4][5][6]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Bagalur Cross metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [8]

Station layout

Station Layout - To Be Confirmed

Bagalur Cross track layout
P#
P#
to Yelahanka **
Station with two tracks and one Island platform
* Skipping Chikkajala & Bettahalasuru
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Northbound
Towards → KIAL Terminals
Next Station: Doddajala *
Island platform | Doors will open on the right Disabled access
Platform #
Southbound
Towards ← Hebbala **
Next Station: Yelahanka
L2 Note: * Skipping Chikkajala & Bettahalasuru - Future Stations
** To be further extended to Krishnarajapura / Central Silk Board in the future